Azure Bastion shareable links should not be permitted

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Azure Bastion public links can allow remote access to Azure VMs from untrusted networks. An attacker with a Contributor role or similar level of access on an Azure Bastion could generate a public link to establish persistent connections to Azure VMs.

Rationale

This detection identifies Azure Bastion hosts with enable_shareable_link set to true.

Remediation

  1. Evaluate the need for public links for your Bastion. Allowing public links is not required for general Azure Bastion usage.
  2. If not required, disable the “Shareable link” setting by unchecking the box under the Bastion’s configuration settings.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers