Host Map Widget

The host map widget graphs any metric across your hosts using the same visualization available from the main Host Map page:

Host Map

Setup

Host Map Setup

Configuration

Configuration of the host map widget is similar to the main host map page:

  1. Type: Choose to display hosts or containers.
  2. Filter by: Choose the hosts or containers to display.
  3. Group by: Aggregate your hosts or containers by one or several tags.
  4. Fill by: Choose a metric to fill your host or container map elements.
  5. Size by (optional): Choose a metric to size your host or container map elements.
  6. Palette (optional): Choose a color palette.
  7. Values (optional): Define the min and max color palette fill values.

Note: Free text search is not available for the host map widget.

Options

Context links are enabled by default; you can toggle them on or off. Context links connect dashboard widgets with other pages (in Datadog or third-party).

API

This widget can be used with the Dashboards API. See the following table for the widget JSON schema definition:

Expand All

Field

Type

Description

custom_links

[object]

List of custom links.

is_hidden

boolean

The flag for toggling context menu link visibility.

label

string

The label for the custom link URL. Keep the label short and descriptive. Use metrics and tags as variables.

link

string

The URL of the custom link. URL must include http or https. A relative URL must start with /.

override_label

string

The label ID that refers to a context menu link. Can be logs, hosts, traces, profiles, processes, containers, or rum.

group

[string]

List of tag prefixes to group by.

no_group_hosts

boolean

Whether to show the hosts that don’t fit in a group.

no_metric_hosts

boolean

Whether to show the hosts with no metrics.

node_type

enum

Which type of node to use in the map. Allowed enum values: host,container

notes

string

Notes on the title.

requests [required]

object

List of definitions.

fill

object

Updated host map.

apm_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

event_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

log_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

network_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

process_query

object

The process query to use in the widget.

filter_by

[string]

List of processes.

limit

int64

Max number of items in the filter list.

metric [required]

string

Your chosen metric.

search_by

string

Your chosen search term.

profile_metrics_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

q

string

Query definition.

rum_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

security_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

size

object

Updated host map.

apm_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

event_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

log_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

network_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

process_query

object

The process query to use in the widget.

filter_by

[string]

List of processes.

limit

int64

Max number of items in the filter list.

metric [required]

string

Your chosen metric.

search_by

string

Your chosen search term.

profile_metrics_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

q

string

Query definition.

rum_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

security_query

object

The log query.

compute

object

Define computation for a log query.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

group_by

[object]

List of tag prefixes to group by in the case of a cluster check.

facet [required]

string

Facet name.

limit

int64

Maximum number of items in the group.

sort

object

Define a sorting method.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

order [required]

enum

Widget sorting methods. Allowed enum values: asc,desc

index

string

A coma separated-list of index names. Use "*" query all indexes at once. Multiple Indexes

multi_compute

[object]

This field is mutually exclusive with compute.

aggregation [required]

string

The aggregation method.

facet

string

Facet name.

interval

int64

Define a time interval in seconds.

search

object

The query being made on the logs.

query [required]

string

Search value to apply.

scope

[string]

List of tags used to filter the map.

style

object

The style to apply to the widget.

fill_max

string

Max value to use to color the map.

fill_min

string

Min value to use to color the map.

palette

string

Color palette to apply to the widget.

palette_flip

boolean

Whether to flip the palette tones.

title

string

Title of the widget.

title_align

enum

How to align the text on the widget. Allowed enum values: center,left,right

title_size

string

Size of the title.

type [required]

enum

Type of the host map widget. Allowed enum values: hostmap

default: hostmap

{
  "custom_links": [
    {
      "is_hidden": false,
      "label": "Search logs for {{host}}",
      "link": "https://app.datadoghq.com/logs?query={{host}}",
      "override_label": "logs"
    }
  ],
  "group": [],
  "no_group_hosts": false,
  "no_metric_hosts": false,
  "node_type": "string",
  "notes": "string",
  "requests": {
    "fill": {
      "apm_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "event_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "log_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "network_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "process_query": {
        "filter_by": [],
        "limit": "integer",
        "metric": "system.load.1",
        "search_by": "string"
      },
      "profile_metrics_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "q": "string",
      "rum_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "security_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      }
    },
    "size": {
      "apm_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "event_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "log_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "network_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "process_query": {
        "filter_by": [],
        "limit": "integer",
        "metric": "system.load.1",
        "search_by": "string"
      },
      "profile_metrics_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "q": "string",
      "rum_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      },
      "security_query": {
        "compute": {
          "aggregation": "avg",
          "facet": "@duration",
          "interval": 5000
        },
        "group_by": [
          {
            "facet": "resource_name",
            "limit": 50,
            "sort": {
              "aggregation": "avg",
              "facet": "@string_query.interval",
              "order": "desc"
            }
          }
        ],
        "index": "days-3,days-7",
        "multi_compute": [
          {
            "aggregation": "avg",
            "facet": "@duration",
            "interval": 5000
          }
        ],
        "search": {
          "query": ""
        }
      }
    }
  },
  "scope": [],
  "style": {
    "fill_max": "string",
    "fill_min": "string",
    "palette": "string",
    "palette_flip": false
  },
  "title": "string",
  "title_align": "string",
  "title_size": "string",
  "type": "hostmap"
}

Further Reading

Additional helpful documentation, links, and articles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers