Server parameter 'connection_throttling' should be enabled for PostgreSQL Database Server

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Enabling connection_throttling helps the PostgreSQL Database to set the verbosity of logged messages. This in turn generates query and error logs with respect to concurrent connections that could lead to a successful Denial of Service (DoS) attack by exhausting connection resources. A system can also fail or be degraded by an overload of legitimate users. Query and error logs can be used to identify, troubleshoot, and repair configuration errors and sub-optimal performance.

Remediation

From the console

  1. Log in to Azure Portal.
  2. Go to Azure Database for PostgreSQL server.
  3. For each database, click Server parameters.
  4. Search for connection_throttling.
  5. Click ON and save.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers