Self-signed certificates should not be used for etcd TLS

kubernetes

Classification:

compliance

Framework:

cis-kubernetes

Control:

2.3

Set up the kubernetes integration.

Description

Do not use self-signed certificates for TLS.

Rationale

Etcd is a highly-available key value store used by Kubernetes deployments for persistent storage of all of its REST API objects. These objects are sensitive in nature and should not be available to unauthenticated clients. You should enable the client authentication via valid certificates to secure the access to the etcd service.

Audit

Run the following command on the etcd server node:

ps -ef | grep etcd

Verify that if the --auto-tls argument exists, it is not set to true.

Remediation

Edit the etcd pod specification file /etc/kubernetes/manifests/etcd.yaml on the master node and either remove the --auto-tls parameter or set it to false:

--auto-tls=false

Impact

Clients will not be able to use self-signed certificates for TLS.

Default value

By default, --auto-tls is set to false.

References

  1. https://coreos.com/etcd/docs/latest/op-guide/security.html
  2. https://kubernetes.io/docs/admin/etcd/
  3. https://coreos.com/etcd/docs/latest/op-guide/configuration.html#auto-tls

CIS controls

Version 6 14.2 Encrypt All Sensitive Information Over Less-trusted Networks All communication of sensitive information over less-trusted networks should be encrypted. Whenever information flows over a network with a lower trust level, the information should be encrypted. Version 7 14.4 Encrypt All Sensitive Information in Transit Encrypt all sensitive information in transit.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers