Redis service publicly accessible

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when multiple external connections are made to the port for Redis (6379).

Strategy

Production instances of Redis should not be publicly accessible. Incoming connections from multiple public IP addresses indicate an exposed instance.

Triage and response

  1. Review all events for connections from unexpected IP addresses.
  2. Move the Redis service to a private network.
  3. Review Related Signals and relevant logs for additional malicious activity.

This detection is based on data from Cloud Network Monitoring.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers