OpenSearch domains should have fine-grained access control enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control checks whether Amazon OpenSearch Service domains have fine-grained access control (FGAC) enabled. Fine-grained access control provides granular permissions management, including index-level, document-level, and field-level security. The control fails if FGAC is not enabled, as it is required through the advanced-security-options in the OpenSearch parameter update-domain-config. Enabling FGAC enhances data security by offering additional methods to control access to your data on Amazon OpenSearch Service.

Remediation

To enable fine-grained access control for an Amazon OpenSearch Service domain, refer to the Fine-Grained Access Control in Amazon OpenSearch Service section of the Amazon OpenSearch Service Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers