Kubernetes Service Created with NodePort

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when a service’s port is attached to the node’s IP.

Strategy

This rule monitors when a create (@http.method:create) action occurs for a service (@objectRef.resource:services) attaching the service’s port to the node’s IP @requestObject.spec.type:NodePort.

Exposing the service’s port to the the node’s IP allows other hosts on the network namespace to access this service.

Triage and response

Determine if the service needs to expose it’s network connection with NodePort access.

Changelog

  • 7 May 2024 - Updated detection query to include logs from Azure Kubernetes Service.
  • 16 July 2024 - Updated detection query to include logs from Google Kubernetes Engine.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers