OpenSearch domains should have at least three data nodes

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This check determines if Amazon OpenSearch Service domains are configured with at least three data nodes. Having a minimum of three data nodes is crucial for ensuring data availability and fault tolerance, especially in case of node failures or maintenance activities. It enhances the resiliency of your OpenSearch cluster by allowing it to continue operating even if one or two nodes become unavailable.

Remediation

To configure an Amazon OpenSearch Service domain with at least three data nodes, refer to the Managing Amazon OpenSearch Service Domains section of the Amazon OpenSearch Service Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers