Kube-proxy configuration file should have permissions of 600 or more restrictive

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

If kube-proxy is running, ensure that the file permissions of the kubeconfig file is set to 600. The kube-proxy’s kubeconfig file controls various parameters for the the service in the worker node. You should set its file permissions to maintain the integrity of the file.

Remediation

Run the below command (based on the file location on your system) on the each worker node:

chmod 600 <proxy kubeconfig file>
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers