Ensure nftables Default Deny Firewall Policy

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Base chain policy is the default verdict that will be applied to packets reaching the end of the chain. There are two policies: accept (Default) and drop. If the policy is set to accept, the firewall will accept any packet that is not configured to be denied and the packet will continue traversing the network stack.

Rationale

It is easier to allow acceptable usage than to block unacceptable usage.

Warning

Changing firewall settings while connected over network can result in being locked out of the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers