Set Default firewalld Zone for Incoming Packets

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Description

To set the default zone to drop for the built-in default zone which processes incoming IPv4 and IPv6 packets, modify the following line in /etc/firewalld/firewalld.conf to be:

DefaultZone=drop

Rationale

In firewalld the default zone is applied only after all the applicable rules in the table are examined for a match. Setting the default zone to drop implements proper design for a firewall, i.e. any packets which are not explicitly permitted should not be accepted.

Warning

To prevent denying any access to the system, automatic remediation of this control is not available. Remediation must be automated as a component of machine provisioning, or followed manually as outlined above.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers