OSSEC Alert: Attack detected

This rule is part of a beta feature. To learn more, contact Support.
ossec-security

Classification:

attack

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when an OSSEC alert of level 15 is raised.

Strategy

This rule monitors OSSEC logs for an alert classified as level 15. OSSEC rules are classified in multiple levels, from the lowest (00) to the maximum level 16. Level 15 references a ‘severe attack’ and immediate attention is necessary.

Triage and Response

  1. Check the attack detected for the system: {{@syslog.hostname}}.
  2. Analyze the rule that triggered, the brief description, and message attached with the log:
    • Rule ID: {{@rule_id}}
    • Description: {{@description}}
    • Log Message: {{@log}}
  3. Contact the system administrator immediately to perform the necessary actions to mitigate the cause. This attack requires urgent attention and this rule has no chance of generating false positives.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers