RDS instances should have deletion protection enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control ensures that deletion protection is activated for an RDS instance that uses one of the below specified database engines. Activating deletion protection adds an extra layer of security against accidental or unauthorized deletion of a database. Deletion protection must be disabled before deletion requests can be accomplished.

Applicable Database Engines: mariadb,mysql,custom-oracle-ee,oracle-ee-cdb,oracle-se2-cdb,oracle-ee,oracle-se2,oracle-se1,oracle-se,postgres,sqlserver-ee,sqlserver-se,sqlserver-ex,sqlserver-web

Remediation

To enable deletion protection for an RDS instance, refer to the section Modifying an Amazon RDS instance in the Amazon RDS User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers