This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Rum Retention Filters

Manage retention filters through Manage Applications of RUM for your organization.

GET https://api.ap1.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.datadoghq.eu/api/v2/rum/applications/{app_id}/retention_filtershttps://api.ddog-gov.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.us3.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.us5.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters

Información general

Get the list of RUM retention filters for a RUM application.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

app_id [required]

string

RUM application ID.

Respuesta

OK

All RUM retention filters for a RUM application.

Expand All

Campo

Tipo

Descripción

data

[object]

A list of RUM retention filters.

attributes

object

The object describing attributes of a RUM retention filter.

enabled

boolean

Whether the retention filter is enabled.

event_type

enum

The type of RUM events to filter on. Allowed enum values: session,view,action,error,resource,long_task,vital

name

string

The name of a RUM retention filter.

query

string

The query string for a RUM retention filter.

sample_rate

int64

The sample rate for a RUM retention filter, between 0 and 100.

id

string

ID of retention filter in UUID.

type

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": [
    {
      "attributes": {
        "enabled": true,
        "event_type": "session",
        "name": "Retention filter for session",
        "query": "@session.has_replay:true",
        "sample_rate": 25
      },
      "id": "051601eb-54a0-abc0-03f9-cc02efa18892",
      "type": "retention_filters"
    }
  ]
}

Not Authorized

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export app_id="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/rum/applications/${app_id}/retention_filters" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get all RUM retention filters returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.rum_retention_filters_api import RumRetentionFiltersApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = RumRetentionFiltersApi(api_client)
    response = api_instance.list_retention_filters(
        app_id="1d4b9c34-7ac4-423a-91cf-9902d926e9b3",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get all RUM retention filters returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::RumRetentionFiltersAPI.new
p api_instance.list_retention_filters("1d4b9c34-7ac4-423a-91cf-9902d926e9b3")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get all RUM retention filters returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewRumRetentionFiltersApi(apiClient)
	resp, r, err := api.ListRetentionFilters(ctx, "1d4b9c34-7ac4-423a-91cf-9902d926e9b3")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `RumRetentionFiltersApi.ListRetentionFilters`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `RumRetentionFiltersApi.ListRetentionFilters`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get all RUM retention filters returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.RumRetentionFiltersApi;
import com.datadog.api.client.v2.model.RumRetentionFiltersResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    RumRetentionFiltersApi apiInstance = new RumRetentionFiltersApi(defaultClient);

    try {
      RumRetentionFiltersResponse result =
          apiInstance.listRetentionFilters("1d4b9c34-7ac4-423a-91cf-9902d926e9b3");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling RumRetentionFiltersApi#listRetentionFilters");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get all RUM retention filters returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_rum_retention_filters::RumRetentionFiltersAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = RumRetentionFiltersAPI::with_config(configuration);
    let resp = api
        .list_retention_filters("1d4b9c34-7ac4-423a-91cf-9902d926e9b3".to_string())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get all RUM retention filters returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.RumRetentionFiltersApi(configuration);

const params: v2.RumRetentionFiltersApiListRetentionFiltersRequest = {
  appId: "1d4b9c34-7ac4-423a-91cf-9902d926e9b3",
};

apiInstance
  .listRetentionFilters(params)
  .then((data: v2.RumRetentionFiltersResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.datadoghq.eu/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.ddog-gov.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.us3.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.us5.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}

Información general

Get a RUM retention filter for a RUM application.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

app_id [required]

string

RUM application ID.

rf_id [required]

string

Retention filter ID.

Respuesta

OK

The RUM retention filter object.

Expand All

Campo

Tipo

Descripción

data

object

The RUM retention filter.

attributes

object

The object describing attributes of a RUM retention filter.

enabled

boolean

Whether the retention filter is enabled.

event_type

enum

The type of RUM events to filter on. Allowed enum values: session,view,action,error,resource,long_task,vital

name

string

The name of a RUM retention filter.

query

string

The query string for a RUM retention filter.

sample_rate

int64

The sample rate for a RUM retention filter, between 0 and 100.

id

string

ID of retention filter in UUID.

type

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": {
    "attributes": {
      "enabled": true,
      "event_type": "session",
      "name": "Retention filter for session",
      "query": "@session.has_replay:true",
      "sample_rate": 25
    },
    "id": "051601eb-54a0-abc0-03f9-cc02efa18892",
    "type": "retention_filters"
  }
}

Not Authorized

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export app_id="CHANGE_ME"
export rf_id="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/rum/applications/${app_id}/retention_filters/${rf_id}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get a RUM retention filter returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.rum_retention_filters_api import RumRetentionFiltersApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = RumRetentionFiltersApi(api_client)
    response = api_instance.get_retention_filter(
        app_id="a33671aa-24fd-4dcd-ba4b-5bbdbafe7690",
        rf_id="4b95d361-f65d-4515-9824-c9aaeba5ac2a",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get a RUM retention filter returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::RumRetentionFiltersAPI.new
p api_instance.get_retention_filter("a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "4b95d361-f65d-4515-9824-c9aaeba5ac2a")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get a RUM retention filter returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewRumRetentionFiltersApi(apiClient)
	resp, r, err := api.GetRetentionFilter(ctx, "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "4b95d361-f65d-4515-9824-c9aaeba5ac2a")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `RumRetentionFiltersApi.GetRetentionFilter`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `RumRetentionFiltersApi.GetRetentionFilter`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get a RUM retention filter returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.RumRetentionFiltersApi;
import com.datadog.api.client.v2.model.RumRetentionFilterResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    RumRetentionFiltersApi apiInstance = new RumRetentionFiltersApi(defaultClient);

    try {
      RumRetentionFilterResponse result =
          apiInstance.getRetentionFilter(
              "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "4b95d361-f65d-4515-9824-c9aaeba5ac2a");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling RumRetentionFiltersApi#getRetentionFilter");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get a RUM retention filter returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_rum_retention_filters::RumRetentionFiltersAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = RumRetentionFiltersAPI::with_config(configuration);
    let resp = api
        .get_retention_filter(
            "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690".to_string(),
            "4b95d361-f65d-4515-9824-c9aaeba5ac2a".to_string(),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get a RUM retention filter returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.RumRetentionFiltersApi(configuration);

const params: v2.RumRetentionFiltersApiGetRetentionFilterRequest = {
  appId: "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690",
  rfId: "4b95d361-f65d-4515-9824-c9aaeba5ac2a",
};

apiInstance
  .getRetentionFilter(params)
  .then((data: v2.RumRetentionFilterResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.datadoghq.eu/api/v2/rum/applications/{app_id}/retention_filtershttps://api.ddog-gov.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.us3.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filtershttps://api.us5.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters

Información general

Create a RUM retention filter for a RUM application. Returns RUM retention filter objects from the request body when the request is successful.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

app_id [required]

string

RUM application ID.

Solicitud

Body Data (required)

The definition of the new RUM retention filter.

Expand All

Campo

Tipo

Descripción

data [required]

object

The new RUM retention filter properties to create.

attributes [required]

object

The object describing attributes of a RUM retention filter to create.

enabled

boolean

Whether the retention filter is enabled.

event_type [required]

enum

The type of RUM events to filter on. Allowed enum values: session,view,action,error,resource,long_task,vital

name [required]

string

The name of a RUM retention filter.

query

string

The query string for a RUM retention filter.

sample_rate [required]

int64

The sample rate for a RUM retention filter, between 0 and 100.

type [required]

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": {
    "type": "retention_filters",
    "attributes": {
      "name": "Test creating retention filter",
      "event_type": "session",
      "query": "custom_query",
      "sample_rate": 50,
      "enabled": true
    }
  }
}

Respuesta

Created

The RUM retention filter object.

Expand All

Campo

Tipo

Descripción

data

object

The RUM retention filter.

attributes

object

The object describing attributes of a RUM retention filter.

enabled

boolean

Whether the retention filter is enabled.

event_type

enum

The type of RUM events to filter on. Allowed enum values: session,view,action,error,resource,long_task,vital

name

string

The name of a RUM retention filter.

query

string

The query string for a RUM retention filter.

sample_rate

int64

The sample rate for a RUM retention filter, between 0 and 100.

id

string

ID of retention filter in UUID.

type

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": {
    "attributes": {
      "enabled": true,
      "event_type": "session",
      "name": "Retention filter for session",
      "query": "@session.has_replay:true",
      "sample_rate": 25
    },
    "id": "051601eb-54a0-abc0-03f9-cc02efa18892",
    "type": "retention_filters"
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Authorized

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export app_id="CHANGE_ME"
# Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/rum/applications/${app_id}/retention_filters" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": { "type": "retention_filters", "attributes": { "name": "Test creating retention filter", "event_type": "session", "query": "custom_query", "sample_rate": 50, "enabled": true } } } EOF
// Create a RUM retention filter returns "Created" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.RumRetentionFilterCreateRequest{
		Data: datadogV2.RumRetentionFilterCreateData{
			Type: datadogV2.RUMRETENTIONFILTERTYPE_RETENTION_FILTERS,
			Attributes: datadogV2.RumRetentionFilterCreateAttributes{
				Name:       "Test creating retention filter",
				EventType:  datadogV2.RUMRETENTIONFILTEREVENTTYPE_SESSION,
				Query:      datadog.PtrString("custom_query"),
				SampleRate: 50,
				Enabled:    datadog.PtrBool(true),
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewRumRetentionFiltersApi(apiClient)
	resp, r, err := api.CreateRetentionFilter(ctx, "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `RumRetentionFiltersApi.CreateRetentionFilter`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `RumRetentionFiltersApi.CreateRetentionFilter`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Create a RUM retention filter returns "Created" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.RumRetentionFiltersApi;
import com.datadog.api.client.v2.model.RumRetentionFilterCreateAttributes;
import com.datadog.api.client.v2.model.RumRetentionFilterCreateData;
import com.datadog.api.client.v2.model.RumRetentionFilterCreateRequest;
import com.datadog.api.client.v2.model.RumRetentionFilterEventType;
import com.datadog.api.client.v2.model.RumRetentionFilterResponse;
import com.datadog.api.client.v2.model.RumRetentionFilterType;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    RumRetentionFiltersApi apiInstance = new RumRetentionFiltersApi(defaultClient);

    RumRetentionFilterCreateRequest body =
        new RumRetentionFilterCreateRequest()
            .data(
                new RumRetentionFilterCreateData()
                    .type(RumRetentionFilterType.RETENTION_FILTERS)
                    .attributes(
                        new RumRetentionFilterCreateAttributes()
                            .name("Test creating retention filter")
                            .eventType(RumRetentionFilterEventType.SESSION)
                            .query("custom_query")
                            .sampleRate(50L)
                            .enabled(true)));

    try {
      RumRetentionFilterResponse result =
          apiInstance.createRetentionFilter("a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling RumRetentionFiltersApi#createRetentionFilter");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Create a RUM retention filter returns "Created" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.rum_retention_filters_api import RumRetentionFiltersApi
from datadog_api_client.v2.model.rum_retention_filter_create_attributes import RumRetentionFilterCreateAttributes
from datadog_api_client.v2.model.rum_retention_filter_create_data import RumRetentionFilterCreateData
from datadog_api_client.v2.model.rum_retention_filter_create_request import RumRetentionFilterCreateRequest
from datadog_api_client.v2.model.rum_retention_filter_event_type import RumRetentionFilterEventType
from datadog_api_client.v2.model.rum_retention_filter_type import RumRetentionFilterType

body = RumRetentionFilterCreateRequest(
    data=RumRetentionFilterCreateData(
        type=RumRetentionFilterType.RETENTION_FILTERS,
        attributes=RumRetentionFilterCreateAttributes(
            name="Test creating retention filter",
            event_type=RumRetentionFilterEventType.SESSION,
            query="custom_query",
            sample_rate=50,
            enabled=True,
        ),
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = RumRetentionFiltersApi(api_client)
    response = api_instance.create_retention_filter(app_id="a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Create a RUM retention filter returns "Created" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::RumRetentionFiltersAPI.new

body = DatadogAPIClient::V2::RumRetentionFilterCreateRequest.new({
  data: DatadogAPIClient::V2::RumRetentionFilterCreateData.new({
    type: DatadogAPIClient::V2::RumRetentionFilterType::RETENTION_FILTERS,
    attributes: DatadogAPIClient::V2::RumRetentionFilterCreateAttributes.new({
      name: "Test creating retention filter",
      event_type: DatadogAPIClient::V2::RumRetentionFilterEventType::SESSION,
      query: "custom_query",
      sample_rate: 50,
      enabled: true,
    }),
  }),
})
p api_instance.create_retention_filter("a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Create a RUM retention filter returns "Created" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_rum_retention_filters::RumRetentionFiltersAPI;
use datadog_api_client::datadogV2::model::RumRetentionFilterCreateAttributes;
use datadog_api_client::datadogV2::model::RumRetentionFilterCreateData;
use datadog_api_client::datadogV2::model::RumRetentionFilterCreateRequest;
use datadog_api_client::datadogV2::model::RumRetentionFilterEventType;
use datadog_api_client::datadogV2::model::RumRetentionFilterType;

#[tokio::main]
async fn main() {
    let body = RumRetentionFilterCreateRequest::new(RumRetentionFilterCreateData::new(
        RumRetentionFilterCreateAttributes::new(
            RumRetentionFilterEventType::SESSION,
            "Test creating retention filter".to_string(),
            50,
        )
        .enabled(true)
        .query("custom_query".to_string()),
        RumRetentionFilterType::RETENTION_FILTERS,
    ));
    let configuration = datadog::Configuration::new();
    let api = RumRetentionFiltersAPI::with_config(configuration);
    let resp = api
        .create_retention_filter("a33671aa-24fd-4dcd-ba4b-5bbdbafe7690".to_string(), body)
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Create a RUM retention filter returns "Created" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.RumRetentionFiltersApi(configuration);

const params: v2.RumRetentionFiltersApiCreateRetentionFilterRequest = {
  body: {
    data: {
      type: "retention_filters",
      attributes: {
        name: "Test creating retention filter",
        eventType: "session",
        query: "custom_query",
        sampleRate: 50,
        enabled: true,
      },
    },
  },
  appId: "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690",
};

apiInstance
  .createRetentionFilter(params)
  .then((data: v2.RumRetentionFilterResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PATCH https://api.ap1.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.datadoghq.eu/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.ddog-gov.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.us3.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.us5.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}

Información general

Update a RUM retention filter for a RUM application. Returns RUM retention filter objects from the request body when the request is successful.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

app_id [required]

string

RUM application ID.

rf_id [required]

string

Retention filter ID.

Solicitud

Body Data (required)

New definition of the RUM retention filter.

Expand All

Campo

Tipo

Descripción

data [required]

object

The new RUM retention filter properties to update.

attributes [required]

object

The object describing attributes of a RUM retention filter to update.

enabled

boolean

Whether the retention filter is enabled.

event_type

enum

The type of RUM events to filter on. Allowed enum values: session,view,action,error,resource,long_task,vital

name

string

The name of a RUM retention filter.

query

string

The query string for a RUM retention filter.

sample_rate

int64

The sample rate for a RUM retention filter, between 0 and 100.

id [required]

string

ID of retention filter in UUID.

type [required]

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": {
    "id": "4b95d361-f65d-4515-9824-c9aaeba5ac2a",
    "type": "retention_filters",
    "attributes": {
      "name": "Test updating retention filter",
      "event_type": "view",
      "query": "view_query",
      "sample_rate": 100,
      "enabled": true
    }
  }
}

Respuesta

Updated

The RUM retention filter object.

Expand All

Campo

Tipo

Descripción

data

object

The RUM retention filter.

attributes

object

The object describing attributes of a RUM retention filter.

enabled

boolean

Whether the retention filter is enabled.

event_type

enum

The type of RUM events to filter on. Allowed enum values: session,view,action,error,resource,long_task,vital

name

string

The name of a RUM retention filter.

query

string

The query string for a RUM retention filter.

sample_rate

int64

The sample rate for a RUM retention filter, between 0 and 100.

id

string

ID of retention filter in UUID.

type

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": {
    "attributes": {
      "enabled": true,
      "event_type": "session",
      "name": "Retention filter for session",
      "query": "@session.has_replay:true",
      "sample_rate": 25
    },
    "id": "051601eb-54a0-abc0-03f9-cc02efa18892",
    "type": "retention_filters"
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Authorized

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export app_id="CHANGE_ME"
export rf_id="CHANGE_ME"
# Curl command
curl -X PATCH "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/rum/applications/${app_id}/retention_filters/${rf_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": { "id": "4b95d361-f65d-4515-9824-c9aaeba5ac2a", "type": "retention_filters", "attributes": { "name": "Test updating retention filter", "event_type": "view", "query": "view_query", "sample_rate": 100, "enabled": true } } } EOF
// Update a RUM retention filter returns "Updated" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.RumRetentionFilterUpdateRequest{
		Data: datadogV2.RumRetentionFilterUpdateData{
			Id:   "4b95d361-f65d-4515-9824-c9aaeba5ac2a",
			Type: datadogV2.RUMRETENTIONFILTERTYPE_RETENTION_FILTERS,
			Attributes: datadogV2.RumRetentionFilterUpdateAttributes{
				Name:       datadog.PtrString("Test updating retention filter"),
				EventType:  datadogV2.RUMRETENTIONFILTEREVENTTYPE_VIEW.Ptr(),
				Query:      datadog.PtrString("view_query"),
				SampleRate: datadog.PtrInt64(100),
				Enabled:    datadog.PtrBool(true),
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewRumRetentionFiltersApi(apiClient)
	resp, r, err := api.UpdateRetentionFilter(ctx, "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "4b95d361-f65d-4515-9824-c9aaeba5ac2a", body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `RumRetentionFiltersApi.UpdateRetentionFilter`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `RumRetentionFiltersApi.UpdateRetentionFilter`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Update a RUM retention filter returns "Updated" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.RumRetentionFiltersApi;
import com.datadog.api.client.v2.model.RumRetentionFilterEventType;
import com.datadog.api.client.v2.model.RumRetentionFilterResponse;
import com.datadog.api.client.v2.model.RumRetentionFilterType;
import com.datadog.api.client.v2.model.RumRetentionFilterUpdateAttributes;
import com.datadog.api.client.v2.model.RumRetentionFilterUpdateData;
import com.datadog.api.client.v2.model.RumRetentionFilterUpdateRequest;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    RumRetentionFiltersApi apiInstance = new RumRetentionFiltersApi(defaultClient);

    RumRetentionFilterUpdateRequest body =
        new RumRetentionFilterUpdateRequest()
            .data(
                new RumRetentionFilterUpdateData()
                    .id("4b95d361-f65d-4515-9824-c9aaeba5ac2a")
                    .type(RumRetentionFilterType.RETENTION_FILTERS)
                    .attributes(
                        new RumRetentionFilterUpdateAttributes()
                            .name("Test updating retention filter")
                            .eventType(RumRetentionFilterEventType.VIEW)
                            .query("view_query")
                            .sampleRate(100L)
                            .enabled(true)));

    try {
      RumRetentionFilterResponse result =
          apiInstance.updateRetentionFilter(
              "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "4b95d361-f65d-4515-9824-c9aaeba5ac2a", body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling RumRetentionFiltersApi#updateRetentionFilter");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Update a RUM retention filter returns "Updated" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.rum_retention_filters_api import RumRetentionFiltersApi
from datadog_api_client.v2.model.rum_retention_filter_event_type import RumRetentionFilterEventType
from datadog_api_client.v2.model.rum_retention_filter_type import RumRetentionFilterType
from datadog_api_client.v2.model.rum_retention_filter_update_attributes import RumRetentionFilterUpdateAttributes
from datadog_api_client.v2.model.rum_retention_filter_update_data import RumRetentionFilterUpdateData
from datadog_api_client.v2.model.rum_retention_filter_update_request import RumRetentionFilterUpdateRequest

body = RumRetentionFilterUpdateRequest(
    data=RumRetentionFilterUpdateData(
        id="4b95d361-f65d-4515-9824-c9aaeba5ac2a",
        type=RumRetentionFilterType.RETENTION_FILTERS,
        attributes=RumRetentionFilterUpdateAttributes(
            name="Test updating retention filter",
            event_type=RumRetentionFilterEventType.VIEW,
            query="view_query",
            sample_rate=100,
            enabled=True,
        ),
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = RumRetentionFiltersApi(api_client)
    response = api_instance.update_retention_filter(
        app_id="a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", rf_id="4b95d361-f65d-4515-9824-c9aaeba5ac2a", body=body
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Update a RUM retention filter returns "Updated" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::RumRetentionFiltersAPI.new

body = DatadogAPIClient::V2::RumRetentionFilterUpdateRequest.new({
  data: DatadogAPIClient::V2::RumRetentionFilterUpdateData.new({
    id: "4b95d361-f65d-4515-9824-c9aaeba5ac2a",
    type: DatadogAPIClient::V2::RumRetentionFilterType::RETENTION_FILTERS,
    attributes: DatadogAPIClient::V2::RumRetentionFilterUpdateAttributes.new({
      name: "Test updating retention filter",
      event_type: DatadogAPIClient::V2::RumRetentionFilterEventType::VIEW,
      query: "view_query",
      sample_rate: 100,
      enabled: true,
    }),
  }),
})
p api_instance.update_retention_filter("a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "4b95d361-f65d-4515-9824-c9aaeba5ac2a", body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Update a RUM retention filter returns "Updated" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_rum_retention_filters::RumRetentionFiltersAPI;
use datadog_api_client::datadogV2::model::RumRetentionFilterEventType;
use datadog_api_client::datadogV2::model::RumRetentionFilterType;
use datadog_api_client::datadogV2::model::RumRetentionFilterUpdateAttributes;
use datadog_api_client::datadogV2::model::RumRetentionFilterUpdateData;
use datadog_api_client::datadogV2::model::RumRetentionFilterUpdateRequest;

#[tokio::main]
async fn main() {
    let body = RumRetentionFilterUpdateRequest::new(RumRetentionFilterUpdateData::new(
        RumRetentionFilterUpdateAttributes::new()
            .enabled(true)
            .event_type(RumRetentionFilterEventType::VIEW)
            .name("Test updating retention filter".to_string())
            .query("view_query".to_string())
            .sample_rate(100),
        "4b95d361-f65d-4515-9824-c9aaeba5ac2a".to_string(),
        RumRetentionFilterType::RETENTION_FILTERS,
    ));
    let configuration = datadog::Configuration::new();
    let api = RumRetentionFiltersAPI::with_config(configuration);
    let resp = api
        .update_retention_filter(
            "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690".to_string(),
            "4b95d361-f65d-4515-9824-c9aaeba5ac2a".to_string(),
            body,
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Update a RUM retention filter returns "Updated" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.RumRetentionFiltersApi(configuration);

const params: v2.RumRetentionFiltersApiUpdateRetentionFilterRequest = {
  body: {
    data: {
      id: "4b95d361-f65d-4515-9824-c9aaeba5ac2a",
      type: "retention_filters",
      attributes: {
        name: "Test updating retention filter",
        eventType: "view",
        query: "view_query",
        sampleRate: 100,
        enabled: true,
      },
    },
  },
  appId: "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690",
  rfId: "4b95d361-f65d-4515-9824-c9aaeba5ac2a",
};

apiInstance
  .updateRetentionFilter(params)
  .then((data: v2.RumRetentionFilterResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

DELETE https://api.ap1.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.datadoghq.eu/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.ddog-gov.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.us3.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}https://api.us5.datadoghq.com/api/v2/rum/applications/{app_id}/retention_filters/{rf_id}

Información general

Delete a RUM retention filter for a RUM application.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

app_id [required]

string

RUM application ID.

rf_id [required]

string

Retention filter ID.

Respuesta

No Content

Not Authorized

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export app_id="CHANGE_ME"
export rf_id="CHANGE_ME"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/rum/applications/${app_id}/retention_filters/${rf_id}" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Delete a RUM retention filter returns "No Content" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.rum_retention_filters_api import RumRetentionFiltersApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = RumRetentionFiltersApi(api_client)
    api_instance.delete_retention_filter(
        app_id="a33671aa-24fd-4dcd-ba4b-5bbdbafe7690",
        rf_id="fe34ee09-14cf-4976-9362-08044c0dea80",
    )

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Delete a RUM retention filter returns "No Content" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::RumRetentionFiltersAPI.new
api_instance.delete_retention_filter("a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "fe34ee09-14cf-4976-9362-08044c0dea80")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Delete a RUM retention filter returns "No Content" response

package main

import (
	"context"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewRumRetentionFiltersApi(apiClient)
	r, err := api.DeleteRetentionFilter(ctx, "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "fe34ee09-14cf-4976-9362-08044c0dea80")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `RumRetentionFiltersApi.DeleteRetentionFilter`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Delete a RUM retention filter returns "No Content" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.RumRetentionFiltersApi;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    RumRetentionFiltersApi apiInstance = new RumRetentionFiltersApi(defaultClient);

    try {
      apiInstance.deleteRetentionFilter(
          "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690", "fe34ee09-14cf-4976-9362-08044c0dea80");
    } catch (ApiException e) {
      System.err.println("Exception when calling RumRetentionFiltersApi#deleteRetentionFilter");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Delete a RUM retention filter returns "No Content" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_rum_retention_filters::RumRetentionFiltersAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = RumRetentionFiltersAPI::with_config(configuration);
    let resp = api
        .delete_retention_filter(
            "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690".to_string(),
            "fe34ee09-14cf-4976-9362-08044c0dea80".to_string(),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Delete a RUM retention filter returns "No Content" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.RumRetentionFiltersApi(configuration);

const params: v2.RumRetentionFiltersApiDeleteRetentionFilterRequest = {
  appId: "a33671aa-24fd-4dcd-ba4b-5bbdbafe7690",
  rfId: "fe34ee09-14cf-4976-9362-08044c0dea80",
};

apiInstance
  .deleteRetentionFilter(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PATCH https://api.ap1.datadoghq.com/api/v2/rum/applications/{app_id}/relationships/retention_filtershttps://api.datadoghq.eu/api/v2/rum/applications/{app_id}/relationships/retention_filtershttps://api.ddog-gov.com/api/v2/rum/applications/{app_id}/relationships/retention_filtershttps://api.datadoghq.com/api/v2/rum/applications/{app_id}/relationships/retention_filtershttps://api.us3.datadoghq.com/api/v2/rum/applications/{app_id}/relationships/retention_filtershttps://api.us5.datadoghq.com/api/v2/rum/applications/{app_id}/relationships/retention_filters

Información general

Order RUM retention filters for a RUM application. Returns RUM retention filter objects without attributes from the request body when the request is successful.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

app_id [required]

string

RUM application ID.

Solicitud

Body Data (required)

New definition of the RUM retention filter.

Expand All

Campo

Tipo

Descripción

data

[object]

A list of RUM retention filter IDs along with type.

id [required]

string

ID of retention filter in UUID.

type [required]

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": [
    {
      "type": "retention_filters",
      "id": "325631eb-94c9-49c0-93f9-ab7e4fd24529"
    },
    {
      "type": "retention_filters",
      "id": "42d89430-5b80-426e-a44b-ba3b417ece25"
    },
    {
      "type": "retention_filters",
      "id": "bff0bc34-99e9-4c16-adce-f47e71948c23"
    }
  ]
}

Respuesta

Ordered

The list of RUM retention filter IDs along with type.

Expand All

Campo

Tipo

Descripción

data

[object]

A list of RUM retention filter IDs along with type.

id [required]

string

ID of retention filter in UUID.

type [required]

enum

The type of the resource. The value should always be retention_filters. Allowed enum values: retention_filters

default: retention_filters

{
  "data": [
    {
      "id": "051601eb-54a0-abc0-03f9-cc02efa18892",
      "type": "retention_filters"
    }
  ]
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Authorized

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export app_id="CHANGE_ME"
# Curl command
curl -X PATCH "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/rum/applications/${app_id}/relationships/retention_filters" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": [ { "type": "retention_filters", "id": "325631eb-94c9-49c0-93f9-ab7e4fd24529" }, { "type": "retention_filters", "id": "42d89430-5b80-426e-a44b-ba3b417ece25" }, { "type": "retention_filters", "id": "bff0bc34-99e9-4c16-adce-f47e71948c23" } ] } EOF
// Order RUM retention filters returns "Ordered" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.RumRetentionFiltersOrderRequest{
		Data: []datadogV2.RumRetentionFiltersOrderData{
			{
				Type: datadogV2.RUMRETENTIONFILTERTYPE_RETENTION_FILTERS,
				Id:   "325631eb-94c9-49c0-93f9-ab7e4fd24529",
			},
			{
				Type: datadogV2.RUMRETENTIONFILTERTYPE_RETENTION_FILTERS,
				Id:   "42d89430-5b80-426e-a44b-ba3b417ece25",
			},
			{
				Type: datadogV2.RUMRETENTIONFILTERTYPE_RETENTION_FILTERS,
				Id:   "bff0bc34-99e9-4c16-adce-f47e71948c23",
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewRumRetentionFiltersApi(apiClient)
	resp, r, err := api.OrderRetentionFilters(ctx, "1d4b9c34-7ac4-423a-91cf-9902d926e9b3", body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `RumRetentionFiltersApi.OrderRetentionFilters`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `RumRetentionFiltersApi.OrderRetentionFilters`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Order RUM retention filters returns "Ordered" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.RumRetentionFiltersApi;
import com.datadog.api.client.v2.model.RumRetentionFilterType;
import com.datadog.api.client.v2.model.RumRetentionFiltersOrderData;
import com.datadog.api.client.v2.model.RumRetentionFiltersOrderRequest;
import com.datadog.api.client.v2.model.RumRetentionFiltersOrderResponse;
import java.util.Arrays;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    RumRetentionFiltersApi apiInstance = new RumRetentionFiltersApi(defaultClient);

    RumRetentionFiltersOrderRequest body =
        new RumRetentionFiltersOrderRequest()
            .data(
                Arrays.asList(
                    new RumRetentionFiltersOrderData()
                        .type(RumRetentionFilterType.RETENTION_FILTERS)
                        .id("325631eb-94c9-49c0-93f9-ab7e4fd24529"),
                    new RumRetentionFiltersOrderData()
                        .type(RumRetentionFilterType.RETENTION_FILTERS)
                        .id("42d89430-5b80-426e-a44b-ba3b417ece25"),
                    new RumRetentionFiltersOrderData()
                        .type(RumRetentionFilterType.RETENTION_FILTERS)
                        .id("bff0bc34-99e9-4c16-adce-f47e71948c23")));

    try {
      RumRetentionFiltersOrderResponse result =
          apiInstance.orderRetentionFilters("1d4b9c34-7ac4-423a-91cf-9902d926e9b3", body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling RumRetentionFiltersApi#orderRetentionFilters");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Order RUM retention filters returns "Ordered" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.rum_retention_filters_api import RumRetentionFiltersApi
from datadog_api_client.v2.model.rum_retention_filter_type import RumRetentionFilterType
from datadog_api_client.v2.model.rum_retention_filters_order_data import RumRetentionFiltersOrderData
from datadog_api_client.v2.model.rum_retention_filters_order_request import RumRetentionFiltersOrderRequest

body = RumRetentionFiltersOrderRequest(
    data=[
        RumRetentionFiltersOrderData(
            type=RumRetentionFilterType.RETENTION_FILTERS,
            id="325631eb-94c9-49c0-93f9-ab7e4fd24529",
        ),
        RumRetentionFiltersOrderData(
            type=RumRetentionFilterType.RETENTION_FILTERS,
            id="42d89430-5b80-426e-a44b-ba3b417ece25",
        ),
        RumRetentionFiltersOrderData(
            type=RumRetentionFilterType.RETENTION_FILTERS,
            id="bff0bc34-99e9-4c16-adce-f47e71948c23",
        ),
    ],
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = RumRetentionFiltersApi(api_client)
    response = api_instance.order_retention_filters(app_id="1d4b9c34-7ac4-423a-91cf-9902d926e9b3", body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Order RUM retention filters returns "Ordered" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V2::RumRetentionFiltersAPI.new

body = DatadogAPIClient::V2::RumRetentionFiltersOrderRequest.new({
  data: [
    DatadogAPIClient::V2::RumRetentionFiltersOrderData.new({
      type: DatadogAPIClient::V2::RumRetentionFilterType::RETENTION_FILTERS,
      id: "325631eb-94c9-49c0-93f9-ab7e4fd24529",
    }),
    DatadogAPIClient::V2::RumRetentionFiltersOrderData.new({
      type: DatadogAPIClient::V2::RumRetentionFilterType::RETENTION_FILTERS,
      id: "42d89430-5b80-426e-a44b-ba3b417ece25",
    }),
    DatadogAPIClient::V2::RumRetentionFiltersOrderData.new({
      type: DatadogAPIClient::V2::RumRetentionFilterType::RETENTION_FILTERS,
      id: "bff0bc34-99e9-4c16-adce-f47e71948c23",
    }),
  ],
})
p api_instance.order_retention_filters("1d4b9c34-7ac4-423a-91cf-9902d926e9b3", body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Order RUM retention filters returns "Ordered" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_rum_retention_filters::RumRetentionFiltersAPI;
use datadog_api_client::datadogV2::model::RumRetentionFilterType;
use datadog_api_client::datadogV2::model::RumRetentionFiltersOrderData;
use datadog_api_client::datadogV2::model::RumRetentionFiltersOrderRequest;

#[tokio::main]
async fn main() {
    let body = RumRetentionFiltersOrderRequest::new().data(vec![
        RumRetentionFiltersOrderData::new(
            "325631eb-94c9-49c0-93f9-ab7e4fd24529".to_string(),
            RumRetentionFilterType::RETENTION_FILTERS,
        ),
        RumRetentionFiltersOrderData::new(
            "42d89430-5b80-426e-a44b-ba3b417ece25".to_string(),
            RumRetentionFilterType::RETENTION_FILTERS,
        ),
        RumRetentionFiltersOrderData::new(
            "bff0bc34-99e9-4c16-adce-f47e71948c23".to_string(),
            RumRetentionFilterType::RETENTION_FILTERS,
        ),
    ]);
    let configuration = datadog::Configuration::new();
    let api = RumRetentionFiltersAPI::with_config(configuration);
    let resp = api
        .order_retention_filters("1d4b9c34-7ac4-423a-91cf-9902d926e9b3".to_string(), body)
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Order RUM retention filters returns "Ordered" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v2.RumRetentionFiltersApi(configuration);

const params: v2.RumRetentionFiltersApiOrderRetentionFiltersRequest = {
  body: {
    data: [
      {
        type: "retention_filters",
        id: "325631eb-94c9-49c0-93f9-ab7e4fd24529",
      },
      {
        type: "retention_filters",
        id: "42d89430-5b80-426e-a44b-ba3b417ece25",
      },
      {
        type: "retention_filters",
        id: "bff0bc34-99e9-4c16-adce-f47e71948c23",
      },
    ],
  },
  appId: "1d4b9c34-7ac4-423a-91cf-9902d926e9b3",
};

apiInstance
  .orderRetentionFilters(params)
  .then((data: v2.RumRetentionFiltersOrderResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers