Container-Optimized OS (cos_containerd) should be used for GKE node images

Description

Container-Optimized OS images should be used in your cluster. These image types are hardened and increase the security of the GKE cluster(s) in your environment.

Remediation

Follow the steps from Google Cloud’s Specify a node image documentation to configure your cluster’s workloads and use Container-Optimized OS with containerd (cos_containerd) node image.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers