Dynamic linker hijacking attempt

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect attempts to load a malicious library.

Strategy

After an attacker’s initial intrusion into a victim container or host (for example, through a web shell exploit), they may attempt to escalate privileges, evade defenses, or establish persistence by hijacking environment variables such as LD_PRELOAD, or configuration files such as /etc/ld.so.preload/, which the dynamic linker uses to load shared libraries.

Requires Agent version 7.39 or greater

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers