The kubelet configuration file should have permissions of 600 or more restrictive

Set up the kubernetes integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Ensure that if the kubelet refers to a configuration file with the --config argument, that file has permissions of 600 or more restrictive. The kubelet reads various parameters, including security settings, from the config file. The file should be writable by only the administrators on the system.

Remediation

  1. Run the following command based on the file located in the --config parameter:
chmod 600 /var/lib/kubelet/config.yaml
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers