SQL database instances should enforce SSL for all incoming connections

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

This control ensures that SSL encryption is enabled for SQL database connections, which include PostgreSQL, MySQL (generation 1 and 2), and SQL Server 2017 instances. Using SSL encryption protects sensitive data such as credentials, database queries, and query outputs from being intercepted through a Man-in-the-Middle (MITM) attack. Enforcing SSL encryption enhances the security of database connections by ensuring that all data exchanged between clients and the Cloud SQL database instance is securely transmitted.

Remediation

To enforce SSL encryption for your database connections, follow the instructions in the Configure SSL for a Cloud SQL instance section of the Google Cloud documentation.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers