이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Use the status remapper processor to assign attributes as an official status to your events. For example, add an event severity level to your events with the status remapper.

Log severity after remapping

Each incoming status value is mapped as follows:

  • Integers from 0 to 7 map to the [Syslog severity standards][4]
  • Strings beginning with emerg or f (case-insensitive) map to emerg (0)
  • Strings beginning with a (case-insensitive) map to alert (1)
  • Strings beginning with c (case-insensitive) map to critical (2)
  • Strings beginning with e (case-insensitive)—that do not match emerg—map to error (3)
  • Strings beginning with w (case-insensitive) map to warning (4)
  • Strings beginning with n (case-insensitive) map to notice (5)
  • Strings beginning with i (case-insensitive) map to info (6)
  • Strings beginning with d, trace or verbose (case-insensitive) map to debug (7)
  • Strings beginning with o or s, or matching OK or Success (case-insensitive) map to OK
  • All others map to info (6)

Note: If multiple event status remapper processors are applied to a given event within a pipeline, only the first one in the pipeline’s order is considered. Additionally, for all pipelines that match the event, only the first status remapper encountered (from all applicable pipelines) is applied.

Example status remapper

Log severity remapping
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers