APM Connection Errors

If the application with the tracing library cannot reach the Datadog Agent, look for connection errors in the tracer startup logs or tracer debug logs, which can be found with your application logs.

Errors that indicate an APM Connection problem

If you see these messages, it means your traces are not being submitted to the Datadog Agent.

Tracing library errors

Java diagnostic CLI

Starting with 0.82.0+ of the Java tracer, you can use a diagnostic command where the Java tracer is installed to detect potential connection issues. From where dd-java-agent.jar is installed (inside the application container), run:

java -jar /path/to/dd-java-agent.jar sampleTrace -c 1

Example output:

[dd.trace 2021-08-24 18:38:01:501 +0000] [dd-task-scheduler] INFO datadog.trace.agent.core.StatusLogger - DATADOG TRACER CONFIGURATION {"version":"0.83.2~6bb3e09b2a","os_name":"Linux","os_version":"5.10.25-linuxkit","architecture":"amd64","lang":"jvm","lang_version":"1.8.0_232","jvm_vendor":"Oracle Corporation","jvm_version":"25.232-b09","java_class_version":"52.0","http_nonProxyHosts":"null","http_proxyHost":"null","enabled":true,"service":"dd-java-agent","agent_url":"http://localhost:8126","agent_error":true,"debug":false,"analytics_enabled":false,"sampling_rules":[{},{}],"priority_sampling_enabled":true,"logs_correlation_enabled":true,"profiling_enabled":false,"dd_version":"0.83.2~6bb3e09b2a","health_checks_enabled":true,"configuration_file":"no config file present","runtime_id":"<ID>","logging_settings":{"levelInBrackets":false,"dateTimeFormat":"'[dd.trace 'yyyy-MM-dd HH:mm:ss:SSS Z']'","logFile":"System.err","configurationFile":"simplelogger.properties","showShortLogName":false,"showDateTime":true,"showLogName":true,"showThreadName":true,"defaultLogLevel":"INFO","warnLevelString":"WARN","embedException":false}}
[dd.trace 2021-08-24 18:38:02:164 +0000] [dd-trace-processor] WARN datadog.trace.agent.common.writer.ddagent.DDAgentApi - Error while sending 1 (size=316B) traces to the DD agent. Total: 1, Received: 1, Sent: 0, Failed: 1. java.net.ConnectException: Failed to connect to localhost/127.0.0.1:8126 (Will not log errors for 5 minutes)

Tracer startup logs

[dd.trace 2021-08-17 17:59:29:234 +0000] [dd-trace-processor] WARN datadog.trace.agent.common.writer.ddagent.DDAgentApi - Error while sending 9 (size=5KB) traces to the DD agent. Total: 9, Received: 9, Sent: 0, Failed: 9. java.net.ConnectException: Failed to connect to localhost/127.0.0.1:8126 (Will not log errors for 5 minutes)

Tracer debug logs

[dd.trace 2021-08-17 18:04:50:282 +0000] [dd-trace-processor] DEBUG datadog.communication.ddagent.DDAgentFeaturesDiscovery - Error querying info at http://localhost:8126/
java.net.ConnectException: Failed to connect to localhost/127.0.0.1:8126
	at okhttp3.internal.connection.RealConnection.connectSocket(RealConnection.java:249)

Tracer startup logs

2021-08-17 19:10:06,169 WARNING [ddtrace.tracer] [tracer.py:655] [dd.service= dd.env= dd.version= dd.trace_id=0 dd.span_id=0] - - DATADOG TRACER DIAGNOSTIC - Agent not reachable at http://localhost:8126. Exception raised: [Errno 99] Cannot assign requested address

Tracer debug logs

2021-08-17 14:04:12,982 ERROR [ddtrace.internal.writer] [writer.py:466] [dd.service= dd.env= dd.version= dd.trace_id=0 dd.span_id=0] - failed to send traces to Datadog Agent at http://localhost:8126
Traceback (most recent call last):

Tracer startup logs

W, [2021-08-17T18:37:51.542245 #24]  WARN -- ddtrace: [ddtrace] DATADOG TRACER DIAGNOSTIC - Agent Error: Datadog::Transport::InternalErrorResponse ok?: unsupported?:, not_found?:, client_error?:, server_error?:, internal_error?:true, payload:, error_type:Errno::ECONNREFUSED error:Failed to open TCP connection to 127.0.0.1:8126 (Connection refused - connect(2) for "127.0.0.1" port 8126)

Tracer debug logs

D, [2021-08-17T18:51:28.962389 #24] DEBUG -- ddtrace: [ddtrace] (/usr/local/bundle/gems/ddtrace-0.48.0/lib/ddtrace/transport/http/client.rb:33:in `rescue in send_request') Internal error during HTTP transport request. Cause: Failed to open TCP connection to 127.0.0.1:8126 (Connection refused - connect(2) for "127.0.0.1" port 8126) Location: /usr/local/lib/ruby/2.5.0/net/http.rb:939:in `rescue in block in connect'

Tracer startup logs

2021/08/17 17:46:22 Datadog Tracer v1.32.0 WARN: DIAGNOSTICS Unable to reach agent intake: Post http://localhost:8126/v0.4/traces: dial tcp 127.0.0.1:8126: connect: connection refused

Tracer debug logs

2021/08/17 17:47:42 Datadog Tracer v1.32.0 ERROR: lost 1 traces: Post http://localhost:8126/v0.4/traces: dial tcp 127.0.0.1:8126: connect: connection refused (occurred: 17 Aug 21 17:46 UTC)

Tracer startup logs

DATADOG TRACER DIAGNOSTIC - Agent Error: Network error trying to reach the agent: connect ECONNREFUSED 127.0.0.1:8126
Error: Network error trying to reach the agent: connect ECONNREFUSED 127.0.0.1:8126

Tracer debug logs

Error: Network error trying to reach the agent: connect ECONNREFUSED 127.0.0.1:8126
    at ClientRequest.<anonymous> (/home/node-web-app/node_modules/dd-trace/packages/dd-trace/src/platform/node/request.js:51:33)

Managed logs

Even if debug mode isn’t enabled, the managed logs contain errors from connection refused issues:

{ MachineName: ".", Process: "[114 sample-web-app]", AppDomain: "[1 sample-web-app]", TracerVersion: "1.28.2.0" }
2021-08-17 18:19:46.827 +00:00 [ERR] An error occurred while sending 1 traces to the agent at http://127.0.0.1:8126/v0.4/traces
System.Net.Http.HttpRequestException: Connection refused
 ---> System.Net.Sockets.SocketException (111): Connection refused
   at System.Net.Http.ConnectHelper.ConnectAsync(String host, Int32 port, CancellationToken cancellationToken)
   --- End of inner exception stack trace ---

Tracer startup logs

Failed to connect to localhost port 8126: Connection refused

Application logs

When the application cannot reach the Datadog Agent, these log messages are emitted to where your application sends logs:

Error sending traces to agent: Couldn't connect to server
Failed to connect to localhost port 8126: Connection refused

Datadog Agent errors

If the agent status command (available in Agent 6.20.0/7.20.0) shows that APM is not running or is not reachable on localhost:8126, your Datadog Agent does not have APM configured and traces cannot be submitted to the Datadog backend.

APM Agent
=========
  Status: Not running or unreachable on localhost:8126.

Troubleshooting the connection problem

Whether it’s the tracing library or the Datadog Agent displaying the error, there are a few ways to troubleshoot.

Host-based setups

If your application and the Datadog Agent are not containerized, the application with the tracing library should be trying to send traces to localhost:8126 or 127.0.0.1:8126, because that is where the Datadog Agent is listening.

If the Datadog Agent shows that APM is not listening, check for port conflicts with port 8126, which is what the APM component of the Datadog Agent uses by default.

If you cannot isolate the root cause, contact Datadog Support with:

  • Information about the environment in which you’re deploying the application and Datadog Agent.
  • If you are using proxies, information about how they’ve been configured.
  • If you are trying to change the default port from 8126 to another port, information about that port.
  • A Datadog Agent flare.

Containerized setups

Check network configuration

In containerized setups, submitting traces to localhost or 127.0.0.1 is often incorrect since the Datadog Agent is also containerized and located elsewhere. Note: Amazon ECS on Fargate and AWS EKS on Fargate are exceptions to this rule.

Determine if the networking between the application and the Datadog Agent matches what is needed for that configuration.

In particular, check to make sure that the Datadog Agent has access to port 8126 (or to the port you have defined) and that your application is able to direct traces to the Datadog Agent’s location. To do so, you can run the following command from the application container, replacing the {agent_ip} and {agent_port} variables:

curl -X GET http://{agent_ip}:{agent_port}/info

If this command fails, your container cannot access the Agent. Refer to the following sections to get hints on what could be causing this issue.

A great place to get started is the APM in-app setup documentation.

Review where your tracing library is trying to send traces

Using the error logs listed above for each language, check to see where your traces are being directed.

See the table below for example setups. Some require setting up additional network configurations explained further in their docs.

SetupDD_AGENT_HOST
Amazon ECS on EC2Evaluate to Amazon’s EC2 metadata endpoint
Amazon ECS on FargateDo not set DD_AGENT_HOST
AWS EKS on FargateDo not set DD_AGENT_HOST
AWS Elastic Beanstalk - Single ContainerGateway IP (usually 172.17.0.1)
AWS Elastic Beanstalk - Multiple ContainersLink pointing to the Datadog Agent container name
Kubernetes1) Unix Domain Socket, 2) status.hostIP added manually, or 3) through the Admission Controller. If using TCP, check the network policies applied on your container
AWS EKS (non Fargate)1) Unix Domain Socket, 2) status.hostIP added manually, or 3) through the Admission Controller
Datadog Agent and Application Docker ContainersDatadog Agent container

Note about web servers: If the agent_url section in the tracer startup logs has a mismatch against the DD_AGENT_HOST environment variable that was passed in, review how environment variables are cascaded for that specific server. For example, in PHP, there’s an additional setting to ensure that Apache or Nginx pick up the DD_AGENT_HOST environment variable correctly.

If your tracing library is sending traces correctly based on your setup, then proceed to the next step.

Review your Datadog Agent status and configuration

If your setup is not on Fargate, you can exec into the Datadog Agent container and run the Agent status command: agent status

Note: If you use Kubernetes with dedicated containers, exec into the dedicated Trace Agent Container.

Look for the APM Agent section to confirm whether it is running:

=========
APM Agent
=========
  Status: Running
  Pid: <pid number>
  Uptime: <integer> seconds
  Mem alloc: <integer> bytes
  Hostname: <name of datadog agent container>
  Receiver: 0.0.0.0:8126
  Endpoints:
    https://trace.agent.datadoghq.com

  Receiver (previous minute)
  ==========================
    No traces received in the previous minute.
    Default priority sampling rate: 100.0%

If the configuration is correct, but you’re still seeing connection errors, contact Datadog Support with:

  • Information about the environment in which you’re deploying the application and Datadog Agent.
  • If you’re using proxies, information about how they’ve been configured.
  • Any configuration files used to set up the application and the Datadog Agent.
  • Startup logs or tracer debug logs outlining the connection error.
  • A Datadog Agent flare. For dedicated containers, send the flare from the dedicated Trace Agent container.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers