Uninstall CUPS Package

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

The cups package can be removed with the following command:


$ apt-get remove cups

Rationale

If the system does not need to print jobs or accept print jobs from other systems, it is recommended that CUPS be removed to reduce the potential attack surface.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# CAUTION: This remediation script will remove cups
#	   from the system, and may remove any packages
#	   that depend on cups. Execute this
#	   remediation AFTER testing on a non-production
#	   system!

DEBIAN_FRONTEND=noninteractive apt-get remove -y "cups"

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Ensure cups is removed
  package:
    name: cups
    state: absent
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - disable_strategy
  - low_complexity
  - low_disruption
  - no_reboot_needed
  - package_cups_removed
  - unknown_severity
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers