Slack manual export downloaded

Set up the slack integration.

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when a Slack manual export has been downloaded.

Strategy

This rule monitors Slack audit logs for when a manual export has been downloaded. With Slack, you can export data from your workspace or Enterprise Grid organization, this includes messages and links to files in public channels, private channels, and direct messages.

Triage and response

  1. Determine if the change taken by {{@usr.email}} is authorized.
  2. If the change was not authorized or was unexpected, begin your organization’s incident response process and investigate.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers