Site-to-Site VPN connection tunnels should be online

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

A VPN tunnel is an encrypted pathway that allows data to move securely between the customer network and AWS within an AWS Site-to-Site VPN connection. Each VPN connection includes two tunnels, which can operate simultaneously to ensure high availability. Keeping both VPN tunnels active is essential for maintaining a secure and resilient connection between an AWS VPC and your remote network.

Remediation

For instructions on configuring VPN tunnel options, refer to the Modifying Site-to-Site VPN tunnel options section in the AWS Site-to-Site VPN User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers