OpenSearch domain connections should be encrypted using the latest TLS security policy

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control checks whether an Amazon OpenSearch Service domain endpoint is configured to use the latest TLS security policy, Policy-Min-TLS-1-2-PFS-2023-10. The control fails if the endpoint is not using this policy or if HTTPS is not enabled. Enforcing the latest version of TLS 1.2 helps secure data in transit by preventing eavesdropping and manipulation through man-in-the-middle attacks.

Remediation

To configure your Amazon OpenSearch Service domain endpoint to use the latest TLS security policy, refer to the Requiring HTTPS for Amazon OpenSearch Service Domains section of the Amazon OpenSearch Service Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers