OSSEC Alert: Unusual spike in authentication failure

This rule is part of a beta feature. To learn more, contact Support.
이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when there are a higher number of failed authentication attempts than usual.

Strategy

This rule monitors logs for unusual spikes in failed authentication attempts using the anomaly detection method.

Triage and Response

  1. Analyze the source and username which have generated the most authentication failure alerts.
  2. Contact the system administrator to take necessary steps by changing the password of the user which has been affected or blocking the source IP from which failed authentication alerts have been generated.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers