An AKS Cluster's Kubelet should be allowed to manage iptables

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

It is recommended that kubelets be allowed to manage changes to iptables. This ensures that the iptables configuration remains in sync with the networking configuration of your pods. Manually configuring iptables with dynamic pod network configuration changes might hamper the communication between pods/containers and to the outside world.

Remediation

Choose one of the following remediation methods. For both methods, a restart of the Kubelet service is required afterwards.

Kubelet config file

  1. Add the following JSON to the /etc/kubernetes/kubelet/kubelet-config.json file.
"makeIPTablesUtilChains": true

Executable arguments

  1. Edit the kubelet service file on each worker node and ensure the following parameters are part of the KUBELET_ARGS variable string.
--make-iptables-util-chains:true
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers