Configure ntpd To Run As ntp User

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

ntp is a daemon which implements the Network Time Protocol (NTP). It is designed to synchronize system clocks across a variety of systems and use a source that is highly accurate. More information on NTP can be found at http://www.ntp.org. ntp can be configured to be a client and/or a server. To ensure that ntpd is running as ntp user, Add or edit the OPTIONS variable in /etc/sysconfig/ntpd to include ’ -u ntp:ntp ‘:

OPTIONS="-u ntp:ntp"

This recommendation only applies if ntp is in use on the system.

Rationale

If ntp is in use on the system proper configuration is vital to ensuring time synchronization is working properly. Running ntpd under dedicated user accounts limits the attack surface for potential attacker exploiting security flaws in the daemon or the protocol.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}
' 'kernel' 2>/dev/null | grep -q installed && { dpkg-query --show --showformat='${db:Status-Status}\n' 'ntp' 2>/dev/null | grep -q installed; }; then

if grep -q 'OPTIONS=.*' /etc/sysconfig/ntpd; then
	# trying to solve cases where the parameter after OPTIONS
	#may or may not be enclosed in quotes
	sed -i -E 's/^([\s]*OPTIONS=["]?[^"]*)("?)/\1 -u ntp:ntp\2/' /etc/sysconfig/ntpd
else
	echo 'OPTIONS="-u ntp:ntp"' >> /etc/sysconfig/ntpd
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers