Subnets should be associated with a Network Security Group

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This rule checks whether subnets in Azure are associated with a Network Security Group. Ensuring that subnets are associated with a Network Security Group helps enhance the security posture of the Azure environment by adding an additional layer of protection to network traffic within the subnet.

Remediation

To associate a subnet with a Network Security Group in Azure, follow these steps:

  1. Navigate to the Azure portal and open the ‘Subnets’ blade for the desired virtual network.
  2. Select the subnet that needs to be associated with a Network Security Group, go to the ‘Settings’ tab, and under ‘Security’, associate the desired Network Security Group. For detailed instructions, see: Associate or dissociate a network security group to or from a subnet.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers