The scheduler API service should not be bound to non-loopback insecure addresses

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

The scheduler service should not be bound to non-loopback addresses. The Scheduler API service which runs on port 10251/TCP by default is used for health and metrics information and is available without authentication or encryption. As such, it should only be bound to a localhost interface to minimize the cluster’s attack surface.

Remediation

Edit the Scheduler pod specification file /etc/kubernetes/manifests/kube-scheduler.yaml on the master node and ensure the correct value for the --bind-address parameter. For example, --bind-address=127.0.0.1.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers