Amazon EC2 AMI exfiltration attempt by IAM user

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect a user attempting to exfiltrate an Amazon EC2 AMI Snapshot.

Strategy

This rule lets you monitor the ModifyImageAttribute CloudTrail API calls to detect when an Amazon EC2 AMI snapshot is made public or shared with an AWS account.

This rule also inspects:

  • @requestParameters.launchPermission.add.items.group array to determine if the string all is contained. This is the indicator which means the RDS snapshot is made public.
  • @requestParameters.launchPermission.add.items.userId array to determine if the string * is contained. This is the indicator which means the RDS snapshot was shared with a new or unknown AWS account.

Triage and response

  1. Confirm if the user: {{@userIdentity.arn}} intended to make the RDS snaphsot public.
  2. If the user did not make the API call:
    • Rotate the credentials.
    • Investigate if the same credentials made other unauthorized API calls.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers