LastPass vault content export attempt

Set up the lastpass integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when a LastPass user attempts to modify a vault item.

Strategy

This rule monitors LastPass account logs to determine when a vault item is modified. This could indicate an attempt to modify an item.

Triage and response

  1. Investigate the user: {{@usr.name}} who triggered the event {{@evt.name}} involving vault item {{@VID}} within the vault.
  2. If this action was unintended by the user:
    • Rotate the user’s LastPass master password
    • Identify all the items that were modified and rotate the necessary authentication credentials
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers