Uninstall DHCP Server Package

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

If the system does not need to act as a DHCP server, the dhcp package can be uninstalled. The isc-dhcp-server package can be removed with the following command:


$ apt-get remove isc-dhcp-server

Rationale

Removing the DHCP server ensures that it cannot be easily or accidentally reactivated and disrupt network operation.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# CAUTION: This remediation script will remove isc-dhcp-server
#	   from the system, and may remove any packages
#	   that depend on isc-dhcp-server. Execute this
#	   remediation AFTER testing on a non-production
#	   system!

DEBIAN_FRONTEND=noninteractive apt-get remove -y "isc-dhcp-server"

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Ensure isc-dhcp-server is removed
  package:
    name: isc-dhcp-server
    state: absent
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.4
  - disable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_dhcp_removed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers