Azure diagnostic setting deleted or disabled

Set up the azure integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when a diagnostic setting is deleted which can disable centralized logging and metrics on Azure.

Strategy

Monitor Azure logs where @evt.name is "MICROSOFT.INSIGHTS/DIAGNOSTICSETTINGS/DELETE" and @evt.outcome is Success.

Triage and response

  1. Inspect the diagnostic setting resource which is found in @resourceId.
  2. Verify that the user ({{@usr.id}}) to determine if the removal of the resource is legitimate.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers