AWS Config modified

cloudtrail

Classification:

compliance

Tactic:

Technique:

Framework:

cis-aws

Control:

4.9

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when an attacker is trying to evade defenses by disabling or modifying AWS Config.

Strategy

This rule lets you monitor these AWS Config API calls per CIS-AWS-4.9: Ensure a log metric filter and alarm exist for AWS Config configuration changes:

Triage and response

  1. Determine which if {{@userIdentity.arn}} should have done a {{@evt.name}} to AWS Config.
  2. If the user did not make the API call:
    • Rotate the credentials.
    • Investigate if the same credentials made other unauthorized API calls.

Changelog

  • 1 April 2022 - Updated rule and signal message.
  • 10 October 2022 - Updated severities.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers