Snapshots

Take graph snapshots using the API.

GET https://api.ap1.datadoghq.com/api/v1/graph/snapshothttps://api.datadoghq.eu/api/v1/graph/snapshothttps://api.ddog-gov.com/api/v1/graph/snapshothttps://api.datadoghq.com/api/v1/graph/snapshothttps://api.us3.datadoghq.com/api/v1/graph/snapshothttps://api.us5.datadoghq.com/api/v1/graph/snapshot

Overview

Take graph snapshots. Note: When a snapshot is created, there is some delay before it is available.

Arguments

Query Strings

Name

Type

Description

metric_query

string

The metric query.

start [required]

integer

The POSIX timestamp of the start of the query in seconds.

end [required]

integer

The POSIX timestamp of the end of the query in seconds.

event_query

string

A query that adds event bands to the graph.

graph_def

string

A JSON document defining the graph. graph_def can be used instead of metric_query. The JSON document uses the grammar defined here and should be formatted to a single line then URL encoded.

title

string

A title for the graph. If no title is specified, the graph does not have a title.

height

integer

The height of the graph. If no height is specified, the graph’s original height is used.

width

integer

The width of the graph. If no width is specified, the graph’s original width is used.

Response

OK

Object representing a graph snapshot.

Expand All

Field

Type

Description

graph_def

string

A JSON document defining the graph. graph_def can be used instead of metric_query. The JSON document uses the grammar defined here and should be formatted to a single line then URL encoded.

metric_query

string

The metric query. One of metric_query or graph_def is required.

snapshot_url

string

URL of your graph snapshot.

{
  "graph_def": "string",
  "metric_query": "string",
  "snapshot_url": "https://app.datadoghq.com/s/f12345678/aaa-bbb-ccc"
}

Bad Request

Error response object.

Expand All

Field

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Field

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Field

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Code Example

                  # Required query arguments
export metric_query="CHANGE_ME"
export start="CHANGE_ME"
export end="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/graph/snapshot?metric_query=${metric_query}&start=${start}&end=${end}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Take graph snapshots returns "OK" response
"""

from datetime import datetime
from dateutil.relativedelta import relativedelta
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.snapshots_api import SnapshotsApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = SnapshotsApi(api_client)
    response = api_instance.get_graph_snapshot(
        metric_query="avg:system.load.1{*}",
        start=int((datetime.now() + relativedelta(days=-1)).timestamp()),
        end=int(datetime.now().timestamp()),
        title="System load",
        height=400,
        width=600,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Take graph snapshots returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::SnapshotsAPI.new
opts = {
  metric_query: "avg:system.load.1{*}",
  title: "System load",
  height: 400,
  width: 600,
}
p api_instance.get_graph_snapshot((Time.now + -1 * 86400).to_i, Time.now.to_i, opts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
require 'rubygems'
require 'dogapi'

api_key = '<DATADOG_API_KEY>'
app_key = '<DATADOG_APPLICATION_KEY>'

dog = Dogapi::Client.new(api_key, app_key)

end_ts = Time.now().to_i
start_ts = end_ts - (60 * 60)
dog.graph_snapshot("system.load.1{*}", start_ts, end_ts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Take graph snapshots returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"
	"time"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewSnapshotsApi(apiClient)
	resp, r, err := api.GetGraphSnapshot(ctx, time.Now().AddDate(0, 0, -1).Unix(), time.Now().Unix(), *datadogV1.NewGetGraphSnapshotOptionalParameters().WithMetricQuery("avg:system.load.1{*}").WithTitle("System load").WithHeight(400).WithWidth(600))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `SnapshotsApi.GetGraphSnapshot`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `SnapshotsApi.GetGraphSnapshot`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Take graph snapshots returns "OK" response
import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.SnapshotsApi;
import com.datadog.api.client.v1.api.SnapshotsApi.GetGraphSnapshotOptionalParameters;
import com.datadog.api.client.v1.model.GraphSnapshot;
import java.time.OffsetDateTime;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    SnapshotsApi apiInstance = new SnapshotsApi(defaultClient);

    try {
      GraphSnapshot result =
          apiInstance.getGraphSnapshot(
              OffsetDateTime.now().plusDays(-1).toInstant().getEpochSecond(),
              OffsetDateTime.now().toInstant().getEpochSecond(),
              new GetGraphSnapshotOptionalParameters()
                  .metricQuery("avg:system.load.1{*}")
                  .title("System load")
                  .height(400L)
                  .width(600L));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling SnapshotsApi#getGraphSnapshot");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api
import time

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

initialize(**options)

# Take a graph snapshot
end = int(time.time())
start = end - (60 * 60)
api.Graph.create(
    graph_def='{\
    "viz": "timeseries", \
    "requests": [ \
      {"q": "avg:system.load.1{*}", "conditional_formats": [], "type": "line"},\
      {"q": "avg:system.load.5{*}", "type": "line"}, \
      {"q": "avg:system.load.15{*}", "type": "line"}\
      ], \
    "events": [\
      {"q": "hosts:* ", "tags_execution": "and"}\
      ]}',
    start=start,
    end=end
)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
// Take graph snapshots returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_snapshots::GetGraphSnapshotOptionalParams;
use datadog_api_client::datadogV1::api_snapshots::SnapshotsAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = SnapshotsAPI::with_config(configuration);
    let resp = api
        .get_graph_snapshot(
            1636542671,
            1636629071,
            GetGraphSnapshotOptionalParams::default()
                .metric_query("avg:system.load.1{*}".to_string())
                .title("System load".to_string())
                .height(400)
                .width(600),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Take graph snapshots returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.SnapshotsApi(configuration);

const params: v1.SnapshotsApiGetGraphSnapshotRequest = {
  metricQuery: "avg:system.load.1{*}",
  start: Math.round(
    new Date(new Date().getTime() + -1 * 86400 * 1000).getTime() / 1000
  ),
  end: Math.round(new Date().getTime() / 1000),
  title: "System load",
  height: 400,
  width: 600,
};

apiInstance
  .getGraphSnapshot(params)
  .then((data: v1.GraphSnapshot) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers