Overview

If you experience issues with Cloud Security Vulnerabilities, use the following troubleshooting guidelines. If you need further assistance, contact Datadog support.

Error messages

Disk space requirements

Ensure your free disk space is equal to the size of your largest container image. This space is needed for the Datadog Agent to scan the container image for vulnerabilities (1 GB by default).

The resulting error appears as:

Error: failed to check current disk usage: not enough disk space to safely collect sbom, 192108482560 available, 1073741824000 required

Workaround:

  • Increase the available disk space to at least 1 GB. If your images are larger than 1 GB, increase your disk space accordingly.
  • If all of your images are smaller than 1 GB, you can decrease the default Agent request disk space with the environment variable: DD_SBOM_CONTAINER_IMAGE_MIN_AVAILABLE_DISK (default value 1GB).

Uncompressed container image layers

The SBOM scan only works with uncompressed container image layers. Certain Kubernetes distributions (such as AWS EKS, minikube, and kind), configure their container runtime to discard the uncompressed layers, causing the scan to fail.

The resulting error appears as:

ERROR | (pkg/workloadmeta/collectors/internal/containerd/image_sbom_trivy.go:80 in func2) | Failed to generate SBOM for containerd image: unable to marshal report to sbom format, err: analyze error: failed to analyze layer:  : unable to get uncompressed layer

The workaround for this issue is to set the configuration option:

  • For containerd: set discard_unpacked_layers=false in the containerd configuration file.
  • For Helm: set datadog.sbom.containerImage.uncompressedLayersSupport: true in your values.yaml file.
  • For Datadog Operator: set features.sbom.containerImage.uncompressedLayersSupport to true in your DatadogAgent CRD.

GKE image streaming

Datadog doesn’t support image streaming with Google Kubernetes Engine (GKE). If you have that option enabled in GKE, your Agent can’t generate container SBOMs.

The resulting error appears as:

unable to mount containerd image, err: unable to scan image named: {image-name}, image is not unpacked

The workaround for this issue is to disable image streaming in GKE. For more information, see the Disable Image streaming section of the GKE docs.

Disable Cloud Security Vulnerabilities

In the datadog-values.yaml file for the Agent, set the following configuration settings to false:

# datadog-values.yaml file
datadog:
  sbom:
    containerImage:
      enabled: false

      # Uncomment the following line if you are using Google Kubernetes Engine (GKE) or Amazon Elastic Kubernetes (EKS)
      # uncompressedLayersSupport: true

    # Enables Host Vulnerability Management
    host:
      enabled: false

    # Enables Container Vulnerability Management
    # Image collection is enabled by default with Datadog Helm version `>= 3.46.0`
      containerImageCollection:
        enabled: false

Further Reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers