Cisco Duo bypass code created by administrator

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when a Duo bypass code is created by an administrator.

Strategy

This rule monitors Cisco Duo activity logs for the creation of bypass codes by administrators. A bypass code is a temporary passcode created by an administrator for a specific user. These are generally used as “backup codes” to grant enrolled users access to their Duo-protected systems when they have problems with their mobile device, or when they’re temporarily unable to access their enrolled device.

Triage and Response

  1. Investigate the nature of the bypass code creation:
    • Verify if the bypass code creation generated by user {{@usr.email}} from device IP {{@access_device.ip.address}} was authorized and legitimate.
    • Identify the administrator responsible for the action.
  2. If unauthorized or suspicious activity is detected:
    • Disable or review the administrator’s account.
    • Reset any affected user accounts associated with the bypass codes.
    • Initiate an investigation into potential security breaches.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers