Secure transfer required should be enabled

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

The secure transfer option enhances the security of a storage account by only allowing requests to the storage account by a secure connection. For example, when calling REST APIs to access storage accounts, the connection must be HTTPS. Any requests using HTTP is rejected when secure transfer required is enabled. When using the Azure files service, connection without encryption fails, including scenarios using SMB 2.1, SMB 3.0 without encryption, and some flavors of the Linux SMB client. Because Azure storage doesn’t support HTTPS for custom domain names, this option is not applied when using a custom domain name.

Remediation

From the console

  1. Go to Storage Accounts.
  2. For each storage account, go to Configuration.
  3. Set Secure transfer required to Enabled.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers