Ensure the Default Umask is Set Correctly For Interactive Users

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Remove the UMASK environment variable from all interactive users initialization files.

Rationale

The umask controls the default access mode assigned to newly created files. A umask of 077 limits new files to mode 700 or less permissive. Although umask can be represented as a four-digit number, the first digit representing special access modes is typically ignored or required to be 0. This requirement applies to the globally configured system defaults and the local interactive user defaults for each account on the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers