Ensure that Root's Path Does Not Include Relative Paths or Null Directories

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

Ensure that none of the directories in root’s path is equal to a single . character, or that it contains any instances that lead to relative path traversal, such as .. or beginning a path without the slash (/) character. Also ensure that there are no “empty” elements in the path, such as in these examples:

PATH=:/bin
PATH=/bin:
PATH=/bin::/sbin

These empty elements have the same effect as a single . character.

Rationale

Including these entries increases the risk that root could execute code from an untrusted location.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers