Ensure gpgcheck Enabled for All yum Package Repositories

Description

To ensure signature checking is not disabled for any repos, remove any lines from files in /etc/yum.repos.d of the form:

gpgcheck=0

Rationale

Verifying the authenticity of the software prior to installation validates the integrity of the patch or upgrade received from a vendor. This ensures the software has not been tampered with and that it has been provided by a trusted vendor. Self-signed certificates are disallowed by this requirement. Certificates used to verify the software must be from an approved Certificate Authority (CA)."

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

sed -i 's/gpgcheck\s*=.*/gpgcheck=1/g' /etc/yum.repos.d/*

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Grep for yum repo section names
  shell: |
    set -o pipefail
    grep -HEr '^\[.+\]' -r /etc/yum.repos.d/
  register: repo_grep_results
  failed_when: repo_grep_results.rc not in [0, 1]
  changed_when: false
  tags:
  - CCE-26876-3
  - CJIS-5.10.4.1
  - NIST-800-171-3.4.8
  - NIST-800-53-CM-11(a)
  - NIST-800-53-CM-11(b)
  - NIST-800-53-CM-5(3)
  - NIST-800-53-CM-6(a)
  - NIST-800-53-SA-12
  - NIST-800-53-SA-12(10)
  - NIST-800-53-SC-12
  - NIST-800-53-SC-12(3)
  - NIST-800-53-SI-7
  - PCI-DSS-Req-6.2
  - PCI-DSSv4-6.3.3
  - enable_strategy
  - ensure_gpgcheck_never_disabled
  - high_severity
  - low_complexity
  - medium_disruption
  - no_reboot_needed

- name: Set gpgcheck=1 for each yum repo
  ini_file:
    path: '{{ item[0] }}'
    section: '{{ item[1] }}'
    option: gpgcheck
    value: '1'
    no_extra_spaces: true
  loop: '{{ repo_grep_results.stdout |regex_findall( ''(.+\.repo):\[(.+)\]\n?'' )
    if repo_grep_results is not skipped else [] }}'
  when: repo_grep_results is not skipped
  tags:
  - CCE-26876-3
  - CJIS-5.10.4.1
  - NIST-800-171-3.4.8
  - NIST-800-53-CM-11(a)
  - NIST-800-53-CM-11(b)
  - NIST-800-53-CM-5(3)
  - NIST-800-53-CM-6(a)
  - NIST-800-53-SA-12
  - NIST-800-53-SA-12(10)
  - NIST-800-53-SC-12
  - NIST-800-53-SC-12(3)
  - NIST-800-53-SI-7
  - PCI-DSS-Req-6.2
  - PCI-DSSv4-6.3.3
  - enable_strategy
  - ensure_gpgcheck_never_disabled
  - high_severity
  - low_complexity
  - medium_disruption
  - no_reboot_needed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers