Streaming connections should have timeouts enabled

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Timeouts on streaming connections should not be disabled. Setting idle timeouts ensures that you are protected against denial-of-service attacks, inactive connections, and running out of ephemeral ports.

Note: By default, --streaming-connection-idle-timeout is set to four hours, which might be too high for your environment. Setting this to the appropriate time would ensure that such streaming connections are timed out after serving legitimate use cases.

Remediation

  1. If using a Kubelet config file, edit the file to set streamingConnectionIdleTimeout to a value other than 0.
  2. If using command line arguments, edit the kubelet service file /etc/systemd/system/kubelet.service.d/10-kubeadm.conf on each worker node and set the below parameter in KUBELET_SYSTEM_PODS_ARGS variable.
--streaming-connection-idle-timeout=5m
  1. Restart the kubelet service.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers