이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.
OpenTracing support is based on a deprecated specification. If you want to instrument your code with an open spec, use OpenTelemetry instead. Try processing data from OpenTelemetry instrumentation in Datadog Tracing Libraries.

OpenTracing support is included in the dd-trace package.

const tracer = require('dd-trace').init()
const opentracing = require('opentracing')

opentracing.initGlobalTracer(tracer)

Use the tracer like in any other OpenTracing application.

The following tags are available to override Datadog specific options:

  • service.name: The service name to be used for the span. The service name from the tracer will be used if this is not provided.
  • resource.name: The resource name to be used for the span. The operation name will be used if this is not provided.
  • span.type: The span type to be used for the span. Will fallback to custom if not provided.

See opentracing.io for OpenTracing Node.js usage.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers