The Kubernetes admission controller 'NamespaceLifecycle' should be enabled

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Reject creating objects in a namespace that is undergoing termination. Using the NamespaceLifecycle admission controller plugin ensures that objects cannot be created in non-existent namespaces, and that namespaces undergoing termination are not used for creating the new objects. This is recommended to enforce the integrity of the namespace termination process and also for the availability of the newer objects.

Remediation

  1. Edit the API server pod specification file /etc/kubernetes/manifests/kube-apiserver.yaml on the master node and set the --disable-admission-plugins parameter to ensure it does not include NamespaceLifecycle.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers