AWS Route 53 DNS query logging disabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when a user deletes a Route 53 query logging configuration.

Strategy

Monitor cloudtrail logs where @evt.name is DeleteResolverQueryLogConfig which would stop Route53 Query logging for all of the Amazon VPCs that are associated with the configuration.

Triage and response

  1. Determine if {{@userIdentity.arn}} is expected to perform the {{@evt.name}} API call.
  2. Contact the principal owner and see if this was an API call that was made by the user.
  3. If the API call was not made by the user, rotate the user credentials and investigate what other APIs were successfully accessed.

Changelog

  • 7 April 2022 - Updated rule query and signal message.
  • 5 January 2023 - Updated severity.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers