AuthN Mappings

The AuthN Mappings API is used to automatically map groups of users to roles in Datadog using attributes sent from Identity Providers. Use these endpoints to manage your AuthN Mappings.

GET https://api.ap1.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.datadoghq.eu/api/v2/authn_mappings/{authn_mapping_id}https://api.ddog-gov.com/api/v2/authn_mappings/{authn_mapping_id}https://api.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.us3.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.us5.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}

Información general

Get an AuthN Mapping specified by the AuthN Mapping UUID.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

authn_mapping_id [required]

string

The UUID of the AuthN Mapping.

Respuesta

OK

AuthN Mapping response from the API.

Expand All

Campo

Tipo

Descripción

data

object

The AuthN Mapping object returned by API.

attributes

object

Attributes of AuthN Mapping.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

created_at

date-time

Creation time of the AuthN Mapping.

modified_at

date-time

Time of last AuthN Mapping modification.

saml_assertion_attribute_id

string

The ID of the SAML assertion attribute.

id [required]

string

ID of the AuthN Mapping.

relationships

object

All relationships associated with AuthN Mapping.

role

object

Relationship to role.

data

object

Relationship to role object.

id

string

The unique identifier of the role.

type

enum

Roles type. Allowed enum values: roles

default: roles

saml_assertion_attribute

object

AuthN Mapping relationship to SAML Assertion Attribute.

data [required]

object

Data of AuthN Mapping relationship to SAML Assertion Attribute.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

team

object

Relationship to team.

data

object

Relationship to Team object.

id

string

The unique identifier of the team.

type

enum

Team type Allowed enum values: team

default: team

type [required]

enum

AuthN Mappings resource type. Allowed enum values: authn_mappings

default: authn_mappings

included

[ <oneOf>]

Included data in the AuthN Mapping response.

Option 1

object

SAML assertion attribute.

attributes

object

Key/Value pair of attributes used in SAML assertion attributes.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

Option 2

object

Role object returned by the API.

attributes

object

Attributes of the role.

created_at

date-time

Creation time of the role.

modified_at

date-time

Time of last role modification.

name

string

The name of the role. The name is neither unique nor a stable identifier of the role.

user_count

int64

Number of users with that role.

id

string

The unique identifier of the role.

relationships

object

Relationships of the role object returned by the API.

permissions

object

Relationship to multiple permissions objects.

data

[object]

Relationships to permission objects.

id

string

ID of the permission.

type

enum

Permissions resource type. Allowed enum values: permissions

default: permissions

type [required]

enum

Roles type. Allowed enum values: roles

default: roles

Option 3

object

Team.

attributes

object

Team attributes.

avatar

string

Unicode representation of the avatar for the team, limited to a single grapheme

banner

int64

Banner selection for the team

handle

string

The team's identifier

link_count

int32

The number of links belonging to the team

name

string

The name of the team

summary

string

A brief summary of the team, derived from the description

user_count

int32

The number of users belonging to the team

id

string

The ID of the Team.

type

enum

Team type Allowed enum values: team

default: team

{
  "data": {
    "attributes": {
      "attribute_key": "member-of",
      "attribute_value": "Development",
      "created_at": "2019-09-19T10:00:00.000Z",
      "modified_at": "2019-09-19T10:00:00.000Z",
      "saml_assertion_attribute_id": "0"
    },
    "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
    "relationships": {
      "role": {
        "data": {
          "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
          "type": "roles"
        }
      },
      "saml_assertion_attribute": {
        "data": {
          "id": "0",
          "type": "saml_assertion_attributes"
        }
      },
      "team": {
        "data": {
          "id": "f9bb8444-af7f-11ec-ac2c-da7ad0900001",
          "type": "team"
        }
      }
    },
    "type": "authn_mappings"
  },
  "included": [
    {
      "attributes": {
        "attribute_key": "member-of",
        "attribute_value": "Development"
      },
      "id": "0",
      "type": "saml_assertion_attributes"
    }
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export authn_mapping_id="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/authn_mappings/${authn_mapping_id}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get an AuthN Mapping by UUID returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.authn_mappings_api import AuthNMappingsApi

# there is a valid "authn_mapping" in the system
AUTHN_MAPPING_DATA_ID = environ["AUTHN_MAPPING_DATA_ID"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = AuthNMappingsApi(api_client)
    response = api_instance.get_authn_mapping(
        authn_mapping_id=AUTHN_MAPPING_DATA_ID,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get an AuthN Mapping by UUID returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::AuthNMappingsAPI.new

# there is a valid "authn_mapping" in the system
AUTHN_MAPPING_DATA_ID = ENV["AUTHN_MAPPING_DATA_ID"]
p api_instance.get_authn_mapping(AUTHN_MAPPING_DATA_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get an AuthN Mapping by UUID returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "authn_mapping" in the system
	AuthnMappingDataID := os.Getenv("AUTHN_MAPPING_DATA_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAuthNMappingsApi(apiClient)
	resp, r, err := api.GetAuthNMapping(ctx, AuthnMappingDataID)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `AuthNMappingsApi.GetAuthNMapping`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `AuthNMappingsApi.GetAuthNMapping`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get an AuthN Mapping by UUID returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.AuthNMappingsApi;
import com.datadog.api.client.v2.model.AuthNMappingResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    AuthNMappingsApi apiInstance = new AuthNMappingsApi(defaultClient);

    // there is a valid "authn_mapping" in the system
    String AUTHN_MAPPING_DATA_ID = System.getenv("AUTHN_MAPPING_DATA_ID");

    try {
      AuthNMappingResponse result = apiInstance.getAuthNMapping(AUTHN_MAPPING_DATA_ID);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling AuthNMappingsApi#getAuthNMapping");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get an AuthN Mapping by UUID returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_authn_mappings::AuthNMappingsAPI;

#[tokio::main]
async fn main() {
    // there is a valid "authn_mapping" in the system
    let authn_mapping_data_id = std::env::var("AUTHN_MAPPING_DATA_ID").unwrap();
    let configuration = datadog::Configuration::new();
    let api = AuthNMappingsAPI::with_config(configuration);
    let resp = api.get_authn_mapping(authn_mapping_data_id.clone()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get an AuthN Mapping by UUID returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.AuthNMappingsApi(configuration);

// there is a valid "authn_mapping" in the system
const AUTHN_MAPPING_DATA_ID = process.env.AUTHN_MAPPING_DATA_ID as string;

const params: v2.AuthNMappingsApiGetAuthNMappingRequest = {
  authnMappingId: AUTHN_MAPPING_DATA_ID,
};

apiInstance
  .getAuthNMapping(params)
  .then((data: v2.AuthNMappingResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PATCH https://api.ap1.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.datadoghq.eu/api/v2/authn_mappings/{authn_mapping_id}https://api.ddog-gov.com/api/v2/authn_mappings/{authn_mapping_id}https://api.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.us3.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.us5.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}

Información general

Edit an AuthN Mapping. This endpoint requires the user_access_manage permission.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

authn_mapping_id [required]

string

The UUID of the AuthN Mapping.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

data [required]

object

Data for updating an AuthN Mapping.

attributes

object

Key/Value pair of attributes used for update request.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

id [required]

string

ID of the AuthN Mapping.

relationships

 <oneOf>

Relationship of AuthN Mapping update object to a Role or Team.

Option 1

object

Relationship of AuthN Mapping to a Role.

role [required]

object

Relationship to role.

data

object

Relationship to role object.

id

string

The unique identifier of the role.

type

enum

Roles type. Allowed enum values: roles

default: roles

Option 2

object

Relationship of AuthN Mapping to a Team.

team [required]

object

Relationship to team.

data

object

Relationship to Team object.

id

string

The unique identifier of the team.

type

enum

Team type Allowed enum values: team

default: team

type [required]

enum

AuthN Mappings resource type. Allowed enum values: authn_mappings

default: authn_mappings

{
  "data": {
    "attributes": {
      "attribute_key": "member-of",
      "attribute_value": "Development"
    },
    "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
    "relationships": {
      "role": {
        "data": {
          "id": "string",
          "type": "roles"
        }
      }
    },
    "type": "authn_mappings"
  }
}

Respuesta

OK

AuthN Mapping response from the API.

Expand All

Campo

Tipo

Descripción

data

object

The AuthN Mapping object returned by API.

attributes

object

Attributes of AuthN Mapping.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

created_at

date-time

Creation time of the AuthN Mapping.

modified_at

date-time

Time of last AuthN Mapping modification.

saml_assertion_attribute_id

string

The ID of the SAML assertion attribute.

id [required]

string

ID of the AuthN Mapping.

relationships

object

All relationships associated with AuthN Mapping.

role

object

Relationship to role.

data

object

Relationship to role object.

id

string

The unique identifier of the role.

type

enum

Roles type. Allowed enum values: roles

default: roles

saml_assertion_attribute

object

AuthN Mapping relationship to SAML Assertion Attribute.

data [required]

object

Data of AuthN Mapping relationship to SAML Assertion Attribute.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

team

object

Relationship to team.

data

object

Relationship to Team object.

id

string

The unique identifier of the team.

type

enum

Team type Allowed enum values: team

default: team

type [required]

enum

AuthN Mappings resource type. Allowed enum values: authn_mappings

default: authn_mappings

included

[ <oneOf>]

Included data in the AuthN Mapping response.

Option 1

object

SAML assertion attribute.

attributes

object

Key/Value pair of attributes used in SAML assertion attributes.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

Option 2

object

Role object returned by the API.

attributes

object

Attributes of the role.

created_at

date-time

Creation time of the role.

modified_at

date-time

Time of last role modification.

name

string

The name of the role. The name is neither unique nor a stable identifier of the role.

user_count

int64

Number of users with that role.

id

string

The unique identifier of the role.

relationships

object

Relationships of the role object returned by the API.

permissions

object

Relationship to multiple permissions objects.

data

[object]

Relationships to permission objects.

id

string

ID of the permission.

type

enum

Permissions resource type. Allowed enum values: permissions

default: permissions

type [required]

enum

Roles type. Allowed enum values: roles

default: roles

Option 3

object

Team.

attributes

object

Team attributes.

avatar

string

Unicode representation of the avatar for the team, limited to a single grapheme

banner

int64

Banner selection for the team

handle

string

The team's identifier

link_count

int32

The number of links belonging to the team

name

string

The name of the team

summary

string

A brief summary of the team, derived from the description

user_count

int32

The number of users belonging to the team

id

string

The ID of the Team.

type

enum

Team type Allowed enum values: team

default: team

{
  "data": {
    "attributes": {
      "attribute_key": "member-of",
      "attribute_value": "Development",
      "created_at": "2019-09-19T10:00:00.000Z",
      "modified_at": "2019-09-19T10:00:00.000Z",
      "saml_assertion_attribute_id": "0"
    },
    "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
    "relationships": {
      "role": {
        "data": {
          "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
          "type": "roles"
        }
      },
      "saml_assertion_attribute": {
        "data": {
          "id": "0",
          "type": "saml_assertion_attributes"
        }
      },
      "team": {
        "data": {
          "id": "f9bb8444-af7f-11ec-ac2c-da7ad0900001",
          "type": "team"
        }
      }
    },
    "type": "authn_mappings"
  },
  "included": [
    {
      "attributes": {
        "attribute_key": "member-of",
        "attribute_value": "Development"
      },
      "id": "0",
      "type": "saml_assertion_attributes"
    }
  ]
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Conflict

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Unprocessable Entity

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export authn_mapping_id="CHANGE_ME"
# Curl command
curl -X PATCH "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/authn_mappings/${authn_mapping_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": { "attributes": { "attribute_key": "member-of", "attribute_value": "Development" }, "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d", "relationships": { "role": { "data": { "id": "string", "type": "roles" } } }, "type": "authn_mappings" } } EOF
// Edit an AuthN Mapping returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "authn_mapping" in the system
	AuthnMappingDataID := os.Getenv("AUTHN_MAPPING_DATA_ID")

	// there is a valid "role" in the system
	RoleDataID := os.Getenv("ROLE_DATA_ID")

	body := datadogV2.AuthNMappingUpdateRequest{
		Data: datadogV2.AuthNMappingUpdateData{
			Attributes: &datadogV2.AuthNMappingUpdateAttributes{
				AttributeKey:   datadog.PtrString("member-of"),
				AttributeValue: datadog.PtrString("Development"),
			},
			Id: AuthnMappingDataID,
			Relationships: &datadogV2.AuthNMappingUpdateRelationships{
				AuthNMappingRelationshipToRole: &datadogV2.AuthNMappingRelationshipToRole{
					Role: datadogV2.RelationshipToRole{
						Data: &datadogV2.RelationshipToRoleData{
							Id:   datadog.PtrString(RoleDataID),
							Type: datadogV2.ROLESTYPE_ROLES.Ptr(),
						},
					},
				}},
			Type: datadogV2.AUTHNMAPPINGSTYPE_AUTHN_MAPPINGS,
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAuthNMappingsApi(apiClient)
	resp, r, err := api.UpdateAuthNMapping(ctx, AuthnMappingDataID, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `AuthNMappingsApi.UpdateAuthNMapping`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `AuthNMappingsApi.UpdateAuthNMapping`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Edit an AuthN Mapping returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.AuthNMappingsApi;
import com.datadog.api.client.v2.model.AuthNMappingRelationshipToRole;
import com.datadog.api.client.v2.model.AuthNMappingResponse;
import com.datadog.api.client.v2.model.AuthNMappingUpdateAttributes;
import com.datadog.api.client.v2.model.AuthNMappingUpdateData;
import com.datadog.api.client.v2.model.AuthNMappingUpdateRelationships;
import com.datadog.api.client.v2.model.AuthNMappingUpdateRequest;
import com.datadog.api.client.v2.model.AuthNMappingsType;
import com.datadog.api.client.v2.model.RelationshipToRole;
import com.datadog.api.client.v2.model.RelationshipToRoleData;
import com.datadog.api.client.v2.model.RolesType;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    AuthNMappingsApi apiInstance = new AuthNMappingsApi(defaultClient);

    // there is a valid "authn_mapping" in the system
    String AUTHN_MAPPING_DATA_ID = System.getenv("AUTHN_MAPPING_DATA_ID");

    // there is a valid "role" in the system
    String ROLE_DATA_ID = System.getenv("ROLE_DATA_ID");

    AuthNMappingUpdateRequest body =
        new AuthNMappingUpdateRequest()
            .data(
                new AuthNMappingUpdateData()
                    .attributes(
                        new AuthNMappingUpdateAttributes()
                            .attributeKey("member-of")
                            .attributeValue("Development"))
                    .id(AUTHN_MAPPING_DATA_ID)
                    .relationships(
                        new AuthNMappingUpdateRelationships(
                            new AuthNMappingRelationshipToRole()
                                .role(
                                    new RelationshipToRole()
                                        .data(
                                            new RelationshipToRoleData()
                                                .id(ROLE_DATA_ID)
                                                .type(RolesType.ROLES)))))
                    .type(AuthNMappingsType.AUTHN_MAPPINGS));

    try {
      AuthNMappingResponse result = apiInstance.updateAuthNMapping(AUTHN_MAPPING_DATA_ID, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling AuthNMappingsApi#updateAuthNMapping");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Edit an AuthN Mapping returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.authn_mappings_api import AuthNMappingsApi
from datadog_api_client.v2.model.authn_mapping_relationship_to_role import AuthNMappingRelationshipToRole
from datadog_api_client.v2.model.authn_mapping_update_attributes import AuthNMappingUpdateAttributes
from datadog_api_client.v2.model.authn_mapping_update_data import AuthNMappingUpdateData
from datadog_api_client.v2.model.authn_mapping_update_request import AuthNMappingUpdateRequest
from datadog_api_client.v2.model.authn_mappings_type import AuthNMappingsType
from datadog_api_client.v2.model.relationship_to_role import RelationshipToRole
from datadog_api_client.v2.model.relationship_to_role_data import RelationshipToRoleData
from datadog_api_client.v2.model.roles_type import RolesType

# there is a valid "authn_mapping" in the system
AUTHN_MAPPING_DATA_ID = environ["AUTHN_MAPPING_DATA_ID"]

# there is a valid "role" in the system
ROLE_DATA_ID = environ["ROLE_DATA_ID"]

body = AuthNMappingUpdateRequest(
    data=AuthNMappingUpdateData(
        attributes=AuthNMappingUpdateAttributes(
            attribute_key="member-of",
            attribute_value="Development",
        ),
        id=AUTHN_MAPPING_DATA_ID,
        relationships=AuthNMappingRelationshipToRole(
            role=RelationshipToRole(
                data=RelationshipToRoleData(
                    id=ROLE_DATA_ID,
                    type=RolesType.ROLES,
                ),
            ),
        ),
        type=AuthNMappingsType.AUTHN_MAPPINGS,
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = AuthNMappingsApi(api_client)
    response = api_instance.update_authn_mapping(authn_mapping_id=AUTHN_MAPPING_DATA_ID, body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Edit an AuthN Mapping returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::AuthNMappingsAPI.new

# there is a valid "authn_mapping" in the system
AUTHN_MAPPING_DATA_ID = ENV["AUTHN_MAPPING_DATA_ID"]

# there is a valid "role" in the system
ROLE_DATA_ID = ENV["ROLE_DATA_ID"]

body = DatadogAPIClient::V2::AuthNMappingUpdateRequest.new({
  data: DatadogAPIClient::V2::AuthNMappingUpdateData.new({
    attributes: DatadogAPIClient::V2::AuthNMappingUpdateAttributes.new({
      attribute_key: "member-of",
      attribute_value: "Development",
    }),
    id: AUTHN_MAPPING_DATA_ID,
    relationships: DatadogAPIClient::V2::AuthNMappingRelationshipToRole.new({
      role: DatadogAPIClient::V2::RelationshipToRole.new({
        data: DatadogAPIClient::V2::RelationshipToRoleData.new({
          id: ROLE_DATA_ID,
          type: DatadogAPIClient::V2::RolesType::ROLES,
        }),
      }),
    }),
    type: DatadogAPIClient::V2::AuthNMappingsType::AUTHN_MAPPINGS,
  }),
})
p api_instance.update_authn_mapping(AUTHN_MAPPING_DATA_ID, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Edit an AuthN Mapping returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_authn_mappings::AuthNMappingsAPI;
use datadog_api_client::datadogV2::model::AuthNMappingRelationshipToRole;
use datadog_api_client::datadogV2::model::AuthNMappingUpdateAttributes;
use datadog_api_client::datadogV2::model::AuthNMappingUpdateData;
use datadog_api_client::datadogV2::model::AuthNMappingUpdateRelationships;
use datadog_api_client::datadogV2::model::AuthNMappingUpdateRequest;
use datadog_api_client::datadogV2::model::AuthNMappingsType;
use datadog_api_client::datadogV2::model::RelationshipToRole;
use datadog_api_client::datadogV2::model::RelationshipToRoleData;
use datadog_api_client::datadogV2::model::RolesType;

#[tokio::main]
async fn main() {
    // there is a valid "authn_mapping" in the system
    let authn_mapping_data_id = std::env::var("AUTHN_MAPPING_DATA_ID").unwrap();

    // there is a valid "role" in the system
    let role_data_id = std::env::var("ROLE_DATA_ID").unwrap();
    let body = AuthNMappingUpdateRequest::new(
        AuthNMappingUpdateData::new(
            authn_mapping_data_id.clone(),
            AuthNMappingsType::AUTHN_MAPPINGS,
        )
        .attributes(
            AuthNMappingUpdateAttributes::new()
                .attribute_key("member-of".to_string())
                .attribute_value("Development".to_string()),
        )
        .relationships(
            AuthNMappingUpdateRelationships::AuthNMappingRelationshipToRole(Box::new(
                AuthNMappingRelationshipToRole::new(
                    RelationshipToRole::new().data(
                        RelationshipToRoleData::new()
                            .id(role_data_id.clone())
                            .type_(RolesType::ROLES),
                    ),
                ),
            )),
        ),
    );
    let configuration = datadog::Configuration::new();
    let api = AuthNMappingsAPI::with_config(configuration);
    let resp = api
        .update_authn_mapping(authn_mapping_data_id.clone(), body)
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Edit an AuthN Mapping returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.AuthNMappingsApi(configuration);

// there is a valid "authn_mapping" in the system
const AUTHN_MAPPING_DATA_ID = process.env.AUTHN_MAPPING_DATA_ID as string;

// there is a valid "role" in the system
const ROLE_DATA_ID = process.env.ROLE_DATA_ID as string;

const params: v2.AuthNMappingsApiUpdateAuthNMappingRequest = {
  body: {
    data: {
      attributes: {
        attributeKey: "member-of",
        attributeValue: "Development",
      },
      id: AUTHN_MAPPING_DATA_ID,
      relationships: {
        role: {
          data: {
            id: ROLE_DATA_ID,
            type: "roles",
          },
        },
      },
      type: "authn_mappings",
    },
  },
  authnMappingId: AUTHN_MAPPING_DATA_ID,
};

apiInstance
  .updateAuthNMapping(params)
  .then((data: v2.AuthNMappingResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

DELETE https://api.ap1.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.datadoghq.eu/api/v2/authn_mappings/{authn_mapping_id}https://api.ddog-gov.com/api/v2/authn_mappings/{authn_mapping_id}https://api.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.us3.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}https://api.us5.datadoghq.com/api/v2/authn_mappings/{authn_mapping_id}

Información general

Delete an AuthN Mapping specified by AuthN Mapping UUID. This endpoint requires the user_access_manage permission.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

authn_mapping_id [required]

string

The UUID of the AuthN Mapping.

Respuesta

OK

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export authn_mapping_id="CHANGE_ME"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/authn_mappings/${authn_mapping_id}" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Delete an AuthN Mapping returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.authn_mappings_api import AuthNMappingsApi

# there is a valid "authn_mapping" in the system
AUTHN_MAPPING_DATA_ID = environ["AUTHN_MAPPING_DATA_ID"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = AuthNMappingsApi(api_client)
    api_instance.delete_authn_mapping(
        authn_mapping_id=AUTHN_MAPPING_DATA_ID,
    )

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Delete an AuthN Mapping returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::AuthNMappingsAPI.new

# there is a valid "authn_mapping" in the system
AUTHN_MAPPING_DATA_ID = ENV["AUTHN_MAPPING_DATA_ID"]
api_instance.delete_authn_mapping(AUTHN_MAPPING_DATA_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Delete an AuthN Mapping returns "OK" response

package main

import (
	"context"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "authn_mapping" in the system
	AuthnMappingDataID := os.Getenv("AUTHN_MAPPING_DATA_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAuthNMappingsApi(apiClient)
	r, err := api.DeleteAuthNMapping(ctx, AuthnMappingDataID)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `AuthNMappingsApi.DeleteAuthNMapping`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Delete an AuthN Mapping returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.AuthNMappingsApi;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    AuthNMappingsApi apiInstance = new AuthNMappingsApi(defaultClient);

    // there is a valid "authn_mapping" in the system
    String AUTHN_MAPPING_DATA_ID = System.getenv("AUTHN_MAPPING_DATA_ID");

    try {
      apiInstance.deleteAuthNMapping(AUTHN_MAPPING_DATA_ID);
    } catch (ApiException e) {
      System.err.println("Exception when calling AuthNMappingsApi#deleteAuthNMapping");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Delete an AuthN Mapping returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_authn_mappings::AuthNMappingsAPI;

#[tokio::main]
async fn main() {
    // there is a valid "authn_mapping" in the system
    let authn_mapping_data_id = std::env::var("AUTHN_MAPPING_DATA_ID").unwrap();
    let configuration = datadog::Configuration::new();
    let api = AuthNMappingsAPI::with_config(configuration);
    let resp = api
        .delete_authn_mapping(authn_mapping_data_id.clone())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Delete an AuthN Mapping returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.AuthNMappingsApi(configuration);

// there is a valid "authn_mapping" in the system
const AUTHN_MAPPING_DATA_ID = process.env.AUTHN_MAPPING_DATA_ID as string;

const params: v2.AuthNMappingsApiDeleteAuthNMappingRequest = {
  authnMappingId: AUTHN_MAPPING_DATA_ID,
};

apiInstance
  .deleteAuthNMapping(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v2/authn_mappingshttps://api.datadoghq.eu/api/v2/authn_mappingshttps://api.ddog-gov.com/api/v2/authn_mappingshttps://api.datadoghq.com/api/v2/authn_mappingshttps://api.us3.datadoghq.com/api/v2/authn_mappingshttps://api.us5.datadoghq.com/api/v2/authn_mappings

Información general

List all AuthN Mappings in the org.

Argumentos

Cadenas de consulta

Nombre

Tipo

Descripción

page[size]

integer

Size for a given page. The maximum allowed value is 100.

page[number]

integer

Specific page number to return.

sort

enum

Sort AuthN Mappings depending on the given field.
Allowed enum values: created_at, -created_at, role_id, -role_id, saml_assertion_attribute_id, -saml_assertion_attribute_id, role.name, -role.name, saml_assertion_attribute.attribute_key, -saml_assertion_attribute.attribute_key, saml_assertion_attribute.attribute_value, -saml_assertion_attribute.attribute_value

filter

string

Filter all mappings by the given string.

resource_type

enum

Filter by mapping resource type. Defaults to “role” if not specified.
Allowed enum values: role, team

Respuesta

OK

Array of AuthN Mappings response.

Expand All

Campo

Tipo

Descripción

data

[object]

Array of returned AuthN Mappings.

attributes

object

Attributes of AuthN Mapping.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

created_at

date-time

Creation time of the AuthN Mapping.

modified_at

date-time

Time of last AuthN Mapping modification.

saml_assertion_attribute_id

string

The ID of the SAML assertion attribute.

id [required]

string

ID of the AuthN Mapping.

relationships

object

All relationships associated with AuthN Mapping.

role

object

Relationship to role.

data

object

Relationship to role object.

id

string

The unique identifier of the role.

type

enum

Roles type. Allowed enum values: roles

default: roles

saml_assertion_attribute

object

AuthN Mapping relationship to SAML Assertion Attribute.

data [required]

object

Data of AuthN Mapping relationship to SAML Assertion Attribute.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

team

object

Relationship to team.

data

object

Relationship to Team object.

id

string

The unique identifier of the team.

type

enum

Team type Allowed enum values: team

default: team

type [required]

enum

AuthN Mappings resource type. Allowed enum values: authn_mappings

default: authn_mappings

included

[ <oneOf>]

Included data in the AuthN Mapping response.

Option 1

object

SAML assertion attribute.

attributes

object

Key/Value pair of attributes used in SAML assertion attributes.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

Option 2

object

Role object returned by the API.

attributes

object

Attributes of the role.

created_at

date-time

Creation time of the role.

modified_at

date-time

Time of last role modification.

name

string

The name of the role. The name is neither unique nor a stable identifier of the role.

user_count

int64

Number of users with that role.

id

string

The unique identifier of the role.

relationships

object

Relationships of the role object returned by the API.

permissions

object

Relationship to multiple permissions objects.

data

[object]

Relationships to permission objects.

id

string

ID of the permission.

type

enum

Permissions resource type. Allowed enum values: permissions

default: permissions

type [required]

enum

Roles type. Allowed enum values: roles

default: roles

Option 3

object

Team.

attributes

object

Team attributes.

avatar

string

Unicode representation of the avatar for the team, limited to a single grapheme

banner

int64

Banner selection for the team

handle

string

The team's identifier

link_count

int32

The number of links belonging to the team

name

string

The name of the team

summary

string

A brief summary of the team, derived from the description

user_count

int32

The number of users belonging to the team

id

string

The ID of the Team.

type

enum

Team type Allowed enum values: team

default: team

meta

object

Object describing meta attributes of response.

page

object

Pagination object.

total_count

int64

Total count.

total_filtered_count

int64

Total count of elements matched by the filter.

{
  "data": [
    {
      "attributes": {
        "attribute_key": "member-of",
        "attribute_value": "Development",
        "created_at": "2019-09-19T10:00:00.000Z",
        "modified_at": "2019-09-19T10:00:00.000Z",
        "saml_assertion_attribute_id": "0"
      },
      "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
      "relationships": {
        "role": {
          "data": {
            "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
            "type": "roles"
          }
        },
        "saml_assertion_attribute": {
          "data": {
            "id": "0",
            "type": "saml_assertion_attributes"
          }
        },
        "team": {
          "data": {
            "id": "f9bb8444-af7f-11ec-ac2c-da7ad0900001",
            "type": "team"
          }
        }
      },
      "type": "authn_mappings"
    }
  ],
  "included": [
    {
      "attributes": {
        "attribute_key": "member-of",
        "attribute_value": "Development"
      },
      "id": "0",
      "type": "saml_assertion_attributes"
    }
  ],
  "meta": {
    "page": {
      "total_count": "integer",
      "total_filtered_count": "integer"
    }
  }
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/authn_mappings" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
List all AuthN Mappings returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.authn_mappings_api import AuthNMappingsApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = AuthNMappingsApi(api_client)
    response = api_instance.list_authn_mappings()

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# List all AuthN Mappings returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::AuthNMappingsAPI.new
p api_instance.list_authn_mappings()

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// List all AuthN Mappings returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAuthNMappingsApi(apiClient)
	resp, r, err := api.ListAuthNMappings(ctx, *datadogV2.NewListAuthNMappingsOptionalParameters())

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `AuthNMappingsApi.ListAuthNMappings`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `AuthNMappingsApi.ListAuthNMappings`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// List all AuthN Mappings returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.AuthNMappingsApi;
import com.datadog.api.client.v2.model.AuthNMappingsResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    AuthNMappingsApi apiInstance = new AuthNMappingsApi(defaultClient);

    try {
      AuthNMappingsResponse result = apiInstance.listAuthNMappings();
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling AuthNMappingsApi#listAuthNMappings");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// List all AuthN Mappings returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_authn_mappings::AuthNMappingsAPI;
use datadog_api_client::datadogV2::api_authn_mappings::ListAuthNMappingsOptionalParams;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = AuthNMappingsAPI::with_config(configuration);
    let resp = api
        .list_authn_mappings(ListAuthNMappingsOptionalParams::default())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * List all AuthN Mappings returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.AuthNMappingsApi(configuration);

apiInstance
  .listAuthNMappings()
  .then((data: v2.AuthNMappingsResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v2/authn_mappingshttps://api.datadoghq.eu/api/v2/authn_mappingshttps://api.ddog-gov.com/api/v2/authn_mappingshttps://api.datadoghq.com/api/v2/authn_mappingshttps://api.us3.datadoghq.com/api/v2/authn_mappingshttps://api.us5.datadoghq.com/api/v2/authn_mappings

Información general

Create an AuthN Mapping. This endpoint requires the user_access_manage permission.

Solicitud

Body Data (required)

Expand All

Campo

Tipo

Descripción

data [required]

object

Data for creating an AuthN Mapping.

attributes

object

Key/Value pair of attributes used for create request.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

relationships

 <oneOf>

Relationship of AuthN Mapping create object to a Role or Team.

Option 1

object

Relationship of AuthN Mapping to a Role.

role [required]

object

Relationship to role.

data

object

Relationship to role object.

id

string

The unique identifier of the role.

type

enum

Roles type. Allowed enum values: roles

default: roles

Option 2

object

Relationship of AuthN Mapping to a Team.

team [required]

object

Relationship to team.

data

object

Relationship to Team object.

id

string

The unique identifier of the team.

type

enum

Team type Allowed enum values: team

default: team

type [required]

enum

AuthN Mappings resource type. Allowed enum values: authn_mappings

default: authn_mappings

{
  "data": {
    "attributes": {
      "attribute_key": "exampleauthnmapping",
      "attribute_value": "Example-AuthN-Mapping"
    },
    "relationships": {
      "role": {
        "data": {
          "id": "string",
          "type": "roles"
        }
      }
    },
    "type": "authn_mappings"
  }
}

Respuesta

OK

AuthN Mapping response from the API.

Expand All

Campo

Tipo

Descripción

data

object

The AuthN Mapping object returned by API.

attributes

object

Attributes of AuthN Mapping.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

created_at

date-time

Creation time of the AuthN Mapping.

modified_at

date-time

Time of last AuthN Mapping modification.

saml_assertion_attribute_id

string

The ID of the SAML assertion attribute.

id [required]

string

ID of the AuthN Mapping.

relationships

object

All relationships associated with AuthN Mapping.

role

object

Relationship to role.

data

object

Relationship to role object.

id

string

The unique identifier of the role.

type

enum

Roles type. Allowed enum values: roles

default: roles

saml_assertion_attribute

object

AuthN Mapping relationship to SAML Assertion Attribute.

data [required]

object

Data of AuthN Mapping relationship to SAML Assertion Attribute.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

team

object

Relationship to team.

data

object

Relationship to Team object.

id

string

The unique identifier of the team.

type

enum

Team type Allowed enum values: team

default: team

type [required]

enum

AuthN Mappings resource type. Allowed enum values: authn_mappings

default: authn_mappings

included

[ <oneOf>]

Included data in the AuthN Mapping response.

Option 1

object

SAML assertion attribute.

attributes

object

Key/Value pair of attributes used in SAML assertion attributes.

attribute_key

string

Key portion of a key/value pair of the attribute sent from the Identity Provider.

attribute_value

string

Value portion of a key/value pair of the attribute sent from the Identity Provider.

id [required]

string

The ID of the SAML assertion attribute.

type [required]

enum

SAML assertion attributes resource type. Allowed enum values: saml_assertion_attributes

default: saml_assertion_attributes

Option 2

object

Role object returned by the API.

attributes

object

Attributes of the role.

created_at

date-time

Creation time of the role.

modified_at

date-time

Time of last role modification.

name

string

The name of the role. The name is neither unique nor a stable identifier of the role.

user_count

int64

Number of users with that role.

id

string

The unique identifier of the role.

relationships

object

Relationships of the role object returned by the API.

permissions

object

Relationship to multiple permissions objects.

data

[object]

Relationships to permission objects.

id

string

ID of the permission.

type

enum

Permissions resource type. Allowed enum values: permissions

default: permissions

type [required]

enum

Roles type. Allowed enum values: roles

default: roles

Option 3

object

Team.

attributes

object

Team attributes.

avatar

string

Unicode representation of the avatar for the team, limited to a single grapheme

banner

int64

Banner selection for the team

handle

string

The team's identifier

link_count

int32

The number of links belonging to the team

name

string

The name of the team

summary

string

A brief summary of the team, derived from the description

user_count

int32

The number of users belonging to the team

id

string

The ID of the Team.

type

enum

Team type Allowed enum values: team

default: team

{
  "data": {
    "attributes": {
      "attribute_key": "member-of",
      "attribute_value": "Development",
      "created_at": "2019-09-19T10:00:00.000Z",
      "modified_at": "2019-09-19T10:00:00.000Z",
      "saml_assertion_attribute_id": "0"
    },
    "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
    "relationships": {
      "role": {
        "data": {
          "id": "3653d3c6-0c75-11ea-ad28-fb5701eabc7d",
          "type": "roles"
        }
      },
      "saml_assertion_attribute": {
        "data": {
          "id": "0",
          "type": "saml_assertion_attributes"
        }
      },
      "team": {
        "data": {
          "id": "f9bb8444-af7f-11ec-ac2c-da7ad0900001",
          "type": "team"
        }
      }
    },
    "type": "authn_mappings"
  },
  "included": [
    {
      "attributes": {
        "attribute_key": "member-of",
        "attribute_value": "Development"
      },
      "id": "0",
      "type": "saml_assertion_attributes"
    }
  ]
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication Error

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/authn_mappings" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": { "attributes": { "attribute_key": "exampleauthnmapping", "attribute_value": "Example-AuthN-Mapping" }, "relationships": { "role": { "data": { "id": "string", "type": "roles" } } }, "type": "authn_mappings" } } EOF
// Create an AuthN Mapping returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "role" in the system
	RoleDataID := os.Getenv("ROLE_DATA_ID")

	body := datadogV2.AuthNMappingCreateRequest{
		Data: datadogV2.AuthNMappingCreateData{
			Attributes: &datadogV2.AuthNMappingCreateAttributes{
				AttributeKey:   datadog.PtrString("exampleauthnmapping"),
				AttributeValue: datadog.PtrString("Example-AuthN-Mapping"),
			},
			Relationships: &datadogV2.AuthNMappingCreateRelationships{
				AuthNMappingRelationshipToRole: &datadogV2.AuthNMappingRelationshipToRole{
					Role: datadogV2.RelationshipToRole{
						Data: &datadogV2.RelationshipToRoleData{
							Id:   datadog.PtrString(RoleDataID),
							Type: datadogV2.ROLESTYPE_ROLES.Ptr(),
						},
					},
				}},
			Type: datadogV2.AUTHNMAPPINGSTYPE_AUTHN_MAPPINGS,
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewAuthNMappingsApi(apiClient)
	resp, r, err := api.CreateAuthNMapping(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `AuthNMappingsApi.CreateAuthNMapping`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `AuthNMappingsApi.CreateAuthNMapping`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Create an AuthN Mapping returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.AuthNMappingsApi;
import com.datadog.api.client.v2.model.AuthNMappingCreateAttributes;
import com.datadog.api.client.v2.model.AuthNMappingCreateData;
import com.datadog.api.client.v2.model.AuthNMappingCreateRelationships;
import com.datadog.api.client.v2.model.AuthNMappingCreateRequest;
import com.datadog.api.client.v2.model.AuthNMappingRelationshipToRole;
import com.datadog.api.client.v2.model.AuthNMappingResponse;
import com.datadog.api.client.v2.model.AuthNMappingsType;
import com.datadog.api.client.v2.model.RelationshipToRole;
import com.datadog.api.client.v2.model.RelationshipToRoleData;
import com.datadog.api.client.v2.model.RolesType;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    AuthNMappingsApi apiInstance = new AuthNMappingsApi(defaultClient);

    // there is a valid "role" in the system
    String ROLE_DATA_ID = System.getenv("ROLE_DATA_ID");

    AuthNMappingCreateRequest body =
        new AuthNMappingCreateRequest()
            .data(
                new AuthNMappingCreateData()
                    .attributes(
                        new AuthNMappingCreateAttributes()
                            .attributeKey("exampleauthnmapping")
                            .attributeValue("Example-AuthN-Mapping"))
                    .relationships(
                        new AuthNMappingCreateRelationships(
                            new AuthNMappingRelationshipToRole()
                                .role(
                                    new RelationshipToRole()
                                        .data(
                                            new RelationshipToRoleData()
                                                .id(ROLE_DATA_ID)
                                                .type(RolesType.ROLES)))))
                    .type(AuthNMappingsType.AUTHN_MAPPINGS));

    try {
      AuthNMappingResponse result = apiInstance.createAuthNMapping(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling AuthNMappingsApi#createAuthNMapping");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Create an AuthN Mapping returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.authn_mappings_api import AuthNMappingsApi
from datadog_api_client.v2.model.authn_mapping_create_attributes import AuthNMappingCreateAttributes
from datadog_api_client.v2.model.authn_mapping_create_data import AuthNMappingCreateData
from datadog_api_client.v2.model.authn_mapping_create_request import AuthNMappingCreateRequest
from datadog_api_client.v2.model.authn_mapping_relationship_to_role import AuthNMappingRelationshipToRole
from datadog_api_client.v2.model.authn_mappings_type import AuthNMappingsType
from datadog_api_client.v2.model.relationship_to_role import RelationshipToRole
from datadog_api_client.v2.model.relationship_to_role_data import RelationshipToRoleData
from datadog_api_client.v2.model.roles_type import RolesType

# there is a valid "role" in the system
ROLE_DATA_ID = environ["ROLE_DATA_ID"]

body = AuthNMappingCreateRequest(
    data=AuthNMappingCreateData(
        attributes=AuthNMappingCreateAttributes(
            attribute_key="exampleauthnmapping",
            attribute_value="Example-AuthN-Mapping",
        ),
        relationships=AuthNMappingRelationshipToRole(
            role=RelationshipToRole(
                data=RelationshipToRoleData(
                    id=ROLE_DATA_ID,
                    type=RolesType.ROLES,
                ),
            ),
        ),
        type=AuthNMappingsType.AUTHN_MAPPINGS,
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = AuthNMappingsApi(api_client)
    response = api_instance.create_authn_mapping(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Create an AuthN Mapping returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::AuthNMappingsAPI.new

# there is a valid "role" in the system
ROLE_DATA_ID = ENV["ROLE_DATA_ID"]

body = DatadogAPIClient::V2::AuthNMappingCreateRequest.new({
  data: DatadogAPIClient::V2::AuthNMappingCreateData.new({
    attributes: DatadogAPIClient::V2::AuthNMappingCreateAttributes.new({
      attribute_key: "exampleauthnmapping",
      attribute_value: "Example-AuthN-Mapping",
    }),
    relationships: DatadogAPIClient::V2::AuthNMappingRelationshipToRole.new({
      role: DatadogAPIClient::V2::RelationshipToRole.new({
        data: DatadogAPIClient::V2::RelationshipToRoleData.new({
          id: ROLE_DATA_ID,
          type: DatadogAPIClient::V2::RolesType::ROLES,
        }),
      }),
    }),
    type: DatadogAPIClient::V2::AuthNMappingsType::AUTHN_MAPPINGS,
  }),
})
p api_instance.create_authn_mapping(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Create an AuthN Mapping returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_authn_mappings::AuthNMappingsAPI;
use datadog_api_client::datadogV2::model::AuthNMappingCreateAttributes;
use datadog_api_client::datadogV2::model::AuthNMappingCreateData;
use datadog_api_client::datadogV2::model::AuthNMappingCreateRelationships;
use datadog_api_client::datadogV2::model::AuthNMappingCreateRequest;
use datadog_api_client::datadogV2::model::AuthNMappingRelationshipToRole;
use datadog_api_client::datadogV2::model::AuthNMappingsType;
use datadog_api_client::datadogV2::model::RelationshipToRole;
use datadog_api_client::datadogV2::model::RelationshipToRoleData;
use datadog_api_client::datadogV2::model::RolesType;

#[tokio::main]
async fn main() {
    // there is a valid "role" in the system
    let role_data_id = std::env::var("ROLE_DATA_ID").unwrap();
    let body = AuthNMappingCreateRequest::new(
        AuthNMappingCreateData::new(AuthNMappingsType::AUTHN_MAPPINGS)
            .attributes(
                AuthNMappingCreateAttributes::new()
                    .attribute_key("exampleauthnmapping".to_string())
                    .attribute_value("Example-AuthN-Mapping".to_string()),
            )
            .relationships(
                AuthNMappingCreateRelationships::AuthNMappingRelationshipToRole(Box::new(
                    AuthNMappingRelationshipToRole::new(
                        RelationshipToRole::new().data(
                            RelationshipToRoleData::new()
                                .id(role_data_id.clone())
                                .type_(RolesType::ROLES),
                        ),
                    ),
                )),
            ),
    );
    let configuration = datadog::Configuration::new();
    let api = AuthNMappingsAPI::with_config(configuration);
    let resp = api.create_authn_mapping(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Create an AuthN Mapping returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.AuthNMappingsApi(configuration);

// there is a valid "role" in the system
const ROLE_DATA_ID = process.env.ROLE_DATA_ID as string;

const params: v2.AuthNMappingsApiCreateAuthNMappingRequest = {
  body: {
    data: {
      attributes: {
        attributeKey: "exampleauthnmapping",
        attributeValue: "Example-AuthN-Mapping",
      },
      relationships: {
        role: {
          data: {
            id: ROLE_DATA_ID,
            type: "roles",
          },
        },
      },
      type: "authn_mappings",
    },
  },
};

apiInstance
  .createAuthNMapping(params)
  .then((data: v2.AuthNMappingResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers