If your Lambda functions are deployed in VPC without access to the public internet, you can send data either using AWS PrivateLink for the datadoghq.com Datadog site, or using a proxy for all other sites.
Version 67+ of the Datadog Lambda Extension uses an optimized version of the extension. Read more.

Installation

A sample application is available on GitHub with instructions on how to deploy with multiple runtimes and infrastructure as code tools.

Datadog offers many different ways to enable instrumentation for your serverless applications. Choose a method below that best suits your needs. Datadog generally recommends using the Datadog CLI. You must follow the instructions for “Container Image” if your application is deployed as a container image.

The Datadog CLI modifies existing Lambda functions’ configurations to enable instrumentation without requiring a new deployment. It is the quickest way to get started with Datadog’s serverless monitoring.

  1. Install the Datadog CLI client

    npm install -g @datadog/datadog-ci
    
  2. If you are new to Datadog serverless monitoring, launch the Datadog CLI in interactive mode to guide your first installation for a quick start, and you can ignore the remaining steps. To permanently install Datadog for your production applications, skip this step and follow the remaining ones to run the Datadog CLI command in your CI/CD pipelines after your normal deployment.

    datadog-ci lambda instrument -i
    
  3. Configure the AWS credentials

    The Datadog CLI requires access to the AWS Lambda service and depends on the AWS JavaScript SDK to resolve the credentials. Ensure your AWS credentials are configured using the same method you would use when invoking the AWS CLI.

  4. Configure the Datadog site

    export DATADOG_SITE="<DATADOG_SITE>"
    

    Replace <DATADOG_SITE> with (ensure the correct SITE is selected on the right).

  5. Configure the Datadog API key

    Datadog recommends saving the Datadog API key in AWS Secrets Manager for security and easy rotation. The key needs to be stored as a plaintext string (not a JSON blob). Ensure your Lambda functions have the required secretsmanager:GetSecretValue IAM permission.

    export DATADOG_API_KEY_SECRET_ARN="<DATADOG_API_KEY_SECRET_ARN>"
    

    For quick testing purposes, you can also set the Datadog API key in plaintext:

    export DATADOG_API_KEY="<DATADOG_API_KEY>"
    
  6. Instrument your Lambda functions

    Note: Instrument your Lambda functions in a dev or staging environment first! Should the instrumentation result be unsatisfactory, run uninstrument with the same arguments to revert the changes.

    To instrument your Lambda functions, run the following command.

    datadog-ci lambda instrument -f <functionname> -f <another_functionname> -r <aws_region> -v 20 -e 77
    

    To fill in the placeholders:

    • Replace <functionname> and <another_functionname> with your Lambda function names. Alternatively, you can use --functions-regex to automatically instrument multiple functions whose names match the given regular expression.
    • Replace <aws_region> with the AWS region name.

    Additional parameters can be found in the CLI documentation.

The Datadog Serverless Plugin automatically configures your functions to send metrics, traces, and logs to Datadog through the Datadog Lambda Extension.

To install and configure the Datadog Serverless Plugin, follow these steps:

  1. Install the Datadog Serverless Plugin:

    serverless plugin install --name serverless-plugin-datadog
    
  2. Update your serverless.yml:

    custom:
      datadog:
        site: <DATADOG_SITE>
        apiKeySecretArn: <DATADOG_API_KEY_SECRET_ARN>
    

    To fill in the placeholders:

    • Replace <DATADOG_SITE> with (ensure the correct SITE is selected on the right).
    • Replace <DATADOG_API_KEY_SECRET_ARN> with the ARN of the AWS secret where your Datadog API key is securely stored. The key needs to be stored as a plaintext string (not a JSON blob). The secretsmanager:GetSecretValue permission is required. For quick testing, you can instead use apiKey and set the Datadog API key in plaintext.

    For more information and additional settings, see the plugin documentation.

The Datadog CloudFormation macro automatically transforms your SAM application template to install Datadog on your functions using Lambda layers, and configures your functions to send metrics, traces, and logs to Datadog through the Datadog Lambda Extension.

  1. Install the Datadog CloudFormation macro

    Run the following command with your AWS credentials to deploy a CloudFormation stack that installs the macro AWS resource. You only need to install the macro once for a given region in your account. Replace create-stack with update-stack to update the macro to the latest version.

    aws cloudformation create-stack \
      --stack-name datadog-serverless-macro \
      --template-url https://datadog-cloudformation-template.s3.amazonaws.com/aws/serverless-macro/latest.yml \
      --capabilities CAPABILITY_AUTO_EXPAND CAPABILITY_IAM
    

    The macro is now deployed and ready to use.

  2. Instrument your Lambda functions

    Add the DatadogServerless transform after the AWS::Serverless transform under the Transform section in your template.yml file for SAM.

    Transform:
      - AWS::Serverless-2016-10-31
      - Name: DatadogServerless
        Parameters:
          stackName: !Ref "AWS::StackName"
          dotnetLayerVersion: 20
          extensionLayerVersion: 77
          site: "<DATADOG_SITE>"
          apiKeySecretArn: "<DATADOG_API_KEY_SECRET_ARN>"
    

    To fill in the placeholders:

    • Replace <DATADOG_SITE> with (ensure the correct SITE is selected on the right).
    • Replace <DATADOG_API_KEY_SECRET_ARN> with the ARN of the AWS secret where your Datadog API key is securely stored. The key needs to be stored as a plaintext string (not a JSON blob). The secretsmanager:GetSecretValue permission is required. For quick testing, you can use apiKey instead and set the Datadog API key in plaintext.

    More information and additional parameters can be found in the macro documentation.

  1. Install the Datadog Lambda Extension

    COPY --from=public.ecr.aws/datadog/lambda-extension:<TAG> /opt/. /opt/
    

    Replace <TAG> with either a specific version number (for example, 77) or with latest. Alpine is also supported with specific version numbers (such as 77-alpine) or with latest-alpine. You can see a complete list of possible tags in the Amazon ECR repository.

  2. Install the Datadog .NET APM client

    RUN yum -y install tar wget gzip
    RUN wget https://github.com/DataDog/dd-trace-dotnet/releases/download/v<TRACER_VERSION>/datadog-dotnet-apm-<TRACER_VERSION>.tar.gz
    RUN mkdir /opt/datadog
    RUN tar -C /opt/datadog -xzf datadog-dotnet-apm-<TRACER_VERSION>.tar.gz
    ENV AWS_LAMBDA_EXEC_WRAPPER /opt/datadog_wrapper
    

    Replace <TRACER_VERSION> with the version number of dd-trace-dotnet you would like to use (for example, 2.3.0). The minimum supported version is 2.3.0. You can see the latest versions of dd-trace-dotnet in GitHub.

  3. Set the required environment variables

    • Set the environment variable DD_SITE to (ensure the correct SITE is selected on the right).
    • Set the environment variable DD_API_KEY_SECRET_ARN with the ARN of the AWS secret where your Datadog API key is securely stored. The key needs to be stored as a plaintext string (not a JSON blob). The secretsmanager:GetSecretValue permission is required. For quick testing, you can use DD_API_KEY instead and set the Datadog API key in plaintext.

The lambda-datadog Terraform module wraps the aws_lambda_function resource and automatically configures your Lambda function for Datadog Serverless Monitoring by:

  • Adding the Datadog Lambda layers
  • Redirecting the Lambda handler
  • Enabling the collection and sending of metrics, traces, and logs to Datadog
module "lambda-datadog" {
  source  = "DataDog/lambda-datadog/aws"
  version = "2.0.0"

  environment_variables = {
    "DD_API_KEY_SECRET_ARN" : "<DATADOG_API_KEY_SECRET_ARN>"
    "DD_ENV" : "<ENVIRONMENT>"
    "DD_SERVICE" : "<SERVICE_NAME>"
    "DD_SITE": "<DATADOG_SITE>"
    "DD_VERSION" : "<VERSION>"
  }

  datadog_extension_layer_version = 67
  datadog_dotnet_layer_version = 16

  # aws_lambda_function arguments
}
  1. Replace the aws_lambda_function resource with the lambda-datadog Terraform module then specify the source and version of the module.

  2. Set the aws_lambda_function arguments:

    All of the arguments available in the aws_lambda_function resource are available in this Terraform module. Arguments defined as blocks in the aws_lambda_function resource are redefined as variables with their nested arguments.

    For example, in aws_lambda_function, environment is defined as a block with a variables argument. In the lambda-datadog Terraform module, the value for the environment_variables is passed to the environment.variables argument in aws_lambda_function. See inputs for a complete list of variables in this module.

  3. Fill in the environment variable placeholders:

    • Replace <DATADOG_API_KEY_SECRET_ARN> with the ARN of the AWS secret where your Datadog API key is securely stored. The key needs to be stored as a plaintext string (not a JSON blob). The secretsmanager:GetSecretValue permission is required. For quick testing, you can instead use the environment variable DD_API_KEY and set your Datadog API key in plaintext.
    • Replace <ENVIRONMENT> with the Lambda function’s environment, such as prod or staging
    • Replace <SERVICE_NAME> with the name of the Lambda function’s service
    • Replace <DATADOG_SITE> with . (Ensure the correct Datadog site is selected on this page).
    • Replace <VERSION> with the version number of the Lambda function
  4. Select the versions of the Datadog Extension Lambda layer and Datadog .NET Lambda layer to use. Defaults to the latest layer versions.

  datadog_extension_layer_version = 67
  datadog_dotnet_layer_version = 16
  1. Install the Datadog Tracer

    Configure the layers for your Lambda function using the ARN in the following format:

    # Use this format for x86-based Lambda deployed in AWS commercial regions
    arn:aws:lambda:<AWS_REGION>:464622532012:layer:dd-trace-dotnet:20
    
    # Use this format for arm64-based Lambda deployed in AWS commercial regions
    arn:aws:lambda:<AWS_REGION>:464622532012:layer:dd-trace-dotnet-ARM:20
    
    # Use this format for x86-based Lambda deployed in AWS GovCloud regions
    arn:aws-us-gov:lambda:<AWS_REGION>:002406178527:layer:dd-trace-dotnet:20
    
    # Use this format for arm64-based Lambda deployed in AWS GovCloud regions
    arn:aws-us-gov:lambda:<AWS_REGION>:002406178527:layer:dd-trace-dotnet-ARM:20
    

    Replace <AWS_REGION> with a valid AWS region, such as us-east-1.

  2. Install the Datadog Lambda Extension

    Configure the layers for your Lambda function using the ARN in the following format:

    # Use this format for x86-based Lambda deployed in AWS commercial regions
    arn:aws:lambda:<AWS_REGION>:464622532012:layer:Datadog-Extension:77
    
    # Use this format for arm64-based Lambda deployed in AWS commercial regions
    arn:aws:lambda:<AWS_REGION>:464622532012:layer:Datadog-Extension-ARM:77
    
    # Use this format for x86-based Lambda deployed in AWS GovCloud regions
    arn:aws-us-gov:lambda:<AWS_REGION>:002406178527:layer:Datadog-Extension:77
    
    # Use this format for arm64-based Lambda deployed in AWS GovCloud regions
    arn:aws-us-gov:lambda:<AWS_REGION>:002406178527:layer:Datadog-Extension-ARM:77
    

    Replace <AWS_REGION> with a valid AWS region, such as us-east-1.

  3. Set the required environment variables

    • Set AWS_LAMBDA_EXEC_WRAPPER to /opt/datadog_wrapper.
    • Set DD_SITE to (ensure the correct SITE is selected on the right).
    • Set DD_API_KEY_SECRET_ARN to the ARN of the AWS secret where your Datadog API key is securely stored. The key needs to be stored as a plaintext string (not a JSON blob). The secretsmanager:GetSecretValue permission is required. For quick testing, you can use DD_API_KEY instead and set the Datadog API key in plaintext.

Minimize cold start duration

Version 67+ of the Datadog Extension is optimized to significantly reduce cold start duration.

To use the optimized extension, disable App and API Protection (AAP), Continuous Profiler for Lambda, and OpenTelemetry based tracing. Set the following environment variables to false:

  • DD_TRACE_OTEL_ENABLED
  • DD_PROFILING_ENABLED
  • DD_SERVERLESS_APPSEC_ENABLED

Enabling any of these features cause the extension to default back to the fully compatible older version of the extension. You can also force your extension to use the older version by setting DD_EXTENSION_VERSION to compatibility. Datadog encourages you to report any feedback or bugs by adding an issue on GitHub and tagging your issue with version/next.

Adding Custom Spans

When using the Datadog Lambda tracing layer for .NET, ensure that a second version of the .NET tracer is not also packaged with your application code. Add ExcludeAssets instruction to ensure this extra tracer is excluded.

<PackageReference Include="Datadog.Trace" Version="2.38.0">
    <ExcludeAssets>runtime</ExcludeAssets>
</PackageReference>

You are now ready to add custom spans and span tags using the .NET tracer. For further instructions on how to add spans, see the .NET custom instrumentation page.

What’s next?

  • You can now view metrics, logs, and traces on the Serverless Homepage.
  • Turn on threat monitoring to get alerted on attackers targeting your service.
  • Submit a custom metric or APM span to monitor your business logic.
  • See the troubleshooting guide if you have trouble collecting the telemetry
  • See the advanced configurations to
    • connect your telemetry using tags
    • collect telemetry for Amazon API Gateway, SQS, and so on.
    • capture the Lambda request and response payloads
    • link errors of your Lambda functions to your source code
    • filter or scrub sensitive information from logs or traces

Further Reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers