Kube-proxy configuration file ownership should be assigned to root

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

If kube-proxy is running, ensure that the file ownership of its kubeconfig file is set to root:root. The kube-proxy’s kubeconfig file controls various parameters for the the service in the worker node. You should set its file ownership to maintain the integrity of the file.

Remediation

  1. Run the below command on each worker node:
chown root:root <proxy kubeconfig file>
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers