This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Objetivos de nivel de servicio (SLOs)

Objetivos de nivel de servicio (SLOs) Los (SLOs) son una parte fundamental del conjunto de herramientas de ingeniería de fiabilidad del sitio. Los SLOs proporcionan un marco para definir objetivos claros en torno al rendimiento de las aplicaciones, lo que, en última instancia, ayuda a los equipos a ofrecer una experiencia coherente al cliente, a equilibrar el desarrollo de funciones con la estabilidad de la plataforma y a mejorar la comunicación con los usuarios internos y externos.

POST https://api.ap1.datadoghq.com/api/v1/slohttps://api.datadoghq.eu/api/v1/slohttps://api.ddog-gov.com/api/v1/slohttps://api.datadoghq.com/api/v1/slohttps://api.us3.datadoghq.com/api/v1/slohttps://api.us5.datadoghq.com/api/v1/slo

Información general

Crea un objeto objetivo de nivel servicio (SLO). This endpoint requires the slos_write permission.

OAuth apps require the slos_write authorization scope to access this endpoint.

Solicitud

Body Data (required)

Objeto de solicitud de objetivo de nivel de servicio.

Expand All

Campo

Tipo

Descripción

description

string

A user-defined description of the service level objective.

Always included in service level objective responses (but may be null). Optional in create/update requests.

groups

[string]

A list of (up to 100) monitor groups that narrow the scope of a monitor service level objective.

Included in service level objective responses if it is not empty. Optional in create/update requests for monitor service level objectives, but may only be used when then length of the monitor_ids field is one.

monitor_ids

[integer]

A list of monitor IDs that defines the scope of a monitor service level objective. Required if type is monitor.

name [required]

string

The name of the service level objective object.

query

object

A metric-based SLO. Required if type is metric. Note that Datadog only allows the sum by aggregator to be used because this will sum up all request counts instead of averaging them, or taking the max or min of all of those requests.

denominator [required]

string

A Datadog metric query for total (valid) events.

numerator [required]

string

A Datadog metric query for good events.

sli_specification

 <oneOf>

A generic SLI specification. This is currently used for time-slice SLOs only.

Option 1

object

A time-slice SLI specification.

time_slice [required]

object

The time-slice condition, composed of 3 parts: 1. the metric timeseries query, 2. the comparator, and 3. the threshold. Optionally, a fourth part, the query interval, can be provided.

comparator [required]

enum

The comparator used to compare the SLI value to the threshold. Allowed enum values: >,>=,<,<=

query [required]

object

The queries and formula used to calculate the SLI value.

formulas [required]

[object]

A list that contains exactly one formula, as only a single formula may be used in a time-slice SLO.

formula [required]

string

The formula string, which is an expression involving named queries.

queries [required]

[ <oneOf>]

A list of queries that are used to calculate the SLI value.

Option 1

object

A formula and functions metrics query.

aggregator

enum

The aggregation methods available for metrics queries. Allowed enum values: avg,min,max,sum,last,area,l2norm,percentile

cross_org_uuids

[string]

The source organization UUID for cross organization queries. Feature in Private Beta.

data_source [required]

enum

Data source for metrics queries. Allowed enum values: metrics

name [required]

string

Name of the query for use in formulas.

query [required]

string

Metrics query definition.

query_interval_seconds

enum

The interval used when querying data, which defines the size of a time slice. Two values are allowed: 60 (1 minute) and 300 (5 minutes). If not provided, the value defaults to 300 (5 minutes). Allowed enum values: 60,300

threshold [required]

double

The threshold value to which each SLI value will be compared.

tags

[string]

A list of tags associated with this service level objective. Always included in service level objective responses (but may be empty). Optional in create/update requests.

target_threshold

double

The target threshold such that when the service level indicator is above this threshold over the given timeframe, the objective is being met.

thresholds [required]

[object]

The thresholds (timeframes and associated targets) for this service level objective object.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

timeframe

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

type [required]

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

warning_threshold

double

The optional warning threshold such that when the service level indicator is below this value for the given threshold, but above the target threshold, the objective appears in a "warning" state. This value must be greater than the target threshold.

{
  "type": "time_slice",
  "description": "string",
  "name": "Example-Service-Level-Objective",
  "sli_specification": {
    "time_slice": {
      "query": {
        "formulas": [
          {
            "formula": "query1"
          }
        ],
        "queries": [
          {
            "data_source": "metrics",
            "name": "query1",
            "query": "trace.servlet.request{env:prod}"
          }
        ]
      },
      "comparator": ">",
      "threshold": 5
    }
  },
  "tags": [
    "env:prod"
  ],
  "thresholds": [
    {
      "target": 97.0,
      "target_display": "97.0",
      "timeframe": "7d",
      "warning": 98,
      "warning_display": "98.0"
    }
  ],
  "timeframe": "7d",
  "target_threshold": 97.0,
  "warning_threshold": 98
}
{
  "type": "metric",
  "description": "string",
  "groups": [
    "env:test",
    "role:mysql"
  ],
  "monitor_ids": [],
  "name": "Example-Service-Level-Objective",
  "query": {
    "denominator": "sum:httpservice.hits{!code:3xx}.as_count()",
    "numerator": "sum:httpservice.hits{code:2xx}.as_count()"
  },
  "tags": [
    "env:prod",
    "app:core"
  ],
  "thresholds": [
    {
      "target": 97.0,
      "target_display": "97.0",
      "timeframe": "7d",
      "warning": 98,
      "warning_display": "98.0"
    }
  ],
  "timeframe": "7d",
  "target_threshold": 97.0,
  "warning_threshold": 98
}

Respuesta

OK

A response with one or more service level objective.

Expand All

Campo

Tipo

Descripción

data

[object]

An array of service level objective objects.

created_at

int64

Creation timestamp (UNIX time in seconds)

Always included in service level objective responses.

creator

object

Object describing the creator of the shared element.

email

string

Email of the creator.

handle

string

Handle of the creator.

name

string

Name of the creator.

description

string

A user-defined description of the service level objective.

Always included in service level objective responses (but may be null). Optional in create/update requests.

groups

[string]

A list of (up to 100) monitor groups that narrow the scope of a monitor service level objective.

Included in service level objective responses if it is not empty. Optional in create/update requests for monitor service level objectives, but may only be used when then length of the monitor_ids field is one.

id

string

A unique identifier for the service level objective object.

Always included in service level objective responses.

modified_at

int64

Modification timestamp (UNIX time in seconds)

Always included in service level objective responses.

monitor_ids

[integer]

A list of monitor ids that defines the scope of a monitor service level objective. Required if type is monitor.

monitor_tags

[string]

The union of monitor tags for all monitors referenced by the monitor_ids field. Always included in service level objective responses for monitor-based service level objectives (but may be empty). Ignored in create/update requests. Does not affect which monitors are included in the service level objective (that is determined entirely by the monitor_ids field).

name [required]

string

The name of the service level objective object.

query

object

A metric-based SLO. Required if type is metric. Note that Datadog only allows the sum by aggregator to be used because this will sum up all request counts instead of averaging them, or taking the max or min of all of those requests.

denominator [required]

string

A Datadog metric query for total (valid) events.

numerator [required]

string

A Datadog metric query for good events.

sli_specification

 <oneOf>

A generic SLI specification. This is currently used for time-slice SLOs only.

Option 1

object

A time-slice SLI specification.

time_slice [required]

object

The time-slice condition, composed of 3 parts: 1. the metric timeseries query, 2. the comparator, and 3. the threshold. Optionally, a fourth part, the query interval, can be provided.

comparator [required]

enum

The comparator used to compare the SLI value to the threshold. Allowed enum values: >,>=,<,<=

query [required]

object

The queries and formula used to calculate the SLI value.

formulas [required]

[object]

A list that contains exactly one formula, as only a single formula may be used in a time-slice SLO.

formula [required]

string

The formula string, which is an expression involving named queries.

queries [required]

[ <oneOf>]

A list of queries that are used to calculate the SLI value.

Option 1

object

A formula and functions metrics query.

aggregator

enum

The aggregation methods available for metrics queries. Allowed enum values: avg,min,max,sum,last,area,l2norm,percentile

cross_org_uuids

[string]

The source organization UUID for cross organization queries. Feature in Private Beta.

data_source [required]

enum

Data source for metrics queries. Allowed enum values: metrics

name [required]

string

Name of the query for use in formulas.

query [required]

string

Metrics query definition.

query_interval_seconds

enum

The interval used when querying data, which defines the size of a time slice. Two values are allowed: 60 (1 minute) and 300 (5 minutes). If not provided, the value defaults to 300 (5 minutes). Allowed enum values: 60,300

threshold [required]

double

The threshold value to which each SLI value will be compared.

tags

[string]

A list of tags associated with this service level objective. Always included in service level objective responses (but may be empty). Optional in create/update requests.

target_threshold

double

The target threshold such that when the service level indicator is above this threshold over the given timeframe, the objective is being met.

thresholds [required]

[object]

The thresholds (timeframes and associated targets) for this service level objective object.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

timeframe

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

type [required]

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

warning_threshold

double

The optional warning threshold such that when the service level indicator is below this value for the given threshold, but above the target threshold, the objective appears in a "warning" state. This value must be greater than the target threshold.

errors

[string]

An array of error messages. Each endpoint documents how/whether this field is used.

metadata

object

The metadata object containing additional information about the list of SLOs.

page

object

The object containing information about the pages of the list of SLOs.

total_count

int64

The total number of resources that could be retrieved ignoring the parameters and filters in the request.

total_filtered_count

int64

The total number of resources that match the parameters and filters in the request. This attribute can be used by a client to determine the total number of pages.

{
  "data": [
    {
      "created_at": "integer",
      "creator": {
        "email": "string",
        "handle": "string",
        "name": "string"
      },
      "description": "string",
      "groups": [
        "env:prod",
        "role:mysql"
      ],
      "id": "string",
      "modified_at": "integer",
      "monitor_ids": [],
      "monitor_tags": [],
      "name": "Custom Metric SLO",
      "query": {
        "denominator": "sum:my.custom.metric{*}.as_count()",
        "numerator": "sum:my.custom.metric{type:good}.as_count()"
      },
      "sli_specification": {
        "time_slice": {
          "comparator": ">",
          "query": {
            "formulas": [
              {
                "formula": "query1 - default_zero(query2)"
              }
            ],
            "queries": [
              []
            ]
          },
          "query_interval_seconds": 300,
          "threshold": 5
        }
      },
      "tags": [
        "env:prod",
        "app:core"
      ],
      "target_threshold": 99.9,
      "thresholds": [
        {
          "target": 99.9,
          "target_display": "99.9",
          "timeframe": "30d",
          "warning": 90,
          "warning_display": "90.0"
        }
      ],
      "timeframe": "30d",
      "type": "metric",
      "warning_threshold": 99.95
    }
  ],
  "errors": [],
  "metadata": {
    "page": {
      "total_count": "integer",
      "total_filtered_count": "integer"
    }
  }
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "type": "time_slice", "description": "string", "name": "Example-Service-Level-Objective", "sli_specification": { "time_slice": { "query": { "formulas": [ { "formula": "query1" } ], "queries": [ { "data_source": "metrics", "name": "query1", "query": "trace.servlet.request{env:prod}" } ] }, "comparator": ">", "threshold": 5 } }, "tags": [ "env:prod" ], "thresholds": [ { "target": 97.0, "target_display": "97.0", "timeframe": "7d", "warning": 98, "warning_display": "98.0" } ], "timeframe": "7d", "target_threshold": 97.0, "warning_threshold": 98 } EOF
                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "type": "metric", "description": "string", "groups": [ "env:test", "role:mysql" ], "monitor_ids": [], "name": "Example-Service-Level-Objective", "query": { "denominator": "sum:httpservice.hits{!code:3xx}.as_count()", "numerator": "sum:httpservice.hits{code:2xx}.as_count()" }, "tags": [ "env:prod", "app:core" ], "thresholds": [ { "target": 97.0, "target_display": "97.0", "timeframe": "7d", "warning": 98, "warning_display": "98.0" } ], "timeframe": "7d", "target_threshold": 97.0, "warning_threshold": 98 } EOF
// Create a time-slice SLO object returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	body := datadogV1.ServiceLevelObjectiveRequest{
		Type:        datadogV1.SLOTYPE_TIME_SLICE,
		Description: *datadog.NewNullableString(datadog.PtrString("string")),
		Name:        "Example-Service-Level-Objective",
		SliSpecification: &datadogV1.SLOSliSpec{
			SLOTimeSliceSpec: &datadogV1.SLOTimeSliceSpec{
				TimeSlice: datadogV1.SLOTimeSliceCondition{
					Query: datadogV1.SLOTimeSliceQuery{
						Formulas: []datadogV1.SLOFormula{
							{
								Formula: "query1",
							},
						},
						Queries: []datadogV1.SLODataSourceQueryDefinition{
							datadogV1.SLODataSourceQueryDefinition{
								FormulaAndFunctionMetricQueryDefinition: &datadogV1.FormulaAndFunctionMetricQueryDefinition{
									DataSource: datadogV1.FORMULAANDFUNCTIONMETRICDATASOURCE_METRICS,
									Name:       "query1",
									Query:      "trace.servlet.request{env:prod}",
								}},
						},
					},
					Comparator: datadogV1.SLOTIMESLICECOMPARATOR_GREATER,
					Threshold:  5,
				},
			}},
		Tags: []string{
			"env:prod",
		},
		Thresholds: []datadogV1.SLOThreshold{
			{
				Target:         97.0,
				TargetDisplay:  datadog.PtrString("97.0"),
				Timeframe:      datadogV1.SLOTIMEFRAME_SEVEN_DAYS,
				Warning:        datadog.PtrFloat64(98),
				WarningDisplay: datadog.PtrString("98.0"),
			},
		},
		Timeframe:        datadogV1.SLOTIMEFRAME_SEVEN_DAYS.Ptr(),
		TargetThreshold:  datadog.PtrFloat64(97.0),
		WarningThreshold: datadog.PtrFloat64(98),
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.CreateSLO(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.CreateSLO`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.CreateSLO`:\n%s\n", responseContent)
}
// Create an SLO object returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	body := datadogV1.ServiceLevelObjectiveRequest{
		Type:        datadogV1.SLOTYPE_METRIC,
		Description: *datadog.NewNullableString(datadog.PtrString("string")),
		Groups: []string{
			"env:test",
			"role:mysql",
		},
		MonitorIds: []int64{},
		Name:       "Example-Service-Level-Objective",
		Query: &datadogV1.ServiceLevelObjectiveQuery{
			Denominator: "sum:httpservice.hits{!code:3xx}.as_count()",
			Numerator:   "sum:httpservice.hits{code:2xx}.as_count()",
		},
		Tags: []string{
			"env:prod",
			"app:core",
		},
		Thresholds: []datadogV1.SLOThreshold{
			{
				Target:         97.0,
				TargetDisplay:  datadog.PtrString("97.0"),
				Timeframe:      datadogV1.SLOTIMEFRAME_SEVEN_DAYS,
				Warning:        datadog.PtrFloat64(98),
				WarningDisplay: datadog.PtrString("98.0"),
			},
		},
		Timeframe:        datadogV1.SLOTIMEFRAME_SEVEN_DAYS.Ptr(),
		TargetThreshold:  datadog.PtrFloat64(97.0),
		WarningThreshold: datadog.PtrFloat64(98),
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.CreateSLO(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.CreateSLO`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.CreateSLO`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Create a time-slice SLO object returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.FormulaAndFunctionMetricDataSource;
import com.datadog.api.client.v1.model.FormulaAndFunctionMetricQueryDefinition;
import com.datadog.api.client.v1.model.SLODataSourceQueryDefinition;
import com.datadog.api.client.v1.model.SLOFormula;
import com.datadog.api.client.v1.model.SLOListResponse;
import com.datadog.api.client.v1.model.SLOSliSpec;
import com.datadog.api.client.v1.model.SLOThreshold;
import com.datadog.api.client.v1.model.SLOTimeSliceComparator;
import com.datadog.api.client.v1.model.SLOTimeSliceCondition;
import com.datadog.api.client.v1.model.SLOTimeSliceQuery;
import com.datadog.api.client.v1.model.SLOTimeSliceSpec;
import com.datadog.api.client.v1.model.SLOTimeframe;
import com.datadog.api.client.v1.model.SLOType;
import com.datadog.api.client.v1.model.ServiceLevelObjectiveRequest;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    ServiceLevelObjectiveRequest body =
        new ServiceLevelObjectiveRequest()
            .type(SLOType.TIME_SLICE)
            .description("string")
            .name("Example-Service-Level-Objective")
            .sliSpecification(
                new SLOSliSpec(
                    new SLOTimeSliceSpec()
                        .timeSlice(
                            new SLOTimeSliceCondition()
                                .query(
                                    new SLOTimeSliceQuery()
                                        .formulas(
                                            Collections.singletonList(
                                                new SLOFormula().formula("query1")))
                                        .queries(
                                            Collections.singletonList(
                                                new SLODataSourceQueryDefinition(
                                                    new FormulaAndFunctionMetricQueryDefinition()
                                                        .dataSource(
                                                            FormulaAndFunctionMetricDataSource
                                                                .METRICS)
                                                        .name("query1")
                                                        .query(
                                                            "trace.servlet.request{env:prod}")))))
                                .comparator(SLOTimeSliceComparator.GREATER)
                                .threshold(5.0))))
            .tags(Collections.singletonList("env:prod"))
            .thresholds(
                Collections.singletonList(
                    new SLOThreshold()
                        .target(97.0)
                        .targetDisplay("97.0")
                        .timeframe(SLOTimeframe.SEVEN_DAYS)
                        .warning(98.0)
                        .warningDisplay("98.0")))
            .timeframe(SLOTimeframe.SEVEN_DAYS)
            .targetThreshold(97.0)
            .warningThreshold(98.0);

    try {
      SLOListResponse result = apiInstance.createSLO(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#createSLO");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}
// Create an SLO object returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.SLOListResponse;
import com.datadog.api.client.v1.model.SLOThreshold;
import com.datadog.api.client.v1.model.SLOTimeframe;
import com.datadog.api.client.v1.model.SLOType;
import com.datadog.api.client.v1.model.ServiceLevelObjectiveQuery;
import com.datadog.api.client.v1.model.ServiceLevelObjectiveRequest;
import java.util.Arrays;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    ServiceLevelObjectiveRequest body =
        new ServiceLevelObjectiveRequest()
            .type(SLOType.METRIC)
            .description("string")
            .groups(Arrays.asList("env:test", "role:mysql"))
            .name("Example-Service-Level-Objective")
            .query(
                new ServiceLevelObjectiveQuery()
                    .denominator("sum:httpservice.hits{!code:3xx}.as_count()")
                    .numerator("sum:httpservice.hits{code:2xx}.as_count()"))
            .tags(Arrays.asList("env:prod", "app:core"))
            .thresholds(
                Collections.singletonList(
                    new SLOThreshold()
                        .target(97.0)
                        .targetDisplay("97.0")
                        .timeframe(SLOTimeframe.SEVEN_DAYS)
                        .warning(98.0)
                        .warningDisplay("98.0")))
            .timeframe(SLOTimeframe.SEVEN_DAYS)
            .targetThreshold(97.0)
            .warningThreshold(98.0);

    try {
      SLOListResponse result = apiInstance.createSLO(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#createSLO");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

initialize(**options)

# Create a new SLO
thresholds = [
  {"timeframe": "7d", "target": 95},
  {"timeframe": "30d", "target": 95, "warning": 97},
]
tags = ["app:webserver", "frontend"]
api.ServiceLevelObjective.create(
    type="metric",
    name="Custom Metric SLO",
    description="SLO tracking custom service SLO",
    query={
        "numerator": "sum:my.custom.metric{type:good}.as_count()",
        "denominator": "sum:my.custom.metric{*}.as_count()"
    },
    tags=tags,
    thresholds=thresholds
)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
"""
Create a time-slice SLO object returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi
from datadog_api_client.v1.model.formula_and_function_metric_data_source import FormulaAndFunctionMetricDataSource
from datadog_api_client.v1.model.formula_and_function_metric_query_definition import (
    FormulaAndFunctionMetricQueryDefinition,
)
from datadog_api_client.v1.model.service_level_objective_request import ServiceLevelObjectiveRequest
from datadog_api_client.v1.model.slo_formula import SLOFormula
from datadog_api_client.v1.model.slo_threshold import SLOThreshold
from datadog_api_client.v1.model.slo_time_slice_comparator import SLOTimeSliceComparator
from datadog_api_client.v1.model.slo_time_slice_condition import SLOTimeSliceCondition
from datadog_api_client.v1.model.slo_time_slice_query import SLOTimeSliceQuery
from datadog_api_client.v1.model.slo_time_slice_spec import SLOTimeSliceSpec
from datadog_api_client.v1.model.slo_timeframe import SLOTimeframe
from datadog_api_client.v1.model.slo_type import SLOType

body = ServiceLevelObjectiveRequest(
    type=SLOType.TIME_SLICE,
    description="string",
    name="Example-Service-Level-Objective",
    sli_specification=SLOTimeSliceSpec(
        time_slice=SLOTimeSliceCondition(
            query=SLOTimeSliceQuery(
                formulas=[
                    SLOFormula(
                        formula="query1",
                    ),
                ],
                queries=[
                    FormulaAndFunctionMetricQueryDefinition(
                        data_source=FormulaAndFunctionMetricDataSource.METRICS,
                        name="query1",
                        query="trace.servlet.request{env:prod}",
                    ),
                ],
            ),
            comparator=SLOTimeSliceComparator.GREATER,
            threshold=5.0,
        ),
    ),
    tags=[
        "env:prod",
    ],
    thresholds=[
        SLOThreshold(
            target=97.0,
            target_display="97.0",
            timeframe=SLOTimeframe.SEVEN_DAYS,
            warning=98.0,
            warning_display="98.0",
        ),
    ],
    timeframe=SLOTimeframe.SEVEN_DAYS,
    target_threshold=97.0,
    warning_threshold=98.0,
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.create_slo(body=body)

    print(response)
"""
Create an SLO object returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi
from datadog_api_client.v1.model.service_level_objective_query import ServiceLevelObjectiveQuery
from datadog_api_client.v1.model.service_level_objective_request import ServiceLevelObjectiveRequest
from datadog_api_client.v1.model.slo_threshold import SLOThreshold
from datadog_api_client.v1.model.slo_timeframe import SLOTimeframe
from datadog_api_client.v1.model.slo_type import SLOType

body = ServiceLevelObjectiveRequest(
    type=SLOType.METRIC,
    description="string",
    groups=[
        "env:test",
        "role:mysql",
    ],
    monitor_ids=[],
    name="Example-Service-Level-Objective",
    query=ServiceLevelObjectiveQuery(
        denominator="sum:httpservice.hits{!code:3xx}.as_count()",
        numerator="sum:httpservice.hits{code:2xx}.as_count()",
    ),
    tags=[
        "env:prod",
        "app:core",
    ],
    thresholds=[
        SLOThreshold(
            target=97.0,
            target_display="97.0",
            timeframe=SLOTimeframe.SEVEN_DAYS,
            warning=98.0,
            warning_display="98.0",
        ),
    ],
    timeframe=SLOTimeframe.SEVEN_DAYS,
    target_threshold=97.0,
    warning_threshold=98.0,
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.create_slo(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
require 'dogapi'

api_key = '<DATADOG_API_KEY>'
app_key = '<DATADOG_APPLICATION_KEY>'

dog = Dogapi::Client.new(api_key, app_key)

# Create a new SLO
thresholds = [
  { timeframe: '7d', target: 95 },
  { timeframe: '30d', target: 95, warning: 97 }
]
tags = ['app:webserver', 'frontend']
dog.create_service_level_objective(
  type: 'metric',
  name: 'Custom Metric SLO',
  description: 'SLO tracking custom service SLO',
  numerator: 'sum:my.custom.metric{type:good}.as_count()',
  denominator: 'sum:my.custom.metric{*}.as_count()',
  tags: tags,
  thresholds: thresholds
)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
# Create a time-slice SLO object returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

body = DatadogAPIClient::V1::ServiceLevelObjectiveRequest.new({
  type: DatadogAPIClient::V1::SLOType::TIME_SLICE,
  description: "string",
  name: "Example-Service-Level-Objective",
  sli_specification: DatadogAPIClient::V1::SLOTimeSliceSpec.new({
    time_slice: DatadogAPIClient::V1::SLOTimeSliceCondition.new({
      query: DatadogAPIClient::V1::SLOTimeSliceQuery.new({
        formulas: [
          DatadogAPIClient::V1::SLOFormula.new({
            formula: "query1",
          }),
        ],
        queries: [
          DatadogAPIClient::V1::FormulaAndFunctionMetricQueryDefinition.new({
            data_source: DatadogAPIClient::V1::FormulaAndFunctionMetricDataSource::METRICS,
            name: "query1",
            query: "trace.servlet.request{env:prod}",
          }),
        ],
      }),
      comparator: DatadogAPIClient::V1::SLOTimeSliceComparator::GREATER,
      threshold: 5,
    }),
  }),
  tags: [
    "env:prod",
  ],
  thresholds: [
    DatadogAPIClient::V1::SLOThreshold.new({
      target: 97.0,
      target_display: "97.0",
      timeframe: DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
      warning: 98,
      warning_display: "98.0",
    }),
  ],
  timeframe: DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
  target_threshold: 97.0,
  warning_threshold: 98,
})
p api_instance.create_slo(body)
# Create an SLO object returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

body = DatadogAPIClient::V1::ServiceLevelObjectiveRequest.new({
  type: DatadogAPIClient::V1::SLOType::METRIC,
  description: "string",
  groups: [
    "env:test",
    "role:mysql",
  ],
  monitor_ids: [],
  name: "Example-Service-Level-Objective",
  query: DatadogAPIClient::V1::ServiceLevelObjectiveQuery.new({
    denominator: "sum:httpservice.hits{!code:3xx}.as_count()",
    numerator: "sum:httpservice.hits{code:2xx}.as_count()",
  }),
  tags: [
    "env:prod",
    "app:core",
  ],
  thresholds: [
    DatadogAPIClient::V1::SLOThreshold.new({
      target: 97.0,
      target_display: "97.0",
      timeframe: DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
      warning: 98,
      warning_display: "98.0",
    }),
  ],
  timeframe: DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
  target_threshold: 97.0,
  warning_threshold: 98,
})
p api_instance.create_slo(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Create a time-slice SLO object returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;
use datadog_api_client::datadogV1::model::FormulaAndFunctionMetricDataSource;
use datadog_api_client::datadogV1::model::FormulaAndFunctionMetricQueryDefinition;
use datadog_api_client::datadogV1::model::SLODataSourceQueryDefinition;
use datadog_api_client::datadogV1::model::SLOFormula;
use datadog_api_client::datadogV1::model::SLOSliSpec;
use datadog_api_client::datadogV1::model::SLOThreshold;
use datadog_api_client::datadogV1::model::SLOTimeSliceComparator;
use datadog_api_client::datadogV1::model::SLOTimeSliceCondition;
use datadog_api_client::datadogV1::model::SLOTimeSliceQuery;
use datadog_api_client::datadogV1::model::SLOTimeSliceSpec;
use datadog_api_client::datadogV1::model::SLOTimeframe;
use datadog_api_client::datadogV1::model::SLOType;
use datadog_api_client::datadogV1::model::ServiceLevelObjectiveRequest;

#[tokio::main]
async fn main() {
    let body = ServiceLevelObjectiveRequest::new(
        "Example-Service-Level-Objective".to_string(),
        vec![SLOThreshold::new(97.0, SLOTimeframe::SEVEN_DAYS)
            .target_display("97.0".to_string())
            .warning(98.0 as f64)
            .warning_display("98.0".to_string())],
        SLOType::TIME_SLICE,
    )
    .description(Some("string".to_string()))
    .sli_specification(SLOSliSpec::SLOTimeSliceSpec(Box::new(
        SLOTimeSliceSpec::new(SLOTimeSliceCondition::new(
            SLOTimeSliceComparator::GREATER,
            SLOTimeSliceQuery::new(
                vec![SLOFormula::new("query1".to_string())],
                vec![
                    SLODataSourceQueryDefinition::FormulaAndFunctionMetricQueryDefinition(
                        Box::new(FormulaAndFunctionMetricQueryDefinition::new(
                            FormulaAndFunctionMetricDataSource::METRICS,
                            "query1".to_string(),
                            "trace.servlet.request{env:prod}".to_string(),
                        )),
                    ),
                ],
            ),
            5.0,
        )),
    )))
    .tags(vec!["env:prod".to_string()])
    .target_threshold(97.0 as f64)
    .timeframe(SLOTimeframe::SEVEN_DAYS)
    .warning_threshold(98.0 as f64);
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.create_slo(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}
// Create an SLO object returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;
use datadog_api_client::datadogV1::model::SLOThreshold;
use datadog_api_client::datadogV1::model::SLOTimeframe;
use datadog_api_client::datadogV1::model::SLOType;
use datadog_api_client::datadogV1::model::ServiceLevelObjectiveQuery;
use datadog_api_client::datadogV1::model::ServiceLevelObjectiveRequest;

#[tokio::main]
async fn main() {
    let body = ServiceLevelObjectiveRequest::new(
        "Example-Service-Level-Objective".to_string(),
        vec![SLOThreshold::new(97.0, SLOTimeframe::SEVEN_DAYS)
            .target_display("97.0".to_string())
            .warning(98.0 as f64)
            .warning_display("98.0".to_string())],
        SLOType::METRIC,
    )
    .description(Some("string".to_string()))
    .groups(vec!["env:test".to_string(), "role:mysql".to_string()])
    .monitor_ids(vec![])
    .query(ServiceLevelObjectiveQuery::new(
        "sum:httpservice.hits{!code:3xx}.as_count()".to_string(),
        "sum:httpservice.hits{code:2xx}.as_count()".to_string(),
    ))
    .tags(vec!["env:prod".to_string(), "app:core".to_string()])
    .target_threshold(97.0 as f64)
    .timeframe(SLOTimeframe::SEVEN_DAYS)
    .warning_threshold(98.0 as f64);
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.create_slo(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Create a time-slice SLO object returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

const params: v1.ServiceLevelObjectivesApiCreateSLORequest = {
  body: {
    type: "time_slice",
    description: "string",
    name: "Example-Service-Level-Objective",
    sliSpecification: {
      timeSlice: {
        query: {
          formulas: [
            {
              formula: "query1",
            },
          ],
          queries: [
            {
              dataSource: "metrics",
              name: "query1",
              query: "trace.servlet.request{env:prod}",
            },
          ],
        },
        comparator: ">",
        threshold: 5,
      },
    },
    tags: ["env:prod"],
    thresholds: [
      {
        target: 97.0,
        targetDisplay: "97.0",
        timeframe: "7d",
        warning: 98,
        warningDisplay: "98.0",
      },
    ],
    timeframe: "7d",
    targetThreshold: 97.0,
    warningThreshold: 98,
  },
};

apiInstance
  .createSLO(params)
  .then((data: v1.SLOListResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));
/**
 * Create an SLO object returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

const params: v1.ServiceLevelObjectivesApiCreateSLORequest = {
  body: {
    type: "metric",
    description: "string",
    groups: ["env:test", "role:mysql"],
    monitorIds: [],
    name: "Example-Service-Level-Objective",
    query: {
      denominator: "sum:httpservice.hits{!code:3xx}.as_count()",
      numerator: "sum:httpservice.hits{code:2xx}.as_count()",
    },
    tags: ["env:prod", "app:core"],
    thresholds: [
      {
        target: 97.0,
        targetDisplay: "97.0",
        timeframe: "7d",
        warning: 98,
        warningDisplay: "98.0",
      },
    ],
    timeframe: "7d",
    targetThreshold: 97.0,
    warningThreshold: 98,
  },
};

apiInstance
  .createSLO(params)
  .then((data: v1.SLOListResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/slo/searchhttps://api.datadoghq.eu/api/v1/slo/searchhttps://api.ddog-gov.com/api/v1/slo/searchhttps://api.datadoghq.com/api/v1/slo/searchhttps://api.us3.datadoghq.com/api/v1/slo/searchhttps://api.us5.datadoghq.com/api/v1/slo/search

Información general

Obtén una lista de objetos de objetivos de nivel servicio para tu organización. This endpoint requires the slos_read permission.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Cadenas de consulta

Nombre

Tipo

Descripción

query

string

The query string to filter results based on SLO names. Some examples of queries include service:<service-name> and <slo-name>.

page[size]

integer

The number of files to return in the response [default=10].

page[number]

integer

The identifier of the first page to return. This parameter is used for the pagination feature [default=0].

include_facets

boolean

Whether or not to return facet information in the response [default=false].

Respuesta

OK

A search SLO response containing results from the search query.

Expand All

Campo

Tipo

Descripción

data

object

Data from search SLO response.

attributes

object

Attributes

facets

object

Facets

all_tags

[object]

All tags associated with an SLO.

count

int64

Count

name

string

Facet

creator_name

[object]

Creator of an SLO.

count

int64

Count

name

string

Facet

env_tags

[object]

Tags with the env tag key.

count

int64

Count

name

string

Facet

service_tags

[object]

Tags with the service tag key.

count

int64

Count

name

string

Facet

slo_type

[object]

Type of SLO.

count

int64

Count

name

double

Facet

target

[object]

SLO Target

count

int64

Count

name

double

Facet

team_tags

[object]

Tags with the team tag key.

count

int64

Count

name

string

Facet

timeframe

[object]

Timeframes of SLOs.

count

int64

Count

name

string

Facet

slos

[object]

SLOs

data

object

A service level objective ID and attributes.

attributes

object

A service level objective object includes a service level indicator, thresholds for one or more timeframes, and metadata (name, description, and tags).

all_tags

[string]

A list of tags associated with this service level objective. Always included in service level objective responses (but may be empty).

created_at

int64

Creation timestamp (UNIX time in seconds)

Always included in service level objective responses.

creator

object

The creator of the SLO

email

string

Email of the creator.

id

int64

User ID of the creator.

name

string

Name of the creator.

description

string

A user-defined description of the service level objective.

Always included in service level objective responses (but may be null). Optional in create/update requests.

env_tags

[string]

Tags with the env tag key.

groups

[string]

A list of (up to 100) monitor groups that narrow the scope of a monitor service level objective. Included in service level objective responses if it is not empty.

modified_at

int64

Modification timestamp (UNIX time in seconds)

Always included in service level objective responses.

monitor_ids

[integer]

A list of monitor ids that defines the scope of a monitor service level objective.

name

string

The name of the service level objective object.

overall_status

[object]

calculated status and error budget remaining.

error

string

Error message if SLO status or error budget could not be calculated.

error_budget_remaining

double

Remaining error budget of the SLO in percentage.

indexed_at

int64

timestamp (UNIX time in seconds) of when the SLO status and error budget were calculated.

raw_error_budget_remaining

object

Error budget remaining for an SLO.

unit

string

Error budget remaining unit.

value

double

Error budget remaining value.

span_precision

int64

The amount of decimal places the SLI value is accurate to.

state

enum

State of the SLO. Allowed enum values: breached,warning,ok,no_data

status

double

The status of the SLO.

target

double

The target of the SLO.

timeframe

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

query

object

A metric-based SLO. Required if type is metric. Note that Datadog only allows the sum by aggregator to be used because this will sum up all request counts instead of averaging them, or taking the max or min of all of those requests.

denominator

string

A Datadog metric query for total (valid) events.

metrics

[string]

Metric names used in the query's numerator and denominator. This field will return null and will be implemented in the next version of this endpoint.

numerator

string

A Datadog metric query for good events.

service_tags

[string]

Tags with the service tag key.

slo_type

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

status

object

Status of the SLO's primary timeframe.

calculation_error

string

Error message if SLO status or error budget could not be calculated.

error_budget_remaining

double

Remaining error budget of the SLO in percentage.

indexed_at

int64

timestamp (UNIX time in seconds) of when the SLO status and error budget were calculated.

raw_error_budget_remaining

object

Error budget remaining for an SLO.

unit

string

Error budget remaining unit.

value

double

Error budget remaining value.

sli

double

The current service level indicator (SLI) of the SLO, also known as 'status'. This is a percentage value from 0-100 (inclusive).

span_precision

int64

The number of decimal places the SLI value is accurate to.

state

enum

State of the SLO. Allowed enum values: breached,warning,ok,no_data

team_tags

[string]

Tags with the team tag key.

thresholds

[object]

The thresholds (timeframes and associated targets) for this service level objective object.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Allowed enum values: 7d,30d,90d

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

id

string

A unique identifier for the service level objective object.

Always included in service level objective responses.

type

string

The type of the object, must be slo.

type

string

Type of service level objective result.

links

object

Pagination links.

first

string

Link to last page.

last

string

Link to first page.

next

string

Link to the next page.

prev

string

Link to previous page.

self

string

Link to current page.

meta

object

Searches metadata returned by the API.

pagination

object

Pagination metadata returned by the API.

first_number

int64

The first number.

last_number

int64

The last number.

next_number

int64

The next number.

number

int64

The page number.

prev_number

int64

The previous page number.

size

int64

The size of the response.

total

int64

The total number of SLOs in the response.

type

string

Type of pagination.

{
  "data": {
    "attributes": {
      "facets": {
        "all_tags": [
          {
            "count": "integer",
            "name": "string"
          }
        ],
        "creator_name": [
          {
            "count": "integer",
            "name": "string"
          }
        ],
        "env_tags": [
          {
            "count": "integer",
            "name": "string"
          }
        ],
        "service_tags": [
          {
            "count": "integer",
            "name": "string"
          }
        ],
        "slo_type": [
          {
            "count": "integer",
            "name": "number"
          }
        ],
        "target": [
          {
            "count": "integer",
            "name": "number"
          }
        ],
        "team_tags": [
          {
            "count": "integer",
            "name": "string"
          }
        ],
        "timeframe": [
          {
            "count": "integer",
            "name": "string"
          }
        ]
      },
      "slos": [
        {
          "data": {
            "attributes": {
              "all_tags": [
                "env:prod",
                "app:core"
              ],
              "created_at": "integer",
              "creator": {
                "email": "string",
                "id": "integer",
                "name": "string"
              },
              "description": "string",
              "env_tags": [],
              "groups": [
                "env:prod",
                "role:mysql"
              ],
              "modified_at": "integer",
              "monitor_ids": [],
              "name": "Custom Metric SLO",
              "overall_status": [
                {
                  "error": "string",
                  "error_budget_remaining": 100,
                  "indexed_at": 1662496260,
                  "raw_error_budget_remaining": {
                    "unit": "requests",
                    "value": 60
                  },
                  "span_precision": 2,
                  "state": "ok",
                  "status": 100,
                  "target": 99,
                  "timeframe": "30d"
                }
              ],
              "query": {
                "denominator": "sum:my.custom.metric{*}.as_count()",
                "metrics": [
                  "my.custom.metric",
                  "my.other.custom.metric"
                ],
                "numerator": "sum:my.custom.metric{type:good}.as_count()"
              },
              "service_tags": [],
              "slo_type": "metric",
              "status": {
                "calculation_error": "string",
                "error_budget_remaining": 100,
                "indexed_at": 1662496260,
                "raw_error_budget_remaining": {
                  "unit": "requests",
                  "value": 60
                },
                "sli": 100,
                "span_precision": 2,
                "state": "ok"
              },
              "team_tags": [],
              "thresholds": [
                {
                  "target": 99.9,
                  "target_display": "99.9",
                  "timeframe": "30d",
                  "warning": 90,
                  "warning_display": "90.0"
                }
              ]
            },
            "id": "string",
            "type": "string"
          }
        }
      ]
    },
    "type": ""
  },
  "links": {
    "first": "string",
    "last": "string",
    "next": "string",
    "prev": "string",
    "self": "string"
  },
  "meta": {
    "pagination": {
      "first_number": "integer",
      "last_number": "integer",
      "next_number": "integer",
      "number": "integer",
      "prev_number": "integer",
      "size": "integer",
      "total": "integer",
      "type": "string"
    }
  }
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/search" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Search for SLOs returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi

# there is a valid "slo" in the system
SLO_DATA_0_NAME = environ["SLO_DATA_0_NAME"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.search_slo(
        query=SLO_DATA_0_NAME,
        page_size=20,
        page_number=0,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Search for SLOs returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

# there is a valid "slo" in the system
SLO_DATA_0_NAME = ENV["SLO_DATA_0_NAME"]
opts = {
  query: SLO_DATA_0_NAME,
  page_size: 20,
  page_number: 0,
}
p api_instance.search_slo(opts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Search for SLOs returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "slo" in the system
	SloData0Name := os.Getenv("SLO_DATA_0_NAME")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.SearchSLO(ctx, *datadogV1.NewSearchSLOOptionalParameters().WithQuery(SloData0Name).WithPageSize(20).WithPageNumber(0))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.SearchSLO`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.SearchSLO`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Search for SLOs returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi.SearchSLOOptionalParameters;
import com.datadog.api.client.v1.model.SearchSLOResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "slo" in the system
    String SLO_DATA_0_NAME = System.getenv("SLO_DATA_0_NAME");

    try {
      SearchSLOResponse result =
          apiInstance.searchSLO(
              new SearchSLOOptionalParameters()
                  .query(SLO_DATA_0_NAME)
                  .pageSize(20L)
                  .pageNumber(0L));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#searchSLO");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Search for SLOs returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::SearchSLOOptionalParams;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    // there is a valid "slo" in the system
    let slo_data_0_name = std::env::var("SLO_DATA_0_NAME").unwrap();
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api
        .search_slo(
            SearchSLOOptionalParams::default()
                .query(slo_data_0_name.clone())
                .page_size(20)
                .page_number(0),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Search for SLOs returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

// there is a valid "slo" in the system
const SLO_DATA_0_NAME = process.env.SLO_DATA_0_NAME as string;

const params: v1.ServiceLevelObjectivesApiSearchSLORequest = {
  query: SLO_DATA_0_NAME,
  pageSize: 20,
  pageNumber: 0,
};

apiInstance
  .searchSLO(params)
  .then((data: v1.SearchSLOResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/slohttps://api.datadoghq.eu/api/v1/slohttps://api.ddog-gov.com/api/v1/slohttps://api.datadoghq.com/api/v1/slohttps://api.us3.datadoghq.com/api/v1/slohttps://api.us5.datadoghq.com/api/v1/slo

Información general

Obtén una lista de objetos de objetivos de nivel servicio (SLOs) para tu organización. This endpoint requires the slos_read permission.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Cadenas de consulta

Nombre

Tipo

Descripción

ids

string

A comma separated list of the IDs of the service level objectives objects.

query

string

The query string to filter results based on SLO names.

tags_query

string

The query string to filter results based on a single SLO tag.

metrics_query

string

The query string to filter results based on SLO numerator and denominator.

limit

integer

The number of SLOs to return in the response.

offset

integer

The specific offset to use as the beginning of the returned response.

Respuesta

OK

A response with one or more service level objective.

Expand All

Campo

Tipo

Descripción

data

[object]

An array of service level objective objects.

created_at

int64

Creation timestamp (UNIX time in seconds)

Always included in service level objective responses.

creator

object

Object describing the creator of the shared element.

email

string

Email of the creator.

handle

string

Handle of the creator.

name

string

Name of the creator.

description

string

A user-defined description of the service level objective.

Always included in service level objective responses (but may be null). Optional in create/update requests.

groups

[string]

A list of (up to 100) monitor groups that narrow the scope of a monitor service level objective.

Included in service level objective responses if it is not empty. Optional in create/update requests for monitor service level objectives, but may only be used when then length of the monitor_ids field is one.

id

string

A unique identifier for the service level objective object.

Always included in service level objective responses.

modified_at

int64

Modification timestamp (UNIX time in seconds)

Always included in service level objective responses.

monitor_ids

[integer]

A list of monitor ids that defines the scope of a monitor service level objective. Required if type is monitor.

monitor_tags

[string]

The union of monitor tags for all monitors referenced by the monitor_ids field. Always included in service level objective responses for monitor-based service level objectives (but may be empty). Ignored in create/update requests. Does not affect which monitors are included in the service level objective (that is determined entirely by the monitor_ids field).

name [required]

string

The name of the service level objective object.

query

object

A metric-based SLO. Required if type is metric. Note that Datadog only allows the sum by aggregator to be used because this will sum up all request counts instead of averaging them, or taking the max or min of all of those requests.

denominator [required]

string

A Datadog metric query for total (valid) events.

numerator [required]

string

A Datadog metric query for good events.

sli_specification

 <oneOf>

A generic SLI specification. This is currently used for time-slice SLOs only.

Option 1

object

A time-slice SLI specification.

time_slice [required]

object

The time-slice condition, composed of 3 parts: 1. the metric timeseries query, 2. the comparator, and 3. the threshold. Optionally, a fourth part, the query interval, can be provided.

comparator [required]

enum

The comparator used to compare the SLI value to the threshold. Allowed enum values: >,>=,<,<=

query [required]

object

The queries and formula used to calculate the SLI value.

formulas [required]

[object]

A list that contains exactly one formula, as only a single formula may be used in a time-slice SLO.

formula [required]

string

The formula string, which is an expression involving named queries.

queries [required]

[ <oneOf>]

A list of queries that are used to calculate the SLI value.

Option 1

object

A formula and functions metrics query.

aggregator

enum

The aggregation methods available for metrics queries. Allowed enum values: avg,min,max,sum,last,area,l2norm,percentile

cross_org_uuids

[string]

The source organization UUID for cross organization queries. Feature in Private Beta.

data_source [required]

enum

Data source for metrics queries. Allowed enum values: metrics

name [required]

string

Name of the query for use in formulas.

query [required]

string

Metrics query definition.

query_interval_seconds

enum

The interval used when querying data, which defines the size of a time slice. Two values are allowed: 60 (1 minute) and 300 (5 minutes). If not provided, the value defaults to 300 (5 minutes). Allowed enum values: 60,300

threshold [required]

double

The threshold value to which each SLI value will be compared.

tags

[string]

A list of tags associated with this service level objective. Always included in service level objective responses (but may be empty). Optional in create/update requests.

target_threshold

double

The target threshold such that when the service level indicator is above this threshold over the given timeframe, the objective is being met.

thresholds [required]

[object]

The thresholds (timeframes and associated targets) for this service level objective object.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

timeframe

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

type [required]

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

warning_threshold

double

The optional warning threshold such that when the service level indicator is below this value for the given threshold, but above the target threshold, the objective appears in a "warning" state. This value must be greater than the target threshold.

errors

[string]

An array of error messages. Each endpoint documents how/whether this field is used.

metadata

object

The metadata object containing additional information about the list of SLOs.

page

object

The object containing information about the pages of the list of SLOs.

total_count

int64

The total number of resources that could be retrieved ignoring the parameters and filters in the request.

total_filtered_count

int64

The total number of resources that match the parameters and filters in the request. This attribute can be used by a client to determine the total number of pages.

{
  "data": [
    {
      "created_at": "integer",
      "creator": {
        "email": "string",
        "handle": "string",
        "name": "string"
      },
      "description": "string",
      "groups": [
        "env:prod",
        "role:mysql"
      ],
      "id": "string",
      "modified_at": "integer",
      "monitor_ids": [],
      "monitor_tags": [],
      "name": "Custom Metric SLO",
      "query": {
        "denominator": "sum:my.custom.metric{*}.as_count()",
        "numerator": "sum:my.custom.metric{type:good}.as_count()"
      },
      "sli_specification": {
        "time_slice": {
          "comparator": ">",
          "query": {
            "formulas": [
              {
                "formula": "query1 - default_zero(query2)"
              }
            ],
            "queries": [
              []
            ]
          },
          "query_interval_seconds": 300,
          "threshold": 5
        }
      },
      "tags": [
        "env:prod",
        "app:core"
      ],
      "target_threshold": 99.9,
      "thresholds": [
        {
          "target": 99.9,
          "target_display": "99.9",
          "timeframe": "30d",
          "warning": 90,
          "warning_display": "90.0"
        }
      ],
      "timeframe": "30d",
      "type": "metric",
      "warning_threshold": 99.95
    }
  ],
  "errors": [],
  "metadata": {
    "page": {
      "total_count": "integer",
      "total_filtered_count": "integer"
    }
  }
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get all SLOs returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi

# there is a valid "slo" in the system
SLO_DATA_0_ID = environ["SLO_DATA_0_ID"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.list_slos(
        ids=SLO_DATA_0_ID,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get all SLOs returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

# there is a valid "slo" in the system
SLO_DATA_0_ID = ENV["SLO_DATA_0_ID"]
opts = {
  ids: SLO_DATA_0_ID,
}
p api_instance.list_slos(opts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
require 'dogapi'

api_key = '<DATADOG_API_KEY>'
app_key = '<DATADOG_APPLICATION_KEY>'

dog = Dogapi::Client.new(api_key, app_key)

# Search with a list of IDs
slo_ids = ['<YOUR_SLO_ID>']
dog.search_service_level_objective(slo_ids: slo_ids, offset: 0)

# Search with a query on your SLO Name.
query = 'my team'
dog.search_service_level_objective(query: query, offset: 0)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get all SLOs returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "slo" in the system
	SloData0ID := os.Getenv("SLO_DATA_0_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.ListSLOs(ctx, *datadogV1.NewListSLOsOptionalParameters().WithIds(SloData0ID))

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.ListSLOs`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.ListSLOs`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get all SLOs returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi.ListSLOsOptionalParameters;
import com.datadog.api.client.v1.model.SLOListResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "slo" in the system
    String SLO_DATA_0_ID = System.getenv("SLO_DATA_0_ID");

    try {
      SLOListResponse result =
          apiInstance.listSLOs(new ListSLOsOptionalParameters().ids(SLO_DATA_0_ID));
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#listSLOs");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

initialize(**options)

# Search with a list of IDs
slo_ids = ["<YOUR_SLO_ID>", "<YOUR_SLO_ID>"]

api.ServiceLevelObjective.get_all(ids=slo_ids, offset=0)

# Search with a query on your SLO Name.
query = "my team"

api.ServiceLevelObjective.get_all(query=query, offset=0)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
// Get all SLOs returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::ListSLOsOptionalParams;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    // there is a valid "slo" in the system
    let slo_data_0_id = std::env::var("SLO_DATA_0_ID").unwrap();
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api
        .list_slos(ListSLOsOptionalParams::default().ids(slo_data_0_id.clone()))
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get all SLOs returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

// there is a valid "slo" in the system
const SLO_DATA_0_ID = process.env.SLO_DATA_0_ID as string;

const params: v1.ServiceLevelObjectivesApiListSLOsRequest = {
  ids: SLO_DATA_0_ID,
};

apiInstance
  .listSLOs(params)
  .then((data: v1.SLOListResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

PUT https://api.ap1.datadoghq.com/api/v1/slo/{slo_id}https://api.datadoghq.eu/api/v1/slo/{slo_id}https://api.ddog-gov.com/api/v1/slo/{slo_id}https://api.datadoghq.com/api/v1/slo/{slo_id}https://api.us3.datadoghq.com/api/v1/slo/{slo_id}https://api.us5.datadoghq.com/api/v1/slo/{slo_id}

Información general

Actualiza el objeto de objetivos de nivel de servicio especificado. This endpoint requires the slos_write permission.

OAuth apps require the slos_write authorization scope to access this endpoint.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

slo_id [required]

string

The ID of the service level objective object.

Solicitud

Body Data (required)

El objeto de solicitud de objetivos de nivel servicio modificado.

Expand All

Campo

Tipo

Descripción

created_at

int64

Creation timestamp (UNIX time in seconds)

Always included in service level objective responses.

creator

object

Object describing the creator of the shared element.

email

string

Email of the creator.

handle

string

Handle of the creator.

name

string

Name of the creator.

description

string

A user-defined description of the service level objective.

Always included in service level objective responses (but may be null). Optional in create/update requests.

groups

[string]

A list of (up to 100) monitor groups that narrow the scope of a monitor service level objective.

Included in service level objective responses if it is not empty. Optional in create/update requests for monitor service level objectives, but may only be used when then length of the monitor_ids field is one.

id

string

A unique identifier for the service level objective object.

Always included in service level objective responses.

modified_at

int64

Modification timestamp (UNIX time in seconds)

Always included in service level objective responses.

monitor_ids

[integer]

A list of monitor ids that defines the scope of a monitor service level objective. Required if type is monitor.

monitor_tags

[string]

The union of monitor tags for all monitors referenced by the monitor_ids field. Always included in service level objective responses for monitor-based service level objectives (but may be empty). Ignored in create/update requests. Does not affect which monitors are included in the service level objective (that is determined entirely by the monitor_ids field).

name [required]

string

The name of the service level objective object.

query

object

A metric-based SLO. Required if type is metric. Note that Datadog only allows the sum by aggregator to be used because this will sum up all request counts instead of averaging them, or taking the max or min of all of those requests.

denominator [required]

string

A Datadog metric query for total (valid) events.

numerator [required]

string

A Datadog metric query for good events.

sli_specification

 <oneOf>

A generic SLI specification. This is currently used for time-slice SLOs only.

Option 1

object

A time-slice SLI specification.

time_slice [required]

object

The time-slice condition, composed of 3 parts: 1. the metric timeseries query, 2. the comparator, and 3. the threshold. Optionally, a fourth part, the query interval, can be provided.

comparator [required]

enum

The comparator used to compare the SLI value to the threshold. Allowed enum values: >,>=,<,<=

query [required]

object

The queries and formula used to calculate the SLI value.

formulas [required]

[object]

A list that contains exactly one formula, as only a single formula may be used in a time-slice SLO.

formula [required]

string

The formula string, which is an expression involving named queries.

queries [required]

[ <oneOf>]

A list of queries that are used to calculate the SLI value.

Option 1

object

A formula and functions metrics query.

aggregator

enum

The aggregation methods available for metrics queries. Allowed enum values: avg,min,max,sum,last,area,l2norm,percentile

cross_org_uuids

[string]

The source organization UUID for cross organization queries. Feature in Private Beta.

data_source [required]

enum

Data source for metrics queries. Allowed enum values: metrics

name [required]

string

Name of the query for use in formulas.

query [required]

string

Metrics query definition.

query_interval_seconds

enum

The interval used when querying data, which defines the size of a time slice. Two values are allowed: 60 (1 minute) and 300 (5 minutes). If not provided, the value defaults to 300 (5 minutes). Allowed enum values: 60,300

threshold [required]

double

The threshold value to which each SLI value will be compared.

tags

[string]

A list of tags associated with this service level objective. Always included in service level objective responses (but may be empty). Optional in create/update requests.

target_threshold

double

The target threshold such that when the service level indicator is above this threshold over the given timeframe, the objective is being met.

thresholds [required]

[object]

The thresholds (timeframes and associated targets) for this service level objective object.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

timeframe

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

type [required]

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

warning_threshold

double

The optional warning threshold such that when the service level indicator is below this value for the given threshold, but above the target threshold, the objective appears in a "warning" state. This value must be greater than the target threshold.

{
  "type": "metric",
  "name": "Custom Metric SLO",
  "thresholds": [
    {
      "target": 97.0,
      "timeframe": "7d",
      "warning": 98.0
    }
  ],
  "timeframe": "7d",
  "target_threshold": 97.0,
  "warning_threshold": 98,
  "query": {
    "numerator": "sum:httpservice.hits{code:2xx}.as_count()",
    "denominator": "sum:httpservice.hits{!code:3xx}.as_count()"
  }
}

Respuesta

OK

A response with one or more service level objective.

Expand All

Campo

Tipo

Descripción

data

[object]

An array of service level objective objects.

created_at

int64

Creation timestamp (UNIX time in seconds)

Always included in service level objective responses.

creator

object

Object describing the creator of the shared element.

email

string

Email of the creator.

handle

string

Handle of the creator.

name

string

Name of the creator.

description

string

A user-defined description of the service level objective.

Always included in service level objective responses (but may be null). Optional in create/update requests.

groups

[string]

A list of (up to 100) monitor groups that narrow the scope of a monitor service level objective.

Included in service level objective responses if it is not empty. Optional in create/update requests for monitor service level objectives, but may only be used when then length of the monitor_ids field is one.

id

string

A unique identifier for the service level objective object.

Always included in service level objective responses.

modified_at

int64

Modification timestamp (UNIX time in seconds)

Always included in service level objective responses.

monitor_ids

[integer]

A list of monitor ids that defines the scope of a monitor service level objective. Required if type is monitor.

monitor_tags

[string]

The union of monitor tags for all monitors referenced by the monitor_ids field. Always included in service level objective responses for monitor-based service level objectives (but may be empty). Ignored in create/update requests. Does not affect which monitors are included in the service level objective (that is determined entirely by the monitor_ids field).

name [required]

string

The name of the service level objective object.

query

object

A metric-based SLO. Required if type is metric. Note that Datadog only allows the sum by aggregator to be used because this will sum up all request counts instead of averaging them, or taking the max or min of all of those requests.

denominator [required]

string

A Datadog metric query for total (valid) events.

numerator [required]

string

A Datadog metric query for good events.

sli_specification

 <oneOf>

A generic SLI specification. This is currently used for time-slice SLOs only.

Option 1

object

A time-slice SLI specification.

time_slice [required]

object

The time-slice condition, composed of 3 parts: 1. the metric timeseries query, 2. the comparator, and 3. the threshold. Optionally, a fourth part, the query interval, can be provided.

comparator [required]

enum

The comparator used to compare the SLI value to the threshold. Allowed enum values: >,>=,<,<=

query [required]

object

The queries and formula used to calculate the SLI value.

formulas [required]

[object]

A list that contains exactly one formula, as only a single formula may be used in a time-slice SLO.

formula [required]

string

The formula string, which is an expression involving named queries.

queries [required]

[ <oneOf>]

A list of queries that are used to calculate the SLI value.

Option 1

object

A formula and functions metrics query.

aggregator

enum

The aggregation methods available for metrics queries. Allowed enum values: avg,min,max,sum,last,area,l2norm,percentile

cross_org_uuids

[string]

The source organization UUID for cross organization queries. Feature in Private Beta.

data_source [required]

enum

Data source for metrics queries. Allowed enum values: metrics

name [required]

string

Name of the query for use in formulas.

query [required]

string

Metrics query definition.

query_interval_seconds

enum

The interval used when querying data, which defines the size of a time slice. Two values are allowed: 60 (1 minute) and 300 (5 minutes). If not provided, the value defaults to 300 (5 minutes). Allowed enum values: 60,300

threshold [required]

double

The threshold value to which each SLI value will be compared.

tags

[string]

A list of tags associated with this service level objective. Always included in service level objective responses (but may be empty). Optional in create/update requests.

target_threshold

double

The target threshold such that when the service level indicator is above this threshold over the given timeframe, the objective is being met.

thresholds [required]

[object]

The thresholds (timeframes and associated targets) for this service level objective object.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

timeframe

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

type [required]

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

warning_threshold

double

The optional warning threshold such that when the service level indicator is below this value for the given threshold, but above the target threshold, the objective appears in a "warning" state. This value must be greater than the target threshold.

errors

[string]

An array of error messages. Each endpoint documents how/whether this field is used.

metadata

object

The metadata object containing additional information about the list of SLOs.

page

object

The object containing information about the pages of the list of SLOs.

total_count

int64

The total number of resources that could be retrieved ignoring the parameters and filters in the request.

total_filtered_count

int64

The total number of resources that match the parameters and filters in the request. This attribute can be used by a client to determine the total number of pages.

{
  "data": [
    {
      "created_at": "integer",
      "creator": {
        "email": "string",
        "handle": "string",
        "name": "string"
      },
      "description": "string",
      "groups": [
        "env:prod",
        "role:mysql"
      ],
      "id": "string",
      "modified_at": "integer",
      "monitor_ids": [],
      "monitor_tags": [],
      "name": "Custom Metric SLO",
      "query": {
        "denominator": "sum:my.custom.metric{*}.as_count()",
        "numerator": "sum:my.custom.metric{type:good}.as_count()"
      },
      "sli_specification": {
        "time_slice": {
          "comparator": ">",
          "query": {
            "formulas": [
              {
                "formula": "query1 - default_zero(query2)"
              }
            ],
            "queries": [
              []
            ]
          },
          "query_interval_seconds": 300,
          "threshold": 5
        }
      },
      "tags": [
        "env:prod",
        "app:core"
      ],
      "target_threshold": 99.9,
      "thresholds": [
        {
          "target": 99.9,
          "target_display": "99.9",
          "timeframe": "30d",
          "warning": 90,
          "warning_display": "90.0"
        }
      ],
      "timeframe": "30d",
      "type": "metric",
      "warning_threshold": 99.95
    }
  ],
  "errors": [],
  "metadata": {
    "page": {
      "total_count": "integer",
      "total_filtered_count": "integer"
    }
  }
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Path parameters
export slo_id="CHANGE_ME"
# Curl command
curl -X PUT "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/${slo_id}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "type": "metric", "name": "Custom Metric SLO", "thresholds": [ { "target": 97.0, "timeframe": "7d", "warning": 98.0 } ], "timeframe": "7d", "target_threshold": 97.0, "warning_threshold": 98, "query": { "numerator": "sum:httpservice.hits{code:2xx}.as_count()", "denominator": "sum:httpservice.hits{!code:3xx}.as_count()" } } EOF
// Update an SLO returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "slo" in the system
	SloData0ID := os.Getenv("SLO_DATA_0_ID")
	SloData0Name := os.Getenv("SLO_DATA_0_NAME")

	body := datadogV1.ServiceLevelObjective{
		Type: datadogV1.SLOTYPE_METRIC,
		Name: SloData0Name,
		Thresholds: []datadogV1.SLOThreshold{
			{
				Target:    97.0,
				Timeframe: datadogV1.SLOTIMEFRAME_SEVEN_DAYS,
				Warning:   datadog.PtrFloat64(98.0),
			},
		},
		Timeframe:        datadogV1.SLOTIMEFRAME_SEVEN_DAYS.Ptr(),
		TargetThreshold:  datadog.PtrFloat64(97.0),
		WarningThreshold: datadog.PtrFloat64(98),
		Query: &datadogV1.ServiceLevelObjectiveQuery{
			Numerator:   "sum:httpservice.hits{code:2xx}.as_count()",
			Denominator: "sum:httpservice.hits{!code:3xx}.as_count()",
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.UpdateSLO(ctx, SloData0ID, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.UpdateSLO`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.UpdateSLO`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Update an SLO returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.SLOListResponse;
import com.datadog.api.client.v1.model.SLOThreshold;
import com.datadog.api.client.v1.model.SLOTimeframe;
import com.datadog.api.client.v1.model.SLOType;
import com.datadog.api.client.v1.model.ServiceLevelObjective;
import com.datadog.api.client.v1.model.ServiceLevelObjectiveQuery;
import java.util.Collections;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "slo" in the system
    String SLO_DATA_0_ID = System.getenv("SLO_DATA_0_ID");
    String SLO_DATA_0_NAME = System.getenv("SLO_DATA_0_NAME");

    ServiceLevelObjective body =
        new ServiceLevelObjective()
            .type(SLOType.METRIC)
            .name(SLO_DATA_0_NAME)
            .thresholds(
                Collections.singletonList(
                    new SLOThreshold()
                        .target(97.0)
                        .timeframe(SLOTimeframe.SEVEN_DAYS)
                        .warning(98.0)))
            .timeframe(SLOTimeframe.SEVEN_DAYS)
            .targetThreshold(97.0)
            .warningThreshold(98.0)
            .query(
                new ServiceLevelObjectiveQuery()
                    .numerator("sum:httpservice.hits{code:2xx}.as_count()")
                    .denominator("sum:httpservice.hits{!code:3xx}.as_count()"));

    try {
      SLOListResponse result = apiInstance.updateSLO(SLO_DATA_0_ID, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#updateSLO");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
"""
Update an SLO returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi
from datadog_api_client.v1.model.service_level_objective import ServiceLevelObjective
from datadog_api_client.v1.model.service_level_objective_query import ServiceLevelObjectiveQuery
from datadog_api_client.v1.model.slo_threshold import SLOThreshold
from datadog_api_client.v1.model.slo_timeframe import SLOTimeframe
from datadog_api_client.v1.model.slo_type import SLOType

# there is a valid "slo" in the system
SLO_DATA_0_ID = environ["SLO_DATA_0_ID"]
SLO_DATA_0_NAME = environ["SLO_DATA_0_NAME"]

body = ServiceLevelObjective(
    type=SLOType.METRIC,
    name=SLO_DATA_0_NAME,
    thresholds=[
        SLOThreshold(
            target=97.0,
            timeframe=SLOTimeframe.SEVEN_DAYS,
            warning=98.0,
        ),
    ],
    timeframe=SLOTimeframe.SEVEN_DAYS,
    target_threshold=97.0,
    warning_threshold=98.0,
    query=ServiceLevelObjectiveQuery(
        numerator="sum:httpservice.hits{code:2xx}.as_count()",
        denominator="sum:httpservice.hits{!code:3xx}.as_count()",
    ),
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.update_slo(slo_id=SLO_DATA_0_ID, body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Update an SLO returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

# there is a valid "slo" in the system
SLO_DATA_0_ID = ENV["SLO_DATA_0_ID"]
SLO_DATA_0_NAME = ENV["SLO_DATA_0_NAME"]

body = DatadogAPIClient::V1::ServiceLevelObjective.new({
  type: DatadogAPIClient::V1::SLOType::METRIC,
  name: SLO_DATA_0_NAME,
  thresholds: [
    DatadogAPIClient::V1::SLOThreshold.new({
      target: 97.0,
      timeframe: DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
      warning: 98.0,
    }),
  ],
  timeframe: DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
  target_threshold: 97.0,
  warning_threshold: 98,
  query: DatadogAPIClient::V1::ServiceLevelObjectiveQuery.new({
    numerator: "sum:httpservice.hits{code:2xx}.as_count()",
    denominator: "sum:httpservice.hits{!code:3xx}.as_count()",
  }),
})
p api_instance.update_slo(SLO_DATA_0_ID, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Update an SLO returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;
use datadog_api_client::datadogV1::model::SLOThreshold;
use datadog_api_client::datadogV1::model::SLOTimeframe;
use datadog_api_client::datadogV1::model::SLOType;
use datadog_api_client::datadogV1::model::ServiceLevelObjective;
use datadog_api_client::datadogV1::model::ServiceLevelObjectiveQuery;

#[tokio::main]
async fn main() {
    // there is a valid "slo" in the system
    let slo_data_0_id = std::env::var("SLO_DATA_0_ID").unwrap();
    let slo_data_0_name = std::env::var("SLO_DATA_0_NAME").unwrap();
    let body = ServiceLevelObjective::new(
        slo_data_0_name.clone(),
        vec![SLOThreshold::new(97.0, SLOTimeframe::SEVEN_DAYS).warning(98.0 as f64)],
        SLOType::METRIC,
    )
    .query(ServiceLevelObjectiveQuery::new(
        "sum:httpservice.hits{!code:3xx}.as_count()".to_string(),
        "sum:httpservice.hits{code:2xx}.as_count()".to_string(),
    ))
    .target_threshold(97.0 as f64)
    .timeframe(SLOTimeframe::SEVEN_DAYS)
    .warning_threshold(98.0 as f64);
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.update_slo(slo_data_0_id.clone(), body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Update an SLO returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

// there is a valid "slo" in the system
const SLO_DATA_0_ID = process.env.SLO_DATA_0_ID as string;
const SLO_DATA_0_NAME = process.env.SLO_DATA_0_NAME as string;

const params: v1.ServiceLevelObjectivesApiUpdateSLORequest = {
  body: {
    type: "metric",
    name: SLO_DATA_0_NAME,
    thresholds: [
      {
        target: 97.0,
        timeframe: "7d",
        warning: 98.0,
      },
    ],
    timeframe: "7d",
    targetThreshold: 97.0,
    warningThreshold: 98,
    query: {
      numerator: "sum:httpservice.hits{code:2xx}.as_count()",
      denominator: "sum:httpservice.hits{!code:3xx}.as_count()",
    },
  },
  sloId: SLO_DATA_0_ID,
};

apiInstance
  .updateSLO(params)
  .then((data: v1.SLOListResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/slo/{slo_id}https://api.datadoghq.eu/api/v1/slo/{slo_id}https://api.ddog-gov.com/api/v1/slo/{slo_id}https://api.datadoghq.com/api/v1/slo/{slo_id}https://api.us3.datadoghq.com/api/v1/slo/{slo_id}https://api.us5.datadoghq.com/api/v1/slo/{slo_id}

Información general

Obtén un objeto de objetivos de nivel servicio. This endpoint requires the slos_read permission.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

slo_id [required]

string

The ID of the service level objective object.

Cadenas de consulta

Nombre

Tipo

Descripción

with_configured_alert_ids

boolean

Get the IDs of SLO monitors that reference this SLO.

Respuesta

OK

A service level objective response containing a single service level objective.

Expand All

Campo

Tipo

Descripción

data

object

A service level objective object includes a service level indicator, thresholds for one or more timeframes, and metadata (name, description, tags, etc.).

configured_alert_ids

[integer]

A list of SLO monitors IDs that reference this SLO. This field is returned only when with_configured_alert_ids parameter is true in query.

created_at

int64

Creation timestamp (UNIX time in seconds)

Always included in service level objective responses.

creator

object

Object describing the creator of the shared element.

email

string

Email of the creator.

handle

string

Handle of the creator.

name

string

Name of the creator.

description

string

A user-defined description of the service level objective.

Always included in service level objective responses (but may be null). Optional in create/update requests.

groups

[string]

A list of (up to 20) monitor groups that narrow the scope of a monitor service level objective.

Included in service level objective responses if it is not empty. Optional in create/update requests for monitor service level objectives, but may only be used when then length of the monitor_ids field is one.

id

string

A unique identifier for the service level objective object.

Always included in service level objective responses.

modified_at

int64

Modification timestamp (UNIX time in seconds)

Always included in service level objective responses.

monitor_ids

[integer]

A list of monitor ids that defines the scope of a monitor service level objective. Required if type is monitor.

monitor_tags

[string]

The union of monitor tags for all monitors referenced by the monitor_ids field. Always included in service level objective responses for monitor service level objectives (but may be empty). Ignored in create/update requests. Does not affect which monitors are included in the service level objective (that is determined entirely by the monitor_ids field).

name

string

The name of the service level objective object.

query

object

A metric-based SLO. Required if type is metric. Note that Datadog only allows the sum by aggregator to be used because this will sum up all request counts instead of averaging them, or taking the max or min of all of those requests.

denominator [required]

string

A Datadog metric query for total (valid) events.

numerator [required]

string

A Datadog metric query for good events.

sli_specification

 <oneOf>

A generic SLI specification. This is currently used for time-slice SLOs only.

Option 1

object

A time-slice SLI specification.

time_slice [required]

object

The time-slice condition, composed of 3 parts: 1. the metric timeseries query, 2. the comparator, and 3. the threshold. Optionally, a fourth part, the query interval, can be provided.

comparator [required]

enum

The comparator used to compare the SLI value to the threshold. Allowed enum values: >,>=,<,<=

query [required]

object

The queries and formula used to calculate the SLI value.

formulas [required]

[object]

A list that contains exactly one formula, as only a single formula may be used in a time-slice SLO.

formula [required]

string

The formula string, which is an expression involving named queries.

queries [required]

[ <oneOf>]

A list of queries that are used to calculate the SLI value.

Option 1

object

A formula and functions metrics query.

aggregator

enum

The aggregation methods available for metrics queries. Allowed enum values: avg,min,max,sum,last,area,l2norm,percentile

cross_org_uuids

[string]

The source organization UUID for cross organization queries. Feature in Private Beta.

data_source [required]

enum

Data source for metrics queries. Allowed enum values: metrics

name [required]

string

Name of the query for use in formulas.

query [required]

string

Metrics query definition.

query_interval_seconds

enum

The interval used when querying data, which defines the size of a time slice. Two values are allowed: 60 (1 minute) and 300 (5 minutes). If not provided, the value defaults to 300 (5 minutes). Allowed enum values: 60,300

threshold [required]

double

The threshold value to which each SLI value will be compared.

tags

[string]

A list of tags associated with this service level objective. Always included in service level objective responses (but may be empty). Optional in create/update requests.

target_threshold

double

The target threshold such that when the service level indicator is above this threshold over the given timeframe, the objective is being met.

thresholds

[object]

The thresholds (timeframes and associated targets) for this service level objective object.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

timeframe

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

type

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

warning_threshold

double

The optional warning threshold such that when the service level indicator is below this value for the given threshold, but above the target threshold, the objective appears in a "warning" state. This value must be greater than the target threshold.

errors

[string]

An array of error messages. Each endpoint documents how/whether this field is used.

{
  "data": {
    "configured_alert_ids": [
      123,
      456,
      789
    ],
    "created_at": "integer",
    "creator": {
      "email": "string",
      "handle": "string",
      "name": "string"
    },
    "description": "string",
    "groups": [
      "env:prod",
      "role:mysql"
    ],
    "id": "string",
    "modified_at": "integer",
    "monitor_ids": [],
    "monitor_tags": [],
    "name": "Custom Metric SLO",
    "query": {
      "denominator": "sum:my.custom.metric{*}.as_count()",
      "numerator": "sum:my.custom.metric{type:good}.as_count()"
    },
    "sli_specification": {
      "time_slice": {
        "comparator": ">",
        "query": {
          "formulas": [
            {
              "formula": "query1 - default_zero(query2)"
            }
          ],
          "queries": [
            []
          ]
        },
        "query_interval_seconds": 300,
        "threshold": 5
      }
    },
    "tags": [
      "env:prod",
      "app:core"
    ],
    "target_threshold": 99.9,
    "thresholds": [
      {
        "target": 99.9,
        "target_display": "99.9",
        "timeframe": "30d",
        "warning": 90,
        "warning_display": "90.0"
      }
    ],
    "timeframe": "30d",
    "type": "metric",
    "warning_threshold": 99.95
  },
  "errors": []
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Not found

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export slo_id="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/${slo_id}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get an SLO's details returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi

# there is a valid "slo" in the system
SLO_DATA_0_ID = environ["SLO_DATA_0_ID"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.get_slo(
        slo_id=SLO_DATA_0_ID,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get an SLO's details returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

# there is a valid "slo" in the system
SLO_DATA_0_ID = ENV["SLO_DATA_0_ID"]
p api_instance.get_slo(SLO_DATA_0_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
# This is not currently available for the Ruby API.

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get an SLO's details returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "slo" in the system
	SloData0ID := os.Getenv("SLO_DATA_0_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.GetSLO(ctx, SloData0ID, *datadogV1.NewGetSLOOptionalParameters())

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.GetSLO`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.GetSLO`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get an SLO's details returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.SLOResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "slo" in the system
    String SLO_DATA_0_ID = System.getenv("SLO_DATA_0_ID");

    try {
      SLOResponse result = apiInstance.getSLO(SLO_DATA_0_ID);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#getSLO");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

slo_id = '<YOUR_SLO_ID>'

initialize(**options)

api.ServiceLevelObjective.get(slo_id)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
// Get an SLO's details returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::GetSLOOptionalParams;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    // there is a valid "slo" in the system
    let slo_data_0_id = std::env::var("SLO_DATA_0_ID").unwrap();
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api
        .get_slo(slo_data_0_id.clone(), GetSLOOptionalParams::default())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get an SLO's details returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

// there is a valid "slo" in the system
const SLO_DATA_0_ID = process.env.SLO_DATA_0_ID as string;

const params: v1.ServiceLevelObjectivesApiGetSLORequest = {
  sloId: SLO_DATA_0_ID,
};

apiInstance
  .getSLO(params)
  .then((data: v1.SLOResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

DELETE https://api.ap1.datadoghq.com/api/v1/slo/{slo_id}https://api.datadoghq.eu/api/v1/slo/{slo_id}https://api.ddog-gov.com/api/v1/slo/{slo_id}https://api.datadoghq.com/api/v1/slo/{slo_id}https://api.us3.datadoghq.com/api/v1/slo/{slo_id}https://api.us5.datadoghq.com/api/v1/slo/{slo_id}

Información general

Elimina permanentemente el objeto de objetivos de nivel de servicio especificado.

Si se utiliza un SLO en un dashboard, el endpoint DELETE /v1/slo/ devuelve un error de conflicto 409 porque se hace referencia al SLO en un dashboard.

This endpoint requires the slos_write permission.

OAuth apps require the slos_write authorization scope to access this endpoint.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

slo_id [required]

string

The ID of the service level objective.

Cadenas de consulta

Nombre

Tipo

Descripción

force

string

Delete the monitor even if it’s referenced by other resources (for example SLO, composite monitor).

Respuesta

OK

A response list of all service level objective deleted.

Expand All

Campo

Tipo

Descripción

data

[string]

An array containing the ID of the deleted service level objective object.

errors

object

An dictionary containing the ID of the SLO as key and a deletion error as value.

<any-key>

string

Error preventing the SLO deletion.

{
  "data": [],
  "errors": {
    "<any-key>": "string"
  }
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Not found

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Conflict

A response list of all service level objective deleted.

Expand All

Campo

Tipo

Descripción

data

[string]

An array containing the ID of the deleted service level objective object.

errors

object

An dictionary containing the ID of the SLO as key and a deletion error as value.

<any-key>

string

Error preventing the SLO deletion.

{
  "data": [],
  "errors": {
    "<any-key>": "string"
  }
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export slo_id="CHANGE_ME"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/${slo_id}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Delete an SLO returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi

# there is a valid "slo" in the system
SLO_DATA_0_ID = environ["SLO_DATA_0_ID"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.delete_slo(
        slo_id=SLO_DATA_0_ID,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Delete an SLO returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

# there is a valid "slo" in the system
SLO_DATA_0_ID = ENV["SLO_DATA_0_ID"]
p api_instance.delete_slo(SLO_DATA_0_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
require 'dogapi'

api_key = '<DATADOG_API_KEY>'
app_key = '<DATADOG_APPLICATION_KEY>'
slo_id  = '<YOUR_SLO_ID>'

dog = Dogapi::Client.new(api_key, app_key)

dog.delete_service_level_objective(slo_id)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Delete an SLO returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "slo" in the system
	SloData0ID := os.Getenv("SLO_DATA_0_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.DeleteSLO(ctx, SloData0ID, *datadogV1.NewDeleteSLOOptionalParameters())

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.DeleteSLO`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.DeleteSLO`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Delete an SLO returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.SLODeleteResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "slo" in the system
    String SLO_DATA_0_ID = System.getenv("SLO_DATA_0_ID");

    try {
      SLODeleteResponse result = apiInstance.deleteSLO(SLO_DATA_0_ID);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#deleteSLO");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

slo_id = '<YOUR_SLO_ID>'

initialize(**options)

api.ServiceLevelObjective.delete(slo_id)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
// Delete an SLO returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::DeleteSLOOptionalParams;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    // there is a valid "slo" in the system
    let slo_data_0_id = std::env::var("SLO_DATA_0_ID").unwrap();
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api
        .delete_slo(slo_data_0_id.clone(), DeleteSLOOptionalParams::default())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Delete an SLO returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

// there is a valid "slo" in the system
const SLO_DATA_0_ID = process.env.SLO_DATA_0_ID as string;

const params: v1.ServiceLevelObjectivesApiDeleteSLORequest = {
  sloId: SLO_DATA_0_ID,
};

apiInstance
  .deleteSLO(params)
  .then((data: v1.SLODeleteResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/slo/{slo_id}/historyhttps://api.datadoghq.eu/api/v1/slo/{slo_id}/historyhttps://api.ddog-gov.com/api/v1/slo/{slo_id}/historyhttps://api.datadoghq.com/api/v1/slo/{slo_id}/historyhttps://api.us3.datadoghq.com/api/v1/slo/{slo_id}/historyhttps://api.us5.datadoghq.com/api/v1/slo/{slo_id}/history

Información general

Obtén el historial de un SLO específico, independientemente de su tipo de SLO.

Los datos detallados del historial se estructuran según el tipo de datos de origen. Por ejemplo, los datos de métricas se incluyen para los SLOs de evento que utilizan la fuente de métricas y los tipos de SLOs de monitor incluyen el historial de transición del monitor.

Nota: Existen diferentes formatos de respuesta para los SLOs basados en eventos y en el tiempo. Se muestran ejemplos de ambos.

This endpoint requires the slos_read permission.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

slo_id [required]

string

The ID of the service level objective object.

Cadenas de consulta

Nombre

Tipo

Descripción

from_ts [required]

integer

The from timestamp for the query window in epoch seconds.

to_ts [required]

integer

The to timestamp for the query window in epoch seconds.

target

number

The SLO target. If target is passed in, the response will include the remaining error budget and a timeframe value of custom.

apply_correction

boolean

Defaults to true. If any SLO corrections are applied and this parameter is set to false, then the corrections will not be applied and the SLI values will not be affected.

Respuesta

OK

A service level objective history response.

Expand All

Campo

Tipo

Descripción

data

object

An array of service level objective objects.

from_ts

int64

The from timestamp in epoch seconds.

group_by

[string]

For metric based SLOs where the query includes a group-by clause, this represents the list of grouping parameters.

This is not included in responses for monitor based SLOs.

groups

[object]

For grouped SLOs, this represents SLI data for specific groups.

This is not included in the responses for metric based SLOs.

error_budget_remaining

object

A mapping of threshold timeframe to the remaining error budget.

<any-key>

double

Remaining error budget.

errors

[object]

An array of error objects returned while querying the history data for the service level objective.

error_message [required]

string

A message with more details about the error.

error_type [required]

string

Type of the error.

group

string

For groups in a grouped SLO, this is the group name.

history

[array]

The state transition history for the monitor. It is represented as an array of pairs. Each pair is an array containing the timestamp of the transition as an integer in Unix epoch format in the first element, and the state as an integer in the second element. An integer value of 0 for state means uptime, 1 means downtime, and 2 means no data. Periods of no data are counted either as uptime or downtime depending on monitor settings. See SLO documentation for detailed information.

monitor_modified

int64

For monitor based SLOs, this is the last modified timestamp in epoch seconds of the monitor.

monitor_type

string

For monitor based SLOs, this describes the type of monitor.

name

string

For groups in a grouped SLO, this is the group name. For monitors in a multi-monitor SLO, this is the monitor name.

precision

double

DEPRECATED: The amount of decimal places the SLI value is accurate to for the given from && to timestamp. Use span_precision instead.

preview

boolean

For monitor based SLOs, when true this indicates that a replay is in progress to give an accurate uptime calculation.

sli_value

double

The current SLI value of the SLO over the history window.

span_precision

double

The amount of decimal places the SLI value is accurate to for the given from && to timestamp.

uptime

double

DEPRECATED: Use sli_value instead.

monitors

[object]

For multi-monitor SLOs, this represents SLI data for specific monitors.

This is not included in the responses for metric based SLOs.

error_budget_remaining

object

A mapping of threshold timeframe to the remaining error budget.

<any-key>

double

Remaining error budget.

errors

[object]

An array of error objects returned while querying the history data for the service level objective.

error_message [required]

string

A message with more details about the error.

error_type [required]

string

Type of the error.

group

string

For groups in a grouped SLO, this is the group name.

history

[array]

The state transition history for the monitor. It is represented as an array of pairs. Each pair is an array containing the timestamp of the transition as an integer in Unix epoch format in the first element, and the state as an integer in the second element. An integer value of 0 for state means uptime, 1 means downtime, and 2 means no data. Periods of no data are counted either as uptime or downtime depending on monitor settings. See SLO documentation for detailed information.

monitor_modified

int64

For monitor based SLOs, this is the last modified timestamp in epoch seconds of the monitor.

monitor_type

string

For monitor based SLOs, this describes the type of monitor.

name

string

For groups in a grouped SLO, this is the group name. For monitors in a multi-monitor SLO, this is the monitor name.

precision

double

DEPRECATED: The amount of decimal places the SLI value is accurate to for the given from && to timestamp. Use span_precision instead.

preview

boolean

For monitor based SLOs, when true this indicates that a replay is in progress to give an accurate uptime calculation.

sli_value

double

The current SLI value of the SLO over the history window.

span_precision

double

The amount of decimal places the SLI value is accurate to for the given from && to timestamp.

uptime

double

DEPRECATED: Use sli_value instead.

overall

object

An object that holds an SLI value and its associated data. It can represent an SLO's overall SLI value. This can also represent the SLI value for a specific monitor in multi-monitor SLOs, or a group in grouped SLOs.

error_budget_remaining

object

A mapping of threshold timeframe to the remaining error budget.

<any-key>

double

Remaining error budget.

errors

[object]

An array of error objects returned while querying the history data for the service level objective.

error_message [required]

string

A message with more details about the error.

error_type [required]

string

Type of the error.

group

string

For groups in a grouped SLO, this is the group name.

history

[array]

The state transition history for monitor or time-slice SLOs. It is represented as an array of pairs. Each pair is an array containing the timestamp of the transition as an integer in Unix epoch format in the first element, and the state as an integer in the second element. An integer value of 0 for state means uptime, 1 means downtime, and 2 means no data. Periods of no data count as uptime in time-slice SLOs, while for monitor SLOs, no data is counted either as uptime or downtime depending on monitor settings. See SLO documentation for detailed information.

monitor_modified

int64

For monitor based SLOs, this is the last modified timestamp in epoch seconds of the monitor.

monitor_type

string

For monitor based SLOs, this describes the type of monitor.

name

string

For groups in a grouped SLO, this is the group name. For monitors in a multi-monitor SLO, this is the monitor name.

precision

object

A mapping of threshold timeframe to number of accurate decimals, regardless of the from && to timestamp.

<any-key>

double

The number of accurate decimals.

preview

boolean

For monitor based SLOs, when true this indicates that a replay is in progress to give an accurate uptime calculation.

sli_value

double

The current SLI value of the SLO over the history window.

span_precision

double

The amount of decimal places the SLI value is accurate to for the given from && to timestamp.

uptime

double

DEPRECATED: Use sli_value instead.

series

object

A metric based SLO history response.

This is not included in responses for monitor based SLOs.

denominator [required]

object

A representation of metric based SLO timeseries for the provided queries. This is the same response type from batch_query endpoint.

count [required]

int64

Count of submitted metrics.

metadata

object

Query metadata.

aggr

string

Query aggregator function.

expression

string

Query expression.

metric

string

Query metric used.

query_index

int64

Query index from original combined query.

scope

string

Query scope.

unit

[object]

An array of metric units that contains up to two unit objects. For example, bytes represents one unit object and bytes per second represents two unit objects. If a metric query only has one unit object, the second array element is null.

family

string

The family of metric unit, for example bytes is the family for kibibyte, byte, and bit units.

id

int64

The ID of the metric unit.

name

string

The unit of the metric, for instance byte.

plural

string

The plural Unit of metric, for instance bytes.

scale_factor

double

The scale factor of metric unit, for instance 1.0.

short_name

string

A shorter and abbreviated version of the metric unit, for instance B.

sum [required]

double

Total sum of the query.

values [required]

[number]

The query values for each metric.

interval [required]

int64

The aggregated query interval for the series data. It's implicit based on the query time window.

message

string

Optional message if there are specific query issues/warnings.

numerator [required]

object

A representation of metric based SLO timeseries for the provided queries. This is the same response type from batch_query endpoint.

count [required]

int64

Count of submitted metrics.

metadata

object

Query metadata.

aggr

string

Query aggregator function.

expression

string

Query expression.

metric

string

Query metric used.

query_index

int64

Query index from original combined query.

scope

string

Query scope.

unit

[object]

An array of metric units that contains up to two unit objects. For example, bytes represents one unit object and bytes per second represents two unit objects. If a metric query only has one unit object, the second array element is null.

family

string

The family of metric unit, for example bytes is the family for kibibyte, byte, and bit units.

id

int64

The ID of the metric unit.

name

string

The unit of the metric, for instance byte.

plural

string

The plural Unit of metric, for instance bytes.

scale_factor

double

The scale factor of metric unit, for instance 1.0.

short_name

string

A shorter and abbreviated version of the metric unit, for instance B.

sum [required]

double

Total sum of the query.

values [required]

[number]

The query values for each metric.

query [required]

string

The combined numerator and denominator query CSV.

res_type [required]

string

The series result type. This mimics batch_query response type.

resp_version [required]

int64

The series response version type. This mimics batch_query response type.

times [required]

[number]

An array of query timestamps in EPOCH milliseconds.

thresholds

object

mapping of string timeframe to the SLO threshold.

<any-key>

object

SLO thresholds (target and optionally warning) for a single time window.

target [required]

double

The target value for the service level indicator within the corresponding timeframe.

target_display

string

A string representation of the target that indicates its precision. It uses trailing zeros to show significant decimal places (for example 98.00).

Always included in service level objective responses. Ignored in create/update requests.

timeframe [required]

enum

The SLO time window options. Note that "custom" is not a valid option for creating or updating SLOs. It is only used when querying SLO history over custom timeframes. Allowed enum values: 7d,30d,90d,custom

warning

double

The warning value for the service level objective.

warning_display

string

A string representation of the warning target (see the description of the target_display field for details).

Included in service level objective responses if a warning target exists. Ignored in create/update requests.

to_ts

int64

The to timestamp in epoch seconds.

type

enum

The type of the service level objective. Allowed enum values: metric,monitor,time_slice

type_id

enum

A numeric representation of the type of the service level objective (0 for monitor, 1 for metric). Always included in service level objective responses. Ignored in create/update requests. Allowed enum values: 0,1,2

errors

[object]

A list of errors while querying the history data for the service level objective.

error

string

Human readable error.

{
  "data": {
    "from_ts": 1615323990,
    "group_by": [],
    "groups": [
      {
        "error_budget_remaining": {
          "<any-key>": "number"
        },
        "errors": [
          {
            "error_message": "",
            "error_type": ""
          }
        ],
        "group": "name",
        "history": [
          [
            1579212382,
            0
          ]
        ],
        "monitor_modified": 1615867200,
        "monitor_type": "string",
        "name": "string",
        "precision": 2,
        "preview": true,
        "sli_value": 99.99,
        "span_precision": 2,
        "uptime": 99.99
      }
    ],
    "monitors": [
      {
        "error_budget_remaining": {
          "<any-key>": "number"
        },
        "errors": [
          {
            "error_message": "",
            "error_type": ""
          }
        ],
        "group": "name",
        "history": [
          [
            1579212382,
            0
          ]
        ],
        "monitor_modified": 1615867200,
        "monitor_type": "string",
        "name": "string",
        "precision": 2,
        "preview": true,
        "sli_value": 99.99,
        "span_precision": 2,
        "uptime": 99.99
      }
    ],
    "overall": {
      "error_budget_remaining": {
        "<any-key>": "number"
      },
      "errors": [
        {
          "error_message": "",
          "error_type": ""
        }
      ],
      "group": "name",
      "history": [
        [
          1579212382,
          0
        ]
      ],
      "monitor_modified": 1615867200,
      "monitor_type": "string",
      "name": "string",
      "precision": {
        "<any-key>": "number"
      },
      "preview": true,
      "sli_value": 99.99,
      "span_precision": 2,
      "uptime": 99.99
    },
    "series": {
      "denominator": {
        "count": 0,
        "metadata": {
          "aggr": "string",
          "expression": "string",
          "metric": "string",
          "query_index": "integer",
          "scope": "string",
          "unit": [
            {
              "family": "bytes",
              "id": 2,
              "name": "byte",
              "plural": "bytes",
              "scale_factor": 1,
              "short_name": "B"
            }
          ]
        },
        "sum": 0,
        "values": [
          []
        ]
      },
      "interval": 0,
      "message": "",
      "numerator": {
        "count": 0,
        "metadata": {
          "aggr": "string",
          "expression": "string",
          "metric": "string",
          "query_index": "integer",
          "scope": "string",
          "unit": [
            {
              "family": "bytes",
              "id": 2,
              "name": "byte",
              "plural": "bytes",
              "scale_factor": 1,
              "short_name": "B"
            }
          ]
        },
        "sum": 0,
        "values": [
          []
        ]
      },
      "query": "",
      "res_type": "",
      "resp_version": 0,
      "times": [
        []
      ]
    },
    "thresholds": {
      "<any-key>": {
        "target": 99.9,
        "target_display": "99.9",
        "timeframe": "30d",
        "warning": 90,
        "warning_display": "90.0"
      }
    },
    "to_ts": 1615928790,
    "type": "metric",
    "type_id": 0
  },
  "errors": [
    {
      "error": "string"
    }
  ]
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export slo_id="CHANGE_ME"
# Required query arguments
export from_ts="CHANGE_ME"
export to_ts="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/${slo_id}/history?from_ts=${from_ts}&to_ts=${to_ts}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get an SLO's history returns "OK" response
"""

from datetime import datetime
from dateutil.relativedelta import relativedelta
from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi

# there is a valid "slo" in the system
SLO_DATA_0_ID = environ["SLO_DATA_0_ID"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.get_slo_history(
        slo_id=SLO_DATA_0_ID,
        from_ts=int((datetime.now() + relativedelta(days=-1)).timestamp()),
        to_ts=int(datetime.now().timestamp()),
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get an SLO's history returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

# there is a valid "slo" in the system
SLO_DATA_0_ID = ENV["SLO_DATA_0_ID"]
p api_instance.get_slo_history(SLO_DATA_0_ID, (Time.now + -1 * 86400).to_i, Time.now.to_i)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
require 'dogapi'

api_key = '<DATADOG_API_KEY>'
app_key = '<DATADOG_APPLICATION_KEY>'
slo_id  = '<YOUR_SLO_ID>'

dog = Dogapi::Client.new(api_key, app_key)

to_ts = 1_571_320_613
from_ts = to_ts - 60 * 60 * 24 * 30

dog.get_service_level_objective_history(slo_id, from_ts, to_ts)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get an SLO's history returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"
	"time"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "slo" in the system
	SloData0ID := os.Getenv("SLO_DATA_0_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.GetSLOHistory(ctx, SloData0ID, time.Now().AddDate(0, 0, -1).Unix(), time.Now().Unix(), *datadogV1.NewGetSLOHistoryOptionalParameters())

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.GetSLOHistory`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.GetSLOHistory`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get an SLO's history returns "OK" response
import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.SLOHistoryResponse;
import java.time.OffsetDateTime;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "slo" in the system
    String SLO_DATA_0_ID = System.getenv("SLO_DATA_0_ID");

    try {
      SLOHistoryResponse result =
          apiInstance.getSLOHistory(
              SLO_DATA_0_ID,
              OffsetDateTime.now().plusDays(-1).toInstant().getEpochSecond(),
              OffsetDateTime.now().toInstant().getEpochSecond());
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#getSLOHistory");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api
import time

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

slo_id = '<YOUR_SLO_ID>'

initialize(**options)

to_ts = int(time.time())
from_ts = to_ts - 60*60*24*30

api.ServiceLevelObjective.history(slo_id, from_ts=from_ts, to_ts=to_ts)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
// Get an SLO's history returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::GetSLOHistoryOptionalParams;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    // there is a valid "slo" in the system
    let slo_data_0_id = std::env::var("SLO_DATA_0_ID").unwrap();
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api
        .get_slo_history(
            slo_data_0_id.clone(),
            1636542671,
            1636629071,
            GetSLOHistoryOptionalParams::default(),
        )
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get an SLO's history returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

// there is a valid "slo" in the system
const SLO_DATA_0_ID = process.env.SLO_DATA_0_ID as string;

const params: v1.ServiceLevelObjectivesApiGetSLOHistoryRequest = {
  sloId: SLO_DATA_0_ID,
  fromTs: Math.round(
    new Date(new Date().getTime() + -1 * 86400 * 1000).getTime() / 1000
  ),
  toTs: Math.round(new Date().getTime() / 1000),
};

apiInstance
  .getSLOHistory(params)
  .then((data: v1.SLOHistoryResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/slo/{slo_id}/correctionshttps://api.datadoghq.eu/api/v1/slo/{slo_id}/correctionshttps://api.ddog-gov.com/api/v1/slo/{slo_id}/correctionshttps://api.datadoghq.com/api/v1/slo/{slo_id}/correctionshttps://api.us3.datadoghq.com/api/v1/slo/{slo_id}/correctionshttps://api.us5.datadoghq.com/api/v1/slo/{slo_id}/corrections

Información general

Obtener correcciones aplicadas a un SLO This endpoint requires the slos_read permission.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

slo_id [required]

string

The ID of the service level objective object.

Respuesta

OK

A list of SLO correction objects.

Expand All

Campo

Tipo

Descripción

data

[object]

The list of SLO corrections objects.

attributes

object

The attribute object associated with the SLO correction.

category

enum

Category the SLO correction belongs to. Allowed enum values: Scheduled Maintenance,Outside Business Hours,Deployment,Other

created_at

int64

The epoch timestamp of when the correction was created at.

creator

object

Object describing the creator of the shared element.

email

string

Email of the creator.

handle

string

Handle of the creator.

name

string

Name of the creator.

description

string

Description of the correction being made.

duration

int64

Length of time (in seconds) for a specified rrule recurring SLO correction.

end

int64

Ending time of the correction in epoch seconds.

modified_at

int64

The epoch timestamp of when the correction was modified at.

modifier

object

Modifier of the object.

email

string

Email of the Modifier.

handle

string

Handle of the Modifier.

name

string

Name of the Modifier.

rrule

string

The recurrence rules as defined in the iCalendar RFC 5545. The supported rules for SLO corrections are FREQ, INTERVAL, COUNT, UNTIL and BYDAY.

slo_id

string

ID of the SLO that this correction applies to.

start

int64

Starting time of the correction in epoch seconds.

timezone

string

The timezone to display in the UI for the correction times (defaults to "UTC").

id

string

The ID of the SLO correction.

type

enum

SLO correction resource type. Allowed enum values: correction

default: correction

meta

object

Object describing meta attributes of response.

page

object

Pagination object.

total_count

int64

Total count.

total_filtered_count

int64

Total count of elements matched by the filter.

{
  "data": [
    {
      "attributes": {
        "category": "Scheduled Maintenance",
        "created_at": "integer",
        "creator": {
          "email": "string",
          "handle": "string",
          "name": "string"
        },
        "description": "string",
        "duration": 3600,
        "end": "integer",
        "modified_at": "integer",
        "modifier": {
          "email": "string",
          "handle": "string",
          "name": "string"
        },
        "rrule": "FREQ=DAILY;INTERVAL=10;COUNT=5",
        "slo_id": "string",
        "start": "integer",
        "timezone": "string"
      },
      "id": "string",
      "type": "correction"
    }
  ],
  "meta": {
    "page": {
      "total_count": "integer",
      "total_filtered_count": "integer"
    }
  }
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export slo_id="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/${slo_id}/corrections" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get Corrections For an SLO returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi

# there is a valid "slo" in the system
SLO_DATA_0_ID = environ["SLO_DATA_0_ID"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.get_slo_corrections(
        slo_id=SLO_DATA_0_ID,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get Corrections For an SLO returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

# there is a valid "slo" in the system
SLO_DATA_0_ID = ENV["SLO_DATA_0_ID"]
p api_instance.get_slo_corrections(SLO_DATA_0_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get Corrections For an SLO returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "slo" in the system
	SloData0ID := os.Getenv("SLO_DATA_0_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.GetSLOCorrections(ctx, SloData0ID)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.GetSLOCorrections`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.GetSLOCorrections`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get Corrections For an SLO returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.SLOCorrectionListResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "slo" in the system
    String SLO_DATA_0_ID = System.getenv("SLO_DATA_0_ID");

    try {
      SLOCorrectionListResponse result = apiInstance.getSLOCorrections(SLO_DATA_0_ID);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#getSLOCorrections");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Get Corrections For an SLO returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    // there is a valid "slo" in the system
    let slo_data_0_id = std::env::var("SLO_DATA_0_ID").unwrap();
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.get_slo_corrections(slo_data_0_id.clone()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get Corrections For an SLO returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

// there is a valid "slo" in the system
const SLO_DATA_0_ID = process.env.SLO_DATA_0_ID as string;

const params: v1.ServiceLevelObjectivesApiGetSLOCorrectionsRequest = {
  sloId: SLO_DATA_0_ID,
};

apiInstance
  .getSLOCorrections(params)
  .then((data: v1.SLOCorrectionListResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/slo/can_deletehttps://api.datadoghq.eu/api/v1/slo/can_deletehttps://api.ddog-gov.com/api/v1/slo/can_deletehttps://api.datadoghq.com/api/v1/slo/can_deletehttps://api.us3.datadoghq.com/api/v1/slo/can_deletehttps://api.us5.datadoghq.com/api/v1/slo/can_delete

Información general

Comprueba si un SLO puede eliminarse de forma segura. Por ejemplo, asegúrate de que un SLO puede eliminarse sin interrumpir un dashboard. This endpoint requires the slos_read permission.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Cadenas de consulta

Nombre

Tipo

Descripción

ids [required]

string

A comma separated list of the IDs of the service level objectives objects.

Respuesta

OK

A service level objective response containing the requested object.

Expand All

Campo

Tipo

Descripción

data

object

An array of service level objective objects.

ok

[string]

An array of SLO IDs that can be safely deleted.

errors

object

A mapping of SLO id to it's current usages.

<any-key>

string

Description of the service level objective reference.

{
  "data": {
    "ok": []
  },
  "errors": {
    "<any-key>": "string"
  }
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Conflict

A service level objective response containing the requested object.

Expand All

Campo

Tipo

Descripción

data

object

An array of service level objective objects.

ok

[string]

An array of SLO IDs that can be safely deleted.

errors

object

A mapping of SLO id to it's current usages.

<any-key>

string

Description of the service level objective reference.

{
  "data": {
    "ok": []
  },
  "errors": {
    "<any-key>": "string"
  }
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Required query arguments
export ids="id1, id2, id3"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/can_delete?ids=${ids}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Check if SLOs can be safely deleted returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.check_can_delete_slo(
        ids="ids",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Check if SLOs can be safely deleted returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new
p api_instance.check_can_delete_slo("ids")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
require 'dogapi'

api_key = '<DATADOG_API_KEY>'
app_key = '<DATADOG_APPLICATION_KEY>'

dog = Dogapi::Client.new(api_key, app_key)

slo_ids = ['<YOUR_SLO_ID>']
dog.can_delete_service_level_objective(slo_ids)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Check if SLOs can be safely deleted returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.CheckCanDeleteSLO(ctx, "ids")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.CheckCanDeleteSLO`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.CheckCanDeleteSLO`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Check if SLOs can be safely deleted returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.CheckCanDeleteSLOResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    try {
      CheckCanDeleteSLOResponse result = apiInstance.checkCanDeleteSLO("ids");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#checkCanDeleteSLO");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

slo_ids = ['<YOUR_SLO_ID>']

initialize(**options)

api.ServiceLevelObjective.can_delete(slo_ids)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
// Check if SLOs can be safely deleted returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.check_can_delete_slo("ids".to_string()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Check if SLOs can be safely deleted returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

const params: v1.ServiceLevelObjectivesApiCheckCanDeleteSLORequest = {
  ids: "ids",
};

apiInstance
  .checkCanDeleteSLO(params)
  .then((data: v1.CheckCanDeleteSLOResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v1/slo/bulk_deletehttps://api.datadoghq.eu/api/v1/slo/bulk_deletehttps://api.ddog-gov.com/api/v1/slo/bulk_deletehttps://api.datadoghq.com/api/v1/slo/bulk_deletehttps://api.us3.datadoghq.com/api/v1/slo/bulk_deletehttps://api.us5.datadoghq.com/api/v1/slo/bulk_delete

Información general

Elimina (o elimina parcialmente) varios objetos de objetivos de nivel servicio.

Este endpoint facilita la eliminación de uno o varios umbrales para uno o varios objetos de objetivos de nivel de servicio. Si se eliminan todos los umbrales, el objeto de objetivos de nivel servicio también se elimina.

This endpoint requires the slos_write permission.

OAuth apps require the slos_write authorization scope to access this endpoint.

Solicitud

Body Data (required)

Elimina el cuerpo de una solicitud de varios objetos de objetivos de nivel servicio.

Expand All

Campo

Tipo

Descripción

<any-key>

[string]

An array of all SLO timeframes.

{
  "id1": [
    "7d",
    "30d"
  ],
  "id2": [
    "7d",
    "30d"
  ]
}

Respuesta

OK

The bulk partial delete service level objective object endpoint response.

This endpoint operates on multiple service level objective objects, so it may be partially successful. In such cases, the “data” and “error” fields in this response indicate which deletions succeeded and failed.

Expand All

Campo

Tipo

Descripción

data

object

An array of service level objective objects.

deleted

[string]

An array of service level objective object IDs that indicates which objects that were completely deleted.

updated

[string]

An array of service level objective object IDs that indicates which objects that were modified (objects for which at least one threshold was deleted, but that were not completely deleted).

errors

[object]

Array of errors object returned.

id [required]

string

The ID of the service level objective object associated with this error.

message [required]

string

The error message.

timeframe [required]

enum

The timeframe of the threshold associated with this error or "all" if all thresholds are affected. Allowed enum values: 7d,30d,90d,all

{
  "data": {
    "deleted": [],
    "updated": []
  },
  "errors": [
    {
      "id": "",
      "message": "",
      "timeframe": "30d"
    }
  ]
}

Bad Request

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/slo/bulk_delete" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "id1": [ "7d", "30d" ], "id2": [ "7d", "30d" ] } EOF
"""
Bulk Delete SLO Timeframes returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.service_level_objectives_api import ServiceLevelObjectivesApi
from datadog_api_client.v1.model.slo_bulk_delete import SLOBulkDelete
from datadog_api_client.v1.model.slo_timeframe import SLOTimeframe

body = SLOBulkDelete(
    id1=[
        SLOTimeframe.SEVEN_DAYS,
        SLOTimeframe.THIRTY_DAYS,
    ],
    id2=[
        SLOTimeframe.SEVEN_DAYS,
        SLOTimeframe.THIRTY_DAYS,
    ],
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.delete_slo_timeframe_in_bulk(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Bulk Delete SLO Timeframes returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::ServiceLevelObjectivesAPI.new

body = {
  id1: [
    DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
    DatadogAPIClient::V1::SLOTimeframe::THIRTY_DAYS,
  ], id2: [
    DatadogAPIClient::V1::SLOTimeframe::SEVEN_DAYS,
    DatadogAPIClient::V1::SLOTimeframe::THIRTY_DAYS,
  ],
}
p api_instance.delete_slo_timeframe_in_bulk(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
require 'dogapi'

api_key = '<DATADOG_API_KEY>'
app_key = '<DATADOG_APPLICATION_KEY>'

slo_id_one = '<YOUR_FIRST_SLO_ID>'.freeze
slo_id_two = '<YOUR_SECOND_SLO_ID>'.freeze

dog = Dogapi::Client.new(api_key, app_key)

# Delete multiple timeframes
thresholds = {
  slo_id_one => %w[7d],
  slo_id_two => %w[7d 30d]
}
dog.delete_timeframes_service_level_objective(thresholds)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Bulk Delete SLO Timeframes returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	body := map[string][]datadogV1.SLOTimeframe{
		"id1": []datadogV1.SLOTimeframe{
			datadogV1.SLOTIMEFRAME_SEVEN_DAYS,
			datadogV1.SLOTIMEFRAME_THIRTY_DAYS,
		},
		"id2": []datadogV1.SLOTimeframe{
			datadogV1.SLOTIMEFRAME_SEVEN_DAYS,
			datadogV1.SLOTIMEFRAME_THIRTY_DAYS,
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.DeleteSLOTimeframeInBulk(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.DeleteSLOTimeframeInBulk`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.DeleteSLOTimeframeInBulk`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Bulk Delete SLO Timeframes returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v1.model.SLOBulkDeleteResponse;
import com.datadog.api.client.v1.model.SLOTimeframe;
import java.util.Arrays;
import java.util.List;
import java.util.Map;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    Map<String, List<SLOTimeframe>> body =
        Map.ofEntries(
            Map.entry("id1", Arrays.asList(SLOTimeframe.SEVEN_DAYS, SLOTimeframe.THIRTY_DAYS)),
            Map.entry("id2", Arrays.asList(SLOTimeframe.SEVEN_DAYS, SLOTimeframe.THIRTY_DAYS)));

    try {
      SLOBulkDeleteResponse result = apiInstance.deleteSLOTimeframeInBulk(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling ServiceLevelObjectivesApi#deleteSLOTimeframeInBulk");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
from datadog import initialize, api

options = {
    'api_key': '<DATADOG_API_KEY>',
    'app_key': '<DATADOG_APPLICATION_KEY>'
}

slo_id_1 = '<YOUR_SLO_ID>'
slo_id_2 = '<YOUR_SLO_ID>'

initialize(**options)

delete_timeframes = {
  slo_id_1: ["7d"]
  slo_id_2: ["7d", "30d"]
}

api.ServiceLevelObjective.bulk_delete(delete_timeframes)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python "example.py"
// Bulk Delete SLO Timeframes returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_service_level_objectives::ServiceLevelObjectivesAPI;
use datadog_api_client::datadogV1::model::SLOTimeframe;
use std::collections::BTreeMap;

#[tokio::main]
async fn main() {
    let body = BTreeMap::from([
        (
            "id1".to_string(),
            vec![SLOTimeframe::SEVEN_DAYS, SLOTimeframe::THIRTY_DAYS],
        ),
        (
            "id2".to_string(),
            vec![SLOTimeframe::SEVEN_DAYS, SLOTimeframe::THIRTY_DAYS],
        ),
    ]);
    let configuration = datadog::Configuration::new();
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.delete_slo_timeframe_in_bulk(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Bulk Delete SLO Timeframes returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.ServiceLevelObjectivesApi(configuration);

const params: v1.ServiceLevelObjectivesApiDeleteSLOTimeframeInBulkRequest = {
  body: {
    id1: ["7d", "30d"],
    id2: ["7d", "30d"],
  },
};

apiInstance
  .deleteSLOTimeframeInBulk(params)
  .then((data: v1.SLOBulkDeleteResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

Note: This feature is in private beta. To request access, use the request access form in the Service Level Objectives docs.

POST https://api.ap1.datadoghq.com/api/v2/slo/reporthttps://api.datadoghq.eu/api/v2/slo/reporthttps://api.ddog-gov.com/api/v2/slo/reporthttps://api.datadoghq.com/api/v2/slo/reporthttps://api.us3.datadoghq.com/api/v2/slo/reporthttps://api.us5.datadoghq.com/api/v2/slo/report

Información general

Create a job to generate an SLO report. The report job is processed asynchronously and eventually results in a CSV report being available for download.

Check the status of the job and download the CSV report using the returned report_id.

This endpoint requires the slos_read permission.

OAuth apps require the slos_read authorization scope to access this endpoint.

Solicitud

Body Data (required)

Create SLO report job request body.

Expand All

Campo

Tipo

Descripción

data [required]

object

The data portion of the SLO report request.

attributes [required]

object

The attributes portion of the SLO report request.

from_ts [required]

int64

The from timestamp for the report in epoch seconds.

interval

enum

The frequency at which report data is to be generated. Allowed enum values: daily,weekly,monthly

query [required]

string

The query string used to filter SLO results. Some examples of queries include service:<service-name> and slo-name.

timezone

string

The timezone used to determine the start and end of each interval. For example, weekly intervals start at 12am on Sunday in the specified timezone.

to_ts [required]

int64

The to timestamp for the report in epoch seconds.

{
  "data": {
    "attributes": {
      "from_ts": 1633173071,
      "to_ts": 1636629071,
      "query": "slo_type:metric \"SLO Reporting Test\"",
      "interval": "monthly",
      "timezone": "America/New_York"
    }
  }
}

Respuesta

OK

The SLO report response.

Expand All

Campo

Tipo

Descripción

data

object

The data portion of the SLO report response.

id

string

The ID of the report job.

type

string

The type of ID.

{
  "data": {
    "id": "dc8d92aa-e0af-11ee-af21-1feeaccaa3a3",
    "type": "report_id"
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/slo/report" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "data": { "attributes": { "from_ts": 1633173071, "to_ts": 1636629071, "query": "slo_type:metric \"SLO Reporting Test\"", "interval": "monthly", "timezone": "America/New_York" } } } EOF
// Create a new SLO report returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"
	"time"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	body := datadogV2.SloReportCreateRequest{
		Data: datadogV2.SloReportCreateRequestData{
			Attributes: datadogV2.SloReportCreateRequestAttributes{
				FromTs:   time.Now().AddDate(0, 0, -40).Unix(),
				ToTs:     time.Now().Unix(),
				Query:    `slo_type:metric "SLO Reporting Test"`,
				Interval: datadogV2.SLOREPORTINTERVAL_MONTHLY.Ptr(),
				Timezone: datadog.PtrString("America/New_York"),
			},
		},
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.CreateSLOReportJob", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.CreateSLOReportJob(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.CreateSLOReportJob`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.CreateSLOReportJob`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Create a new SLO report returns "OK" response
import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v2.model.SLOReportInterval;
import com.datadog.api.client.v2.model.SLOReportPostResponse;
import com.datadog.api.client.v2.model.SloReportCreateRequest;
import com.datadog.api.client.v2.model.SloReportCreateRequestAttributes;
import com.datadog.api.client.v2.model.SloReportCreateRequestData;
import java.time.OffsetDateTime;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.createSLOReportJob", true);
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    SloReportCreateRequest body =
        new SloReportCreateRequest()
            .data(
                new SloReportCreateRequestData()
                    .attributes(
                        new SloReportCreateRequestAttributes()
                            .fromTs(OffsetDateTime.now().plusDays(-40).toInstant().getEpochSecond())
                            .toTs(OffsetDateTime.now().toInstant().getEpochSecond())
                            .query("""
slo_type:metric "SLO Reporting Test"
""")
                            .interval(SLOReportInterval.MONTHLY)
                            .timezone("America/New_York")));

    try {
      SLOReportPostResponse result = apiInstance.createSLOReportJob(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#createSLOReportJob");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
"""
Create a new SLO report returns "OK" response
"""

from datetime import datetime
from dateutil.relativedelta import relativedelta
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.service_level_objectives_api import ServiceLevelObjectivesApi
from datadog_api_client.v2.model.slo_report_create_request import SloReportCreateRequest
from datadog_api_client.v2.model.slo_report_create_request_attributes import SloReportCreateRequestAttributes
from datadog_api_client.v2.model.slo_report_create_request_data import SloReportCreateRequestData
from datadog_api_client.v2.model.slo_report_interval import SLOReportInterval

body = SloReportCreateRequest(
    data=SloReportCreateRequestData(
        attributes=SloReportCreateRequestAttributes(
            from_ts=int((datetime.now() + relativedelta(days=-40)).timestamp()),
            to_ts=int(datetime.now().timestamp()),
            query='slo_type:metric "SLO Reporting Test"',
            interval=SLOReportInterval.MONTHLY,
            timezone="America/New_York",
        ),
    ),
)

configuration = Configuration()
configuration.unstable_operations["create_slo_report_job"] = True
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.create_slo_report_job(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Create a new SLO report returns "OK" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.create_slo_report_job".to_sym] = true
end
api_instance = DatadogAPIClient::V2::ServiceLevelObjectivesAPI.new

body = DatadogAPIClient::V2::SloReportCreateRequest.new({
  data: DatadogAPIClient::V2::SloReportCreateRequestData.new({
    attributes: DatadogAPIClient::V2::SloReportCreateRequestAttributes.new({
      from_ts: (Time.now + -40 * 86400).to_i,
      to_ts: Time.now.to_i,
      query: 'slo_type:metric "SLO Reporting Test"',
      interval: DatadogAPIClient::V2::SLOReportInterval::MONTHLY,
      timezone: "America/New_York",
    }),
  }),
})
p api_instance.create_slo_report_job(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Create a new SLO report returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_service_level_objectives::ServiceLevelObjectivesAPI;
use datadog_api_client::datadogV2::model::SLOReportInterval;
use datadog_api_client::datadogV2::model::SloReportCreateRequest;
use datadog_api_client::datadogV2::model::SloReportCreateRequestAttributes;
use datadog_api_client::datadogV2::model::SloReportCreateRequestData;

#[tokio::main]
async fn main() {
    let body = SloReportCreateRequest::new(SloReportCreateRequestData::new(
        SloReportCreateRequestAttributes::new(
            1633173071,
            r#"slo_type:metric "SLO Reporting Test""#.to_string(),
            1636629071,
        )
        .interval(SLOReportInterval::MONTHLY)
        .timezone("America/New_York".to_string()),
    ));
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.CreateSLOReportJob", true);
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.create_slo_report_job(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Create a new SLO report returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.createSLOReportJob"] = true;
const apiInstance = new v2.ServiceLevelObjectivesApi(configuration);

const params: v2.ServiceLevelObjectivesApiCreateSLOReportJobRequest = {
  body: {
    data: {
      attributes: {
        fromTs: Math.round(
          new Date(new Date().getTime() + -40 * 86400 * 1000).getTime() / 1000
        ),
        toTs: Math.round(new Date().getTime() / 1000),
        query: `slo_type:metric "SLO Reporting Test"`,
        interval: "monthly",
        timezone: "America/New_York",
      },
    },
  },
};

apiInstance
  .createSLOReportJob(params)
  .then((data: v2.SLOReportPostResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

Note: This feature is in private beta. To request access, use the request access form in the Service Level Objectives docs.

GET https://api.ap1.datadoghq.com/api/v2/slo/report/{report_id}/statushttps://api.datadoghq.eu/api/v2/slo/report/{report_id}/statushttps://api.ddog-gov.com/api/v2/slo/report/{report_id}/statushttps://api.datadoghq.com/api/v2/slo/report/{report_id}/statushttps://api.us3.datadoghq.com/api/v2/slo/report/{report_id}/statushttps://api.us5.datadoghq.com/api/v2/slo/report/{report_id}/status

Información general

Get the status of the SLO report job.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

report_id [required]

string

The ID of the report job.

Respuesta

OK

The SLO report status response.

Expand All

Campo

Tipo

Descripción

data

object

The data portion of the SLO report status response.

attributes

object

The attributes portion of the SLO report status response.

status

enum

The status of the SLO report job. Allowed enum values: in_progress,completed,completed_with_errors,failed

id

string

The ID of the report job.

type

string

The type of ID.

{
  "data": {
    "attributes": {
      "status": "completed"
    },
    "id": "dc8d92aa-e0af-11ee-af21-1feeaccaa3a3",
    "type": "report_id"
  }
}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export report_id="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/slo/report/${report_id}/status" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get SLO report status returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.service_level_objectives_api import ServiceLevelObjectivesApi

# there is a valid "report" in the system
REPORT_DATA_ID = environ["REPORT_DATA_ID"]

configuration = Configuration()
configuration.unstable_operations["get_slo_report_job_status"] = True
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.get_slo_report_job_status(
        report_id=REPORT_DATA_ID,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get SLO report status returns "OK" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.get_slo_report_job_status".to_sym] = true
end
api_instance = DatadogAPIClient::V2::ServiceLevelObjectivesAPI.new

# there is a valid "report" in the system
REPORT_DATA_ID = ENV["REPORT_DATA_ID"]
p api_instance.get_slo_report_job_status(REPORT_DATA_ID)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get SLO report status returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	// there is a valid "report" in the system
	ReportDataID := os.Getenv("REPORT_DATA_ID")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.GetSLOReportJobStatus", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.GetSLOReportJobStatus(ctx, ReportDataID)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.GetSLOReportJobStatus`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.GetSLOReportJobStatus`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get SLO report status returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ServiceLevelObjectivesApi;
import com.datadog.api.client.v2.model.SLOReportStatusGetResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.getSLOReportJobStatus", true);
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    // there is a valid "report" in the system
    String REPORT_DATA_ID = System.getenv("REPORT_DATA_ID");

    try {
      SLOReportStatusGetResponse result = apiInstance.getSLOReportJobStatus(REPORT_DATA_ID);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#getSLOReportJobStatus");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Get SLO report status returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    // there is a valid "report" in the system
    let report_data_id = std::env::var("REPORT_DATA_ID").unwrap();
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.GetSLOReportJobStatus", true);
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api.get_slo_report_job_status(report_data_id.clone()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get SLO report status returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.getSLOReportJobStatus"] = true;
const apiInstance = new v2.ServiceLevelObjectivesApi(configuration);

// there is a valid "report" in the system
const REPORT_DATA_ID = process.env.REPORT_DATA_ID as string;

const params: v2.ServiceLevelObjectivesApiGetSLOReportJobStatusRequest = {
  reportId: REPORT_DATA_ID,
};

apiInstance
  .getSLOReportJobStatus(params)
  .then((data: v2.SLOReportStatusGetResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

Note: This feature is in private beta. To request access, use the request access form in the Service Level Objectives docs.

GET https://api.ap1.datadoghq.com/api/v2/slo/report/{report_id}/downloadhttps://api.datadoghq.eu/api/v2/slo/report/{report_id}/downloadhttps://api.ddog-gov.com/api/v2/slo/report/{report_id}/downloadhttps://api.datadoghq.com/api/v2/slo/report/{report_id}/downloadhttps://api.us3.datadoghq.com/api/v2/slo/report/{report_id}/downloadhttps://api.us5.datadoghq.com/api/v2/slo/report/{report_id}/download

Información general

Download an SLO report. This can only be performed after the report job has completed.

Reports are not guaranteed to exist indefinitely. Datadog recommends that you download the report as soon as it is available.

OAuth apps require the slos_read authorization scope to access this endpoint.

Argumentos

Parámetros de ruta

Nombre

Tipo

Descripción

report_id [required]

string

The ID of the report job.

Respuesta

OK

Expand All

Campo

Tipo

Descripción

No response body

{}

Bad Request

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Forbidden

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Not Found

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

API error response.

Expand All

Campo

Tipo

Descripción

errors [required]

[string]

A list of errors.

{
  "errors": [
    "Bad Request"
  ]
}

Ejemplo de código

                  # Path parameters
export report_id="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v2/slo/report/${report_id}/download" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get SLO report returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v2.api.service_level_objectives_api import ServiceLevelObjectivesApi

configuration = Configuration()
configuration.unstable_operations["get_slo_report"] = True
with ApiClient(configuration) as api_client:
    api_instance = ServiceLevelObjectivesApi(api_client)
    response = api_instance.get_slo_report(
        report_id="9fb2dc2a-ead0-11ee-a174-9fe3a9d7627f",
    )

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Get SLO report returns "OK" response

require "datadog_api_client"
DatadogAPIClient.configure do |config|
  config.unstable_operations["v2.get_slo_report".to_sym] = true
end
api_instance = DatadogAPIClient::V2::ServiceLevelObjectivesAPI.new
p api_instance.get_slo_report("9fb2dc2a-ead0-11ee-a174-9fe3a9d7627f")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Get SLO report returns "OK" response

package main

import (
	"context"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV2"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	configuration.SetUnstableOperationEnabled("v2.GetSLOReport", true)
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV2.NewServiceLevelObjectivesApi(apiClient)
	resp, r, err := api.GetSLOReport(ctx, "9fb2dc2a-ead0-11ee-a174-9fe3a9d7627f")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `ServiceLevelObjectivesApi.GetSLOReport`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	fmt.Fprintf(os.Stdout, "Response from `ServiceLevelObjectivesApi.GetSLOReport`:\n%s\n", resp)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Get SLO report returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v2.api.ServiceLevelObjectivesApi;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    defaultClient.setUnstableOperationEnabled("v2.getSLOReport", true);
    ServiceLevelObjectivesApi apiInstance = new ServiceLevelObjectivesApi(defaultClient);

    try {
      String result = apiInstance.getSLOReport("9fb2dc2a-ead0-11ee-a174-9fe3a9d7627f");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling ServiceLevelObjectivesApi#getSLOReport");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
// Get SLO report returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV2::api_service_level_objectives::ServiceLevelObjectivesAPI;

#[tokio::main]
async fn main() {
    let mut configuration = datadog::Configuration::new();
    configuration.set_unstable_operation_enabled("v2.GetSLOReport", true);
    let api = ServiceLevelObjectivesAPI::with_config(configuration);
    let resp = api
        .get_slo_report("9fb2dc2a-ead0-11ee-a174-9fe3a9d7627f".to_string())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Get SLO report returns "OK" response
 */

import { client, v2 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
configuration.unstableOperations["v2.getSLOReport"] = true;
const apiInstance = new v2.ServiceLevelObjectivesApi(configuration);

const params: v2.ServiceLevelObjectivesApiGetSLOReportRequest = {
  reportId: "9fb2dc2a-ead0-11ee-a174-9fe3a9d7627f",
};

apiInstance
  .getSLOReport(params)
  .then((data: string) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers