VPC flow logging should be enabled in all VPCs

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

VPC Flow Logs capture information about the IP traffic to and from network interfaces in your VPCs. This feature provides visibility into rejected network traffic and assists in detecting unusual traffic for enhanced security workflows. It is recommended to enable VPC Flow Logs for packet rejects to monitor and analyze network activity effectively.

Remediation

For instructions on enabling VPC Flow Logs for packet rejects, refer to the Amazon VPC Flow Logs Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers